Cisco Systems STEV SRT-M-66, 2654T6 appendix Figure A-3 Preparing the Scissor-Jack Platform

Page 12

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Figure A-3 Preparing the Scissor-Jack Platform

 

ELOS

 

NOC

 

LLE

 

RERICXR

 

E RAC

 

VICTA

T

X

ESER

UA

0

0

1-OTLS-TLOS

T

C

JE

E

PKT IER RX CARR ACTIVE

RX

 

6

 

TX

 

RX

RX

55

TX

TX

RX

RX

4

4

TX

TX

RX

RX

3

3

TX

TX

RX

RX

22

TX

TX

RX

RX

1

1

TX

TX

RX

RX

00

TX

TX

IER

R

TIVECA

CA

2

T

K

R P

RIERX

R

TIVECA

AC

1

RKTP

IE X

R R

AR

TIVEC

AC

0

TL/

O

CA

RO

NI

M

R

OJ

A

M

LA

CI

TIRC

29189

Warning Do not attempt to lift the chassis with the handles on the back and sides of the chassis. These handles are not designed to support the weight of the chassis, and should be used only to steady and guide the chassis while it is being inserted into or removed from an equipment rack. To reduce the risk of damage to the chassis and serious bodily injury, do not use these handles to lift or support the chassis.

Step 4 Position one person in front of the router to support and guide it while the second person slowly pushes the router to slide it off the rack-mounting table, out of the rack, and onto the scissor-jack platform. (See Figure A-4.)

 

Cisco XR 12416 Router Chassis Installation Guide

A-12

OL-xxxxx-xx

Image 12
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Safety Recommendations Tools and EquipmentPowering Down the Router Removing the Router from the RackDisconnecting RP Cables Disconnecting Alarm Card CablesDisconnecting Power Cables from the Power Shelf Removing the Front CoversRemoving Components from the Chassis to Reduce Weight Removing Power ModulesDetaching the Supplemental Bonding and Grounding Connection Removing the Blower ModulesRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Installing the Router on the Shipping Pallet Pallet body Pallet front bar Top view of pallet partsReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling Components in the Router Reinstalling the Cards in the Upper and Lower Card CagesReinstalling the Cards in the Switch Fabric Card Cage Reinstalling the Power ModulesRepackaging the Router Accessories Reinstalling the Front CoversRepackaging the Rack-Mounting Platform Repackaging the Vertical Cable-Management Troughs Repackaging the Center-Mount Rack-Mounting BracketsRepackaging the Miscellaneous Accessories Reassembling the Accessories PackageCompleting the Repackaging Repackaging the Replaced Router Chassis Router Replacement Chassis Shipping Container Reinstalling the Replaced Chassis on the Shipping PalletRepackaging the Replaced Chassis for Shipment