Cisco Systems STEV SRT-M-66, 2654T6 appendix See Figure A-6

Page 14

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Figure A-5

Installing the Chassis Anchor Clips

Front of chassis

 

CONSOLE

 

LLE

 

RIECX

 

ERAR

 

VITCAC

SETRE

AUX

1-OTSL0-OTSL

T

 

EJEC

 

0

TK P REI XR R AR VE C ITC A

RX

 

6

 

TX

 

RX

RX

5

5

TX

TX

RX

RX

4

4

TX

TX

RX

RX

3

3

TX

TX

RX

RX

2

2

TX

TX

RX

RX

1

1

TX

TX

RX

RX

0

0

TX

TX

R

EIR

R

EVI AC

T

AC

2

T

R KP

IERXR

R

EVI AC

TC

A

1

T

R KP

EIR XR

R

E CA

IV

TC

A

0

O/LT

AC

OR

MIN

JOR

MA

ALIC

RIT

C

29188

Step 6 With one person positioned on the side of the router to prevent it from tipping, use the 3/4-inch (19-mm) socket and ratchet wrench to turn the scissor-jack screw clockwise slowly and close the scissor-jack platform to lower the chassis.

(See Figure A-6.)

 

Cisco XR 12416 Router Chassis Installation Guide

A-14

OL-xxxxx-xx

Image 14
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Safety Recommendations Tools and EquipmentPowering Down the Router Removing the Router from the RackDisconnecting Power Cables from the Power Shelf Disconnecting RP CablesDisconnecting Alarm Card Cables Removing the Front CoversRemoving Components from the Chassis to Reduce Weight Removing Power ModulesRemoving the Cards from the Chassis Card Cages Detaching the Supplemental Bonding and Grounding ConnectionRemoving the Blower Modules Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Installing the Router on the Shipping Pallet Pallet body Pallet front bar Top view of pallet partsReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Cards in the Switch Fabric Card Cage Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Power ModulesRepackaging the Rack-Mounting Platform Repackaging the Router AccessoriesReinstalling the Front Covers Repackaging the Vertical Cable-Management Troughs Repackaging the Center-Mount Rack-Mounting BracketsRepackaging the Miscellaneous Accessories Reassembling the Accessories PackageCompleting the Repackaging Repackaging the Replaced Router Chassis Router Replacement Chassis Shipping Container Reinstalling the Replaced Chassis on the Shipping PalletRepackaging the Replaced Chassis for Shipment