GE EPM 6000 Multi-function Power Metering System Phase B Phase C Node n Phase a

Page 20

CHAPTER 2: ELECTRICAL BACKGROUND

In a three-phase, four-wire wye system it is necessary to use three elements. Three voltage coils are connected between the three phases and the common neutral conductor. A current coil is required in each of the three phases.

In modern digital meters, Blondell's Theorem is still applied to obtain proper metering. The difference in modern meters is that the digital meter measures each phase voltage and current and calculates the single-phase power for each phase. The meter then sums the three phase powers to a single three-phase reading.

Some digital meters calculate the individual phase power values one phase at a time. This means the meter samples the voltage and current on one phase and calculates a power value. Then it samples the second phase and calculates the power for the second phase. Finally, it samples the third phase and calculates that phase power. After sampling all three phases, the meter combines the three readings to create the equivalent three-phase power value. Using mathematical averaging techniques, this method can derive a quite accurate measurement of three-phase power.

More advanced meters actually sample all three phases of voltage and current simultaneously and calculate the individual phase and three-phase power values. The advantage of simultaneous sampling is the reduction of error introduced due to the difference in time when the samples were taken.

Blondell's Theorem is a derivation that results from Kirchhoff's Law. Kirchhoff's Law states that the sum of the currents into a node is zero. Another way of stating the same thing is that the current into a node (connection point) must equal the current out of the node. The law can be applied to measuring three-phase loads. The figure below shows a typical connection of a three-phase load applied to a three-phase, four-wire service. Kirchhoff's Laws hold that the sum of currents A, B, C and N must equal zero or that the sum of currents into Node “n” must equal zero.

C

B

Phase B

Phase C

Node "n"

Phase A

A

N

FIGURE 2–6: Three-Phase Load Illustrating Kirchhoff’s Law and Blondell’s Theorem

2–6

EPM 6000 MULTI-FUNCTION POWER METERING SYSTEM – USER GUIDE

Image 20
Contents Chapter Page Table of Contents Using the Meter Miscellaneous TOC-4 Highlights IntroductionDescription EPM 6000 Highlights Features Universal Voltage InputsCurrent Inputs Utility Peak DemandMeasured Values EPM 6000 Measured ValuesEPM 6000 Order Codes OrderingOrder Codes Metering SpecificationsInputs/Outputs Mechanical Parameters EnvironmentalCommunications Type Testing ApprovalsThree-Phase Power Measurement Three-Phase System Configurations Wye ConnectionCommon Phase Voltages on Wye Services VcnThree-Phase Delta Winding Relationship Delta ConnectionBlondells Theorem and Three-Phase Measurement Three-Phase, Four-Wire Delta PhasorsPhase B Phase C Node n Phase a Electrical Background Energy Power, Energy, and DemandPower Power Use Over Time Power and Energy Relationship Over Time DemandEnergy Use and Demand Intervals Reactive Energy and Power Factor Real, Reactive, and Apparent PowerPower Factor Apparent powerHarmonic Distortion Harmonics of a Non-Sinusoidal WaveformInductive and Capacitive Impedance Voltage and Current MonitoringWaveform Capture Power Quality Typical Power Quality ProblemsElectrical Background Mechanical Installation DimensionsAnsi Installation Steps Ansi and DIN Mounting Panel CutoutsDIN Installation Steps Ansi Mounting ProcedureDIN Mounting Procedure Electrical Installation Installation ConsiderationsCT Leads Terminated to Meter CT Leads Pass-Through No Meter TerminationVoltage and Power Supply Connections Quick Connect Crimp CT TerminationsGround Connections Voltage ConnectionWiring Diagrams 2 Wye, 4-Wire with no PTs and 3 CTs, 3 Element 4-Wire Wye with no PTs and 3 CTs, 3 Element3 Wye, 4-Wire with no PTs and 3 CTs, 2.5 Element 10 4-Wire Wye with no PTs and 3 CTs, 2.5 Element4 Wye, 4-Wire with 3 PTs and 3 CTs, 3 Element 11 4-Wire Wye with 3 PTs and 3 CTs, 3 Element5 Wye, 4-Wire with 2 PTs and 3 CTs, 2.5 Element 12 4-Wire Wye with 2 PTs and 3 CTs, 2.5 ElementDelta, 3-Wire with no PTs and 2 CTs 13 3-Wire Delta with no PTs and 2 CTsDelta, 3-Wire with 2 PTs and 2 CTs 14 3-Wire Delta with 2 PTs and 2 CTsCurrent-Only Measurement Three-Phase Current-Only Measurement Dual-Phase Current-Only Measurement Single-Phase 3 RS485 COM2 Port Communications SetupIrDA COM1 Port 16 RS485 Communications Installation Front Panel Interface Faceplate ElementsUsing the Meter Faceplate ButtonsPercentage of Load Bar % of Load Bar SegmentsWatt-Hour Accuracy Testing Verification EPM 6000 Accuracy Test ConstantsStart Up Configuring the Meter via the Front PanelOverview Reset Mode and Password Entry Main MenuUsing the Meter Using the Meter Changing Settings in Configuration Mode Configuring the Scroll FeatureProgramming the Configuration Mode Screens Configuring the CT Setting Configuring the PT Setting Value for amps is a product of the Ct-nand the Ct-SvaluesConfiguring the Connection Setting Configuring the Communication Port Setting Address Using the Meter Operating Mode Operating Mode Parameter ReadingsUsing the Meter Memory Map Modbus CommunicationsMemory Map Description HEX Range Units or Comments THD Block7 Description 1 Format Range 7532 PT denominator Modbus Memory Map Notes Secondary Readings SectionCommunications Modbus Memory Map Data Formats DNP Point Mapping Sheet 1 DNP Point MappingDNP Point Maps DNP Point Mapping Sheet 2 DNP Point Map Notes Transport Layer DNP ImplementationData Link Layer Application Layer Following function codes are implemented on the EPMControl Relay Output Object 12, Variation DNP Objects and VariationsBinary Output Status Object 10, Variation 4 32-Bit Binary Counter Without Flag Object 20, Variation 5 16-Bit Analog Input Without Flag Object 30, VariationClass 0 Data Object 60, Variation Internal Indications Object 80, VariationCommunications Navigation Maps IntroductionMain Menu Screens Main Menu NavigationOperating Mode Screens Operating Mode NavigationReset Mode Screens Reset Mode NavigationConfiguration Mode Screens Changes to the Manual Revision HistoryRelease Dates Major Updates for 1601-0215-A2 Warranty GE Multilin WarrantyIndex Irda Power Supply Wiring