GE EPM 6000 Multi-function Power Metering System Modbus Communications, Memory Map Description

Page 71

GE Consumer & Industrial

Multilin

EPM 6000 Multi-function Power

Metering System

Chapter 5: Communications

5.1Modbus Communications

5.1.1 Memory Map Description

The Modbus memory map is divided into four primary sections:

1.Fixed data registers: addresses 0001 to 0021.

2.Meter data registers: addresses 1000 to 5003.

The meter data registers read as “0” until the first readings are available or if the meter is not in operating mode. Writes to these registers will be accepted but will have no effect on the register.

3.Command registers: addresses 20000 to 26011.

The command registers always read as “0”. The may be written only when the meter is in a suitable mode. The registers return an illegal data address exception if a write is attempted in an incorrect mode.

4.Programmable settings registers: addresses 30000 to 30026.

All registers explicitly listed in the table read as “0”. Writes to these registers will be accepted but won’t actually the register, since it doesn’t exist.

5.1.2Memory Map

The Modbus memory map is shown below. Additional notes indicated in the memory map (“See Note ...”) are located at the end of the table, as well as a description of the format codes.

EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE

5–1

Image 71
Contents Chapter Page Table of Contents Using the Meter Miscellaneous TOC-4 Highlights IntroductionDescription EPM 6000 Highlights Utility Peak Demand FeaturesUniversal Voltage Inputs Current InputsEPM 6000 Measured Values Measured ValuesEPM 6000 Order Codes OrderingOrder Codes Metering SpecificationsInputs/Outputs Mechanical Parameters EnvironmentalCommunications Approvals Type TestingThree-Phase Power Measurement Wye Connection Three-Phase System ConfigurationsVcn Common Phase Voltages on Wye ServicesDelta Connection Three-Phase Delta Winding RelationshipThree-Phase, Four-Wire Delta Phasors Blondells Theorem and Three-Phase MeasurementPhase B Phase C Node n Phase a Electrical Background Energy Power, Energy, and DemandPower Power Use Over Time Demand Power and Energy Relationship Over TimeEnergy Use and Demand Intervals Real, Reactive, and Apparent Power Reactive Energy and Power FactorApparent power Power FactorHarmonics of a Non-Sinusoidal Waveform Harmonic DistortionVoltage and Current Monitoring Inductive and Capacitive ImpedanceWaveform Capture Typical Power Quality Problems Power QualityElectrical Background Dimensions Mechanical InstallationAnsi and DIN Mounting Panel Cutouts Ansi Installation StepsAnsi Mounting Procedure DIN Installation StepsDIN Mounting Procedure Installation Considerations Electrical InstallationCT Leads Pass-Through No Meter Termination CT Leads Terminated to MeterQuick Connect Crimp CT Terminations Voltage and Power Supply ConnectionsVoltage Connection Ground ConnectionsWiring Diagrams 4-Wire Wye with no PTs and 3 CTs, 3 Element 2 Wye, 4-Wire with no PTs and 3 CTs, 3 Element10 4-Wire Wye with no PTs and 3 CTs, 2.5 Element 3 Wye, 4-Wire with no PTs and 3 CTs, 2.5 Element11 4-Wire Wye with 3 PTs and 3 CTs, 3 Element 4 Wye, 4-Wire with 3 PTs and 3 CTs, 3 Element12 4-Wire Wye with 2 PTs and 3 CTs, 2.5 Element 5 Wye, 4-Wire with 2 PTs and 3 CTs, 2.5 Element13 3-Wire Delta with no PTs and 2 CTs Delta, 3-Wire with no PTs and 2 CTs14 3-Wire Delta with 2 PTs and 2 CTs Delta, 3-Wire with 2 PTs and 2 CTsCurrent-Only Measurement Three-Phase Current-Only Measurement Dual-Phase Current-Only Measurement Single-Phase 3 RS485 COM2 Port Communications SetupIrDA COM1 Port 16 RS485 Communications Installation Faceplate Elements Front Panel InterfaceFaceplate Buttons Using the Meter% of Load Bar Segments Percentage of Load BarEPM 6000 Accuracy Test Constants Watt-Hour Accuracy Testing VerificationStart Up Configuring the Meter via the Front PanelOverview Main Menu Reset Mode and Password EntryUsing the Meter Using the Meter Configuring the Scroll Feature Changing Settings in Configuration ModeProgramming the Configuration Mode Screens Configuring the CT Setting Value for amps is a product of the Ct-nand the Ct-Svalues Configuring the PT SettingConfiguring the Connection Setting Configuring the Communication Port Setting Address Using the Meter Operating Mode Parameter Readings Operating ModeUsing the Meter Memory Map Modbus CommunicationsMemory Map Description HEX Range Units or Comments THD Block7 Description 1 Format Range 7532 PT denominator Secondary Readings Section Modbus Memory Map NotesCommunications Modbus Memory Map Data Formats DNP Point Mapping Sheet 1 DNP Point MappingDNP Point Maps DNP Point Mapping Sheet 2 DNP Point Map Notes Transport Layer DNP ImplementationData Link Layer Following function codes are implemented on the EPM Application LayerControl Relay Output Object 12, Variation DNP Objects and VariationsBinary Output Status Object 10, Variation 5 16-Bit Analog Input Without Flag Object 30, Variation 4 32-Bit Binary Counter Without Flag Object 20, VariationInternal Indications Object 80, Variation Class 0 Data Object 60, VariationCommunications Introduction Navigation MapsMain Menu Navigation Main Menu ScreensOperating Mode Navigation Operating Mode ScreensReset Mode Navigation Reset Mode ScreensConfiguration Mode Screens Changes to the Manual Revision HistoryRelease Dates Major Updates for 1601-0215-A2 GE Multilin Warranty WarrantyIndex Irda Power Supply Wiring