GE EPM 6000 Multi-function Power Metering System Changing Settings in Configuration Mode

Page 61

CHAPTER 4: USING THE METER

4.3Changing Settings in Configuration Mode

4.3.1Description

The following procedure describes how the navigate the configuration mode menu.

ZPress the MENU Button from any of the auto-scrolling readings.

ZPress DOWN to display the configuration mode (CFG) in the “A” screen.

wPress ENTER to scroll through the configuration parameters, starting at the SCrL Ct Pt screen.

ZPush the DOWN Button to scroll all the parameters: scroll, CT, PT, connection (Cnct) and port.

The active parameter is always flashing and displayed in the “A” screen.

4.3.2Configuring the Scroll Feature

Use the following procedure to configure the scroll feature.

ZPress the ENTER button to display the SCrL no message.

ZPress the RIGHT button to change the display to SCrL YES as shown below.

FIGURE 4–6: Scroll Mode Configuration

EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE

4–9

Image 61
Contents Chapter Page Table of Contents Using the Meter Miscellaneous TOC-4 Description IntroductionHighlights EPM 6000 Highlights Universal Voltage Inputs FeaturesCurrent Inputs Utility Peak DemandEPM 6000 Measured Values Measured ValuesOrder Codes OrderingEPM 6000 Order Codes Inputs/Outputs SpecificationsMetering Communications EnvironmentalMechanical Parameters Approvals Type TestingThree-Phase Power Measurement Wye Connection Three-Phase System ConfigurationsVcn Common Phase Voltages on Wye ServicesDelta Connection Three-Phase Delta Winding RelationshipThree-Phase, Four-Wire Delta Phasors Blondells Theorem and Three-Phase MeasurementPhase B Phase C Node n Phase a Electrical Background Power Power, Energy, and DemandEnergy Power Use Over Time Demand Power and Energy Relationship Over TimeEnergy Use and Demand Intervals Real, Reactive, and Apparent Power Reactive Energy and Power FactorApparent power Power FactorHarmonics of a Non-Sinusoidal Waveform Harmonic DistortionVoltage and Current Monitoring Inductive and Capacitive ImpedanceWaveform Capture Typical Power Quality Problems Power QualityElectrical Background Dimensions Mechanical InstallationAnsi and DIN Mounting Panel Cutouts Ansi Installation StepsAnsi Mounting Procedure DIN Installation StepsDIN Mounting Procedure Installation Considerations Electrical InstallationCT Leads Pass-Through No Meter Termination CT Leads Terminated to MeterQuick Connect Crimp CT Terminations Voltage and Power Supply ConnectionsVoltage Connection Ground ConnectionsWiring Diagrams 4-Wire Wye with no PTs and 3 CTs, 3 Element 2 Wye, 4-Wire with no PTs and 3 CTs, 3 Element10 4-Wire Wye with no PTs and 3 CTs, 2.5 Element 3 Wye, 4-Wire with no PTs and 3 CTs, 2.5 Element11 4-Wire Wye with 3 PTs and 3 CTs, 3 Element 4 Wye, 4-Wire with 3 PTs and 3 CTs, 3 Element12 4-Wire Wye with 2 PTs and 3 CTs, 2.5 Element 5 Wye, 4-Wire with 2 PTs and 3 CTs, 2.5 Element13 3-Wire Delta with no PTs and 2 CTs Delta, 3-Wire with no PTs and 2 CTs14 3-Wire Delta with 2 PTs and 2 CTs Delta, 3-Wire with 2 PTs and 2 CTsCurrent-Only Measurement Three-Phase Current-Only Measurement Dual-Phase Current-Only Measurement Single-Phase IrDA COM1 Port Communications Setup3 RS485 COM2 Port 16 RS485 Communications Installation Faceplate Elements Front Panel InterfaceFaceplate Buttons Using the Meter% of Load Bar Segments Percentage of Load BarEPM 6000 Accuracy Test Constants Watt-Hour Accuracy Testing VerificationOverview Configuring the Meter via the Front PanelStart Up Main Menu Reset Mode and Password EntryUsing the Meter Using the Meter Configuring the Scroll Feature Changing Settings in Configuration ModeProgramming the Configuration Mode Screens Configuring the CT Setting Value for amps is a product of the Ct-nand the Ct-Svalues Configuring the PT SettingConfiguring the Connection Setting Configuring the Communication Port Setting Address Using the Meter Operating Mode Parameter Readings Operating ModeUsing the Meter Memory Map Description Modbus CommunicationsMemory Map HEX Range Units or Comments THD Block7 Description 1 Format Range 7532 PT denominator Secondary Readings Section Modbus Memory Map NotesCommunications Modbus Memory Map Data Formats DNP Point Maps DNP Point MappingDNP Point Mapping Sheet 1 DNP Point Mapping Sheet 2 DNP Point Map Notes Data Link Layer DNP ImplementationTransport Layer Following function codes are implemented on the EPM Application LayerBinary Output Status Object 10, Variation DNP Objects and VariationsControl Relay Output Object 12, Variation 5 16-Bit Analog Input Without Flag Object 30, Variation 4 32-Bit Binary Counter Without Flag Object 20, VariationInternal Indications Object 80, Variation Class 0 Data Object 60, VariationCommunications Introduction Navigation MapsMain Menu Navigation Main Menu ScreensOperating Mode Navigation Operating Mode ScreensReset Mode Navigation Reset Mode ScreensConfiguration Mode Screens Release Dates Revision HistoryChanges to the Manual Major Updates for 1601-0215-A2 GE Multilin Warranty WarrantyIndex Irda Power Supply Wiring