GE EPM 6000 Multi-function Power Metering System instruction manual Configuring the CT Setting

Page 63

CHAPTER 4: USING THE METER

The Stor ALL donE message will appear and the meter will reset.

4.3.4Configuring the CT Setting

Use the following procedure to program the CT setting.

ZPush the DOWN Button to scroll through the configuration mode parameters.

Press ENTER when Ct is the active parameter (i.e. it is in the “A” screen and flashing).

This will display the and the Ct-n(CT numerator) screen.

ZPress ENTER again to change to display the Ct-d(CT denominator) screen.

The Ct-dvalue is preset to a 1 or 5 A at the factory and cannot be changed.

EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE

4–11

Image 63
Contents Chapter Page Table of Contents Using the Meter Miscellaneous TOC-4 Introduction DescriptionHighlights EPM 6000 Highlights Utility Peak Demand FeaturesUniversal Voltage Inputs Current InputsEPM 6000 Measured Values Measured ValuesOrdering Order CodesEPM 6000 Order Codes Specifications Inputs/OutputsMetering Environmental CommunicationsMechanical Parameters Approvals Type TestingThree-Phase Power Measurement Wye Connection Three-Phase System ConfigurationsVcn Common Phase Voltages on Wye ServicesDelta Connection Three-Phase Delta Winding RelationshipThree-Phase, Four-Wire Delta Phasors Blondells Theorem and Three-Phase MeasurementPhase B Phase C Node n Phase a Electrical Background Power, Energy, and Demand PowerEnergy Power Use Over Time Demand Power and Energy Relationship Over TimeEnergy Use and Demand Intervals Real, Reactive, and Apparent Power Reactive Energy and Power FactorApparent power Power FactorHarmonics of a Non-Sinusoidal Waveform Harmonic DistortionVoltage and Current Monitoring Inductive and Capacitive ImpedanceWaveform Capture Typical Power Quality Problems Power QualityElectrical Background Dimensions Mechanical InstallationAnsi and DIN Mounting Panel Cutouts Ansi Installation StepsAnsi Mounting Procedure DIN Installation StepsDIN Mounting Procedure Installation Considerations Electrical InstallationCT Leads Pass-Through No Meter Termination CT Leads Terminated to MeterQuick Connect Crimp CT Terminations Voltage and Power Supply ConnectionsVoltage Connection Ground ConnectionsWiring Diagrams 4-Wire Wye with no PTs and 3 CTs, 3 Element 2 Wye, 4-Wire with no PTs and 3 CTs, 3 Element10 4-Wire Wye with no PTs and 3 CTs, 2.5 Element 3 Wye, 4-Wire with no PTs and 3 CTs, 2.5 Element11 4-Wire Wye with 3 PTs and 3 CTs, 3 Element 4 Wye, 4-Wire with 3 PTs and 3 CTs, 3 Element12 4-Wire Wye with 2 PTs and 3 CTs, 2.5 Element 5 Wye, 4-Wire with 2 PTs and 3 CTs, 2.5 Element13 3-Wire Delta with no PTs and 2 CTs Delta, 3-Wire with no PTs and 2 CTs14 3-Wire Delta with 2 PTs and 2 CTs Delta, 3-Wire with 2 PTs and 2 CTsCurrent-Only Measurement Three-Phase Current-Only Measurement Dual-Phase Current-Only Measurement Single-Phase Communications Setup IrDA COM1 Port3 RS485 COM2 Port 16 RS485 Communications Installation Faceplate Elements Front Panel InterfaceFaceplate Buttons Using the Meter% of Load Bar Segments Percentage of Load BarEPM 6000 Accuracy Test Constants Watt-Hour Accuracy Testing VerificationConfiguring the Meter via the Front Panel OverviewStart Up Main Menu Reset Mode and Password EntryUsing the Meter Using the Meter Configuring the Scroll Feature Changing Settings in Configuration ModeProgramming the Configuration Mode Screens Configuring the CT Setting Value for amps is a product of the Ct-nand the Ct-Svalues Configuring the PT SettingConfiguring the Connection Setting Configuring the Communication Port Setting Address Using the Meter Operating Mode Parameter Readings Operating ModeUsing the Meter Modbus Communications Memory Map DescriptionMemory Map HEX Range Units or Comments THD Block7 Description 1 Format Range 7532 PT denominator Secondary Readings Section Modbus Memory Map NotesCommunications Modbus Memory Map Data Formats DNP Point Mapping DNP Point MapsDNP Point Mapping Sheet 1 DNP Point Mapping Sheet 2 DNP Point Map Notes DNP Implementation Data Link LayerTransport Layer Following function codes are implemented on the EPM Application LayerDNP Objects and Variations Binary Output Status Object 10, VariationControl Relay Output Object 12, Variation 5 16-Bit Analog Input Without Flag Object 30, Variation 4 32-Bit Binary Counter Without Flag Object 20, VariationInternal Indications Object 80, Variation Class 0 Data Object 60, VariationCommunications Introduction Navigation MapsMain Menu Navigation Main Menu ScreensOperating Mode Navigation Operating Mode ScreensReset Mode Navigation Reset Mode ScreensConfiguration Mode Screens Revision History Release DatesChanges to the Manual Major Updates for 1601-0215-A2 GE Multilin Warranty WarrantyIndex Irda Power Supply Wiring