Cisco Systems 2654T6, STEV SRT-M-66 appendix Removing Components from the Chassis to Reduce Weight

Page 9

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

If your router is equipped with the DC-input power shelf, disconnect the eight source DC positive and negative power cables and the single ground cable from the terminal studs on the back panel of the power shelf as instructed in the “Removing and Installing a DC-Input Power Shelf” section on page 5-54.

Removing Components from the Chassis to Reduce Weight

A fully-equipped router can weigh as much as 415 lb (188 kg). To reduce the top-end weight of the chassis and lower the center of gravity, which might make the chassis more stable as you move it, you may choose to remove some of the components from the chassis.

Procedures in the following sections describe the steps for removing some of the router components:

Removing Power Modules, page A-9

Removing the Blower Modules, page A-10

Removing the Cards from the Chassis Card Cages, page A-10

Removing Power Modules

Each AC-input power supply weighs 12.7 lb (5.7 kg). By electing to remove the three power supplies from the standard AC-input power shelf, you reduce the top-end weight of the chassis by approximately 38.1 lb (17.1 kg). By electing to remove the four power supplies from the optional AC-input power shelf, you reduce the top-end weight of the chassis by approximately 50.8 lb (22.8kg) Remove the AC-input power supplies as described in the “Installing AC-Input Power Supplies” section on page 3-75.

Each DC-input power entry module weighs 6.4 lb (2.9 kg). By electing to remove the four power entry modules from the power shelf, you reduce the top-end weight of the chassis by approximately 25.6 lb (11.6 kg). Remove the DC-input power entry modules as described in the“Removing DC-Input PEMs” section on page 3-12.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-9

 

 

 

Image 9
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterDisconnecting Alarm Card Cables Disconnecting RP CablesDisconnecting Power Cables from the Power Shelf Removing the Front CoversRemoving Power Modules Removing Components from the Chassis to Reduce WeightDetaching the Supplemental Bonding and Grounding Connection Removing the Blower ModulesRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Upper and Lower Card Cages Reinstalling Components in the RouterReinstalling the Cards in the Switch Fabric Card Cage Reinstalling the Power ModulesRepackaging the Router Accessories Reinstalling the Front CoversRepackaging the Rack-Mounting Platform Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment