Grizzly G0459P owner manual Brass Shims

Page 42

11.Mark the top of the table lift screws with arrows (all pointing in same direction) and mark the screws with liquid correction fluid above the mounting bracket (Figure 46). Later, when you reassemble the conveyor table, you can use these marks to reset the table height close to the current position.

NEW

PHOTO

Figure 46. Locations to mark table lift screws.

12.Mark the chain and sprockets with correction fluid.

13.Loosen the idler roller sprocket (Figure 39), carefully pull the chain off of all the sprockets, and remove it from the cabinet.

14.Loosen the conveyor belt at the front adjust- ments, as shown in Figure 47.

Figure 47. Conveyor belt loosened at the front

adjustments (only one shown).

-40-

15.Disconnect the conveyor feed motor wires from the circuit board.

16.Remove the scale pointer.

Before removing the table, note the number and location of brass shims (Figure 48) under the table lift screws. Knowing their correct position will help you align the conveyor table during reas- sembly.

Brass

Shims

Figure 48. Brass shims.

17.With the help of an assistant, carefully lift the table off of the drum sander cabinet, as shown in Figure 49.

Figure 49. Example of lifting the table off of the

drum sander cabinet with two people.

Model G0459/G0459P (Mfg. 7/11+)

Image 42
Contents Drum Sander Ss ,EAD from Leadbased PAINTS Table of Contents Contact Info IntroductionManual Accuracy Machine DescriptionIdentification Front view, Model G0459$&+,1$7$ Drum Information $&+,1$7$ Conveyor Feed Rate 47 17.3 FPM Safety Safety Instructions for MachineryChildren & BYSTANDERS. @ZZe XaYgZc ZghWZXdbZVYhigVXidc#Additional Safety for Drum Sanders Full-Load Current Rating Power SupplyAvailability Circuit RequirementsMinimum Gauge Size 14 AWG Grounding & Plug RequirementsExtension Cords 50 ftUnpacking SetupNeeded for Setup InventorySite Considerations Installing Crank Handle MountingComponents and Hardware Needed Qty Disconnecting Power Power ConnectionConnecting Power Dust CollectionRecommended Adjustments Test RunTo test run the machine Operations Operation OverviewDisabling & Locking Switch Basic ControlsSanding Tips Stock Inspection RequirementsDepth of Cut To set the depth of cutTo adjust the conveyor speed Variable Speed SandingTo sand a workpiece Grit Class Usage Paper ReplacementChoosing Sandpaper To change sandpaperPRO-STICKSanding Pad AccessoriesG4679-Anti-Static Grounding Kit Size ModelSchedule MaintenanceCleaning LubricationPillow Block Bearings Service TroubleshootingMotor & Electrical Sanding Operations Drums Belt Service Gauge BlocksTension Pulley Alignment Removal/ReplacementTo adjust V-belt tension To align the pulleysTracking Conveyor Tensioning TrackingTensioning To tension the conveyorDrum Adjustments Drum parallel to conveyor belt Model G0459/G0459P Mfg /11+To adjust the pillow block bearings Drum perpendicular to feed directionPressure Roller Factory SettingTo adjust the pressure rollers to the factory setting HeightScale Pointer Calibration Tools Needed Qty Phillips Head ScrewdriverTo calibrate the scale pointer To adjust the table lift screws Table Lift ScrewsConveyor Belt Replacement To replace the conveyor beltDrum sander disassembled To StepBrass Shims IVWaZ Changing Motor Brushes To replace the motor brushesWiring Wiring Safety InstructionsFeed motor CapacitorWiring Diagram 110 VACParts FrameFrame Parts List DescriptionDrum DescriptionConveyor Conveyor Parts List Label PlacementWarranty Card 10. 8dbbZcih99.$5342!, .# 0//88 %,,.!- 7!  Warranty and Returns Order Hours a DAY