Grizzly G0459P Power Supply, Availability, Full-Load Current Rating, Circuit Requirements

Page 13

SECTION 2: POWER SUPPLY

Availability

7Z[dgZ^chiVaa^c\i]ZbVX]^cZ!Xdch^YZgi]ZVkV^a" VW^a^inVcYegdm^b^ind[i]ZgZfj^gZYedlZghjeean X^gXj^i# >[ Vc Zm^hi^c\ X^gXj^i YdZh cdi bZZi i]Z gZfj^gZbZcih[dgi]^hbVX]^cZ!VcZlX^gXj^ibjhi WZ ^chiVaaZY# Id b^c^b^oZ i]Z g^h` d[ ZaZXigdXj" i^dc![^gZ!dgZfj^ebZciYVbV\Z!^chiVaaVi^dcldg` VcYZaZXig^XVal^g^c\bjhiWZYdcZWnVfjVa^[^ZY ZaZXig^X^Vc^cVXXdgYVcXZl^i]VaaVeea^XVWaZXdYZh VcYhiVcYVgYh#

Electrocution, fire, or equipment damage may occur if machine is not correctly grounded and connected to the power supply.

Full-Load Current Rating

I]Z [jaa"adVY XjggZci gVi^c\ ^h i]Z VbeZgV\Z V bVX]^cZYgVlhVi&%%d[i]ZgViZYdjiejiedlZg# Dc bVX]^cZh l^i] bjai^eaZ bdidgh! i]^h ^h i]Z VbeZgV\ZYgVlcWni]ZaVg\Zhibdidgdghjbd[Vaa bdidgh VcY ZaZXig^XVa YZk^XZh i]Vi b^\]i deZgViZ VidcZi^bZYjg^c\cdgbVadeZgVi^dch#

Full-Load Current Rating at 110V....14.1 Amps

I]Z[jaa"adVYXjggZci^hcdii]ZbVm^bjbVbdjci d[Vbehi]Vii]ZbVX]^cZl^aaYgVl#>[i]ZbVX]^cZ ^hdkZgadVYZY!^il^aaYgVlVYY^i^dcVaVbehWZndcY i]Z[jaa"adVYgVi^c\#

>[i]ZbVX]^cZ^hdkZgadVYZY[dgVhj[[^X^ZciaZc\i] d[i^bZ!YVbV\Z!dkZg]ZVi^c\!dg[^gZbVngZhjai ZheZX^Vaan ^[ XdccZXiZY id Vc jcYZgh^oZY X^gXj^i# Id gZYjXZ i]Z g^h` d[ i]ZhZ ]VoVgYh! Vkd^Y dkZg" adVY^c\ i]Z bVX]^cZ Yjg^c\ deZgVi^dc VcY bV`Z hjgZ^i^hXdccZXiZYidVedlZghjeeanX^gXj^ii]Vi bZZihi]ZgZfj^gZbZcih^ci]Z[daadl^c\hZXi^dc#

Circuit Requirements

I]^h bVX]^cZ ^h egZl^gZY id deZgViZ dc V &&%K edlZghjeeanX^gXj^ii]Vi]VhVkZg^[^ZY\gdjcYVcY bZZihi]Z[daadl^c\gZfj^gZbZcih/

Nominal Voltage

110V/120V

Cycle

60 Hz

Phase

Single-Phase

Power Supply Circuit

15 Amps

6 edlZg hjeean X^gXj^i ^cXajYZh Vaa ZaZXig^XVa Zfj^ebZciWZilZZci]ZWgZV`ZgWdmdg[jhZeVcZa ^ci]ZWj^aY^c\VcYi]ZbVX]^cZ#I]ZedlZghje" eanX^gXj^ijhZY[dgi]^hbVX]^cZbjhiWZh^oZYid hV[Zan]VcYaZi]Z[jaa"adVYXjggZciYgVlc[gdbi]Z bVX]^cZ [dg Vc ZmiZcYZY eZg^dY d[ i^bZ# >[ i]^h bVX]^cZ ^h XdccZXiZY id V X^gXj^i egdiZXiZY Wn [jhZh!jhZVi^bZYZaVn[jhZbVg`ZY9#

For your own safety and protection of property, consult a qualified electrician if you are unsure about wiring practices or electrical codes in your area.

Note: The circuit requirements listed in this man- ual apply to a dedicated circuit—where only one machine will be running at a time. If this machine will be connected to a shared circuit where mul- tiple machines will be running at the same time, consult a qualified electrician to ensure that the circuit is properly sized for safe operation.

Model G0459/G0459P (Mfg. 7/11+)

-11-

Image 13
Contents Drum Sander Ss ,EAD from Leadbased PAINTS Table of Contents Manual Accuracy IntroductionContact Info Machine DescriptionFront view, Model G0459 Identification$&+,1$7$ Drum Information $&+,1$7$ Conveyor Feed Rate 47 17.3 FPM Safety Instructions for Machinery SafetyZghWZXdbZVYhigVXidc# Children & BYSTANDERS. @ZZe XaYgZcAdditional Safety for Drum Sanders Availability Power SupplyFull-Load Current Rating Circuit RequirementsExtension Cords Grounding & Plug RequirementsMinimum Gauge Size 14 AWG 50 ftNeeded for Setup SetupUnpacking InventorySite Considerations Mounting Installing Crank HandleComponents and Hardware Needed Qty Connecting Power Power ConnectionDisconnecting Power Dust CollectionTest Run Recommended AdjustmentsTo test run the machine Operation Overview OperationsBasic Controls Disabling & Locking SwitchStock Inspection Requirements Sanding TipsTo set the depth of cut Depth of CutVariable Speed Sanding To adjust the conveyor speedTo sand a workpiece Choosing Sandpaper Paper ReplacementGrit Class Usage To change sandpaperG4679-Anti-Static Grounding Kit AccessoriesPRO-STICKSanding Pad Size ModelCleaning MaintenanceSchedule LubricationPillow Block Bearings Troubleshooting ServiceMotor & Electrical Sanding Operations Drums Gauge Blocks Belt ServiceTension To adjust V-belt tension Removal/ReplacementPulley Alignment To align the pulleysTensioning Conveyor Tensioning TrackingTracking To tension the conveyorDrum parallel to conveyor belt Model G0459/G0459P Mfg /11+ Drum AdjustmentsDrum perpendicular to feed direction To adjust the pillow block bearingsTo adjust the pressure rollers to the factory setting Factory SettingPressure Roller HeightTools Needed Qty Phillips Head Screwdriver Scale Pointer CalibrationTo calibrate the scale pointer Table Lift Screws To adjust the table lift screwsTo replace the conveyor belt Conveyor Belt ReplacementTo Step Drum sander disassembledBrass Shims IVWaZ To replace the motor brushes Changing Motor BrushesWiring Safety Instructions WiringCapacitor Feed motor110 VAC Wiring DiagramFrame PartsDescription Frame Parts ListDescription DrumConveyor Label Placement Conveyor Parts List10. 8dbbZcih Warranty Card99.$5342!, .# 0//88 %,,.!- 7!  Warranty and Returns Order Hours a DAY