Cisco Systems 2654T6, STEV SRT-M-66 appendix Chassis anchor Clip and bolt On each side

Page 15

Appendix A Repackaging the Router

Repackaging the Routers

REVIEW DRAFT — CISCO CONFIDENTIAL

Figure A-6

Closing the Scissor-Jack Platform to Lower the Chassis

Front of chassis

Scissor-jack screw

Counter-clockwise expands platform

 

CONSOLE

 

LE

 

ERIRCXR

 

EIVAC

 

TCA

SETRE

AUX

 

0

1- 0-

 

LOTS SLOT

T

 

JECE

 

TK P RIE RX R R VEI AC TCA

RX

 

6

 

TX

 

RX

RX

5

5

TX

TX

RX

RX

4

4

TX

TX

RX

RX

3

3

TX

TX

RX

RX

2

2

TX

TX

RX

RX

1

1

TX

TX

RX

RX

0

0

TX

TX

R EIR EVI AC T C A

T R KP EIRXR R EV AC IT C A

RTPK EIR XR R EV AC TI C A

Chassis anchor

clip and bolt

(2 on each side)

/LT ACO

2

INOR

M

JOR

MA

ICAL

CRIT

1

0

29187

Scissor-jack

platform

Clockwise closes platform

Step 7 Position the safety hand truck at one side of the router, slide the router and scissor-jack platform onto the safety hand truck, and secure the router to the hand truck with the locking safety strap.

Step 8 Tilt the safety hand truck onto its outrigger wheels to move the chassis to a level, open space with a solid floor, where the chassis can be repackaged for shipping.

 

 

Cisco XR 12416 Router Chassis Installation Guide

 

 

 

 

 

 

OL-xxxxx-xx

 

 

A-15

 

 

 

Image 15
Contents Repackaging the Router Router Shipping Package Review Draft Cisco Confidential Figure A-1 Router Shipping Package Components Figure A-2 Router Accessories Package Tools and Equipment Safety RecommendationsRemoving the Router from the Rack Powering Down the RouterRemoving the Front Covers Disconnecting RP CablesDisconnecting Alarm Card Cables Disconnecting Power Cables from the Power ShelfRemoving Power Modules Removing Components from the Chassis to Reduce WeightDetaching the Supplemental Bonding and Grounding Connection Removing the Blower ModulesRemoving the Cards from the Chassis Card Cages Removing the Router from the Equipment Rack Figure A-3 Preparing the Scissor-Jack Platform See Figure A-5 See Figure A-6 Chassis anchor Clip and bolt On each side Pallet body Pallet front bar Top view of pallet parts Installing the Router on the Shipping PalletReview Draft Cisco Confidential Review Draft Cisco Confidential Reinstalling the Power Modules Reinstalling Components in the RouterReinstalling the Cards in the Upper and Lower Card Cages Reinstalling the Cards in the Switch Fabric Card CageRepackaging the Router Accessories Reinstalling the Front CoversRepackaging the Rack-Mounting Platform Repackaging the Center-Mount Rack-Mounting Brackets Repackaging the Vertical Cable-Management TroughsReassembling the Accessories Package Repackaging the Miscellaneous AccessoriesCompleting the Repackaging Repackaging the Replaced Router Chassis Reinstalling the Replaced Chassis on the Shipping Pallet Router Replacement Chassis Shipping ContainerRepackaging the Replaced Chassis for Shipment