Section 2 – Cabinet Conversion

Set Up the Hardware

Set Up AC Power Distribution

You must install the AC power strip/surge suppressor from the kit to provide power to the computer, new monitor (if installed), and ventilation fan.

The actual wiring will vary depending on which cabinet you are converting. Use the instructions that follow as a general guideline for setting up AC power distribution.

1.Locate the AC power panel inside the cabinet. The panel is usually the distributing point for all of the AC power lines inside the cabinet. If the panel is on the floor of the cabinet, you will need to move it to one of the side walls to make enough room to secure the computer to the bottom of the cabinet.

2.Disconnect the two AC power lines and the ground wire that connect to the ON/OFF switch on the AC power panel, as shown by the arrows in the picture above.

3.Strip these three wires and connect them to the AC power cord from the kit, using the wire crimps provided. (You will be plugging this power cord into the power strip.)

4.Connect the power and ground wires from AC power strip to the three connectors on the ON/OFF switch where you removed the wires in step 2, as shown by the arrow in the picture above.

5.Plug the AC power cord you spliced in step 3 into the AC power strip. All cabinet AC power should now be routed through the power strip.

 

© 2004 GLOBAL VR®, INC.

040-0050-01 Rev. A 10/29/2004

Page 15 of 48

Image 15
Contents GvrSX Conversion Instructions System Manual Table of Figures Table of ContentsPreface Safety FCC Notices United States GvrSX design showcases the following features Game DescriptionGvrSX provides the following benefits to operators Upgrade Steps Clean and Prepare the CabinetCabinet Conversion Remove old Tournament Header and Card Reader Conversion Kit Contents and Replacement Parts List Optional Monitor Upgrade Kit Components PGA-UPGRADE-MTR CDs, Labels, and ManualsArtwork Replace the Monitor Optional Remove the Old MonitorAdapt the Cabinet for the Larger Monitor Page Install the New Monitor Drilling Cabinet Air Holes Install the Cabinet Exhaust FanPage Set Up AC Power Distribution Set Up the HardwareRemove the Game PCB and Install New Hardware Ground Connect the Jamma Conversion Board and UVC+5 VDC +12 VDCHapp Ugci Board Connections Install the Happ Ugci BoardSet Up the Computer Connect the Computer Secure the Computer Upgrade the Control Panel Prepare the Control PanelApply Control Panel Graphics Install Buttons and Connect Wiring Apply the Cabinet Graphics and Marquee Artwork Apply the Serial Number Sticker Run the Joystick Calibration Utility Power on and Test the CabinetUVC DIP Switch Settings Adjust the Universal Video Converter UVCSetting Game Options and Resets Using the Game Operator MenuMachine Menu Game Mode Menu All High Score Stats Game Resets MenuAll Audit Coin Stats All Audit Game StatsGame Purchase Audit Coin AuditsPlayer Control Test Game SelectionMonitor Calibration Test Starting a Game Information Bar Description Playing a Beach Head GameUSB Game Dongles Operating System Restore CD System Software CDsGame Software CDs Problem Possible Cause Possible Solution TroubleshootingTroubleshooting Video Problems Troubleshooting Audio ProblemsTroubleshooting Computer Problems Troubleshooting Miscellaneous Problems Troubleshooting Control ProblemsTroubleshooting Configuration with New Wells-Gardner Monitor Diagrams and SchematicsDetailed Wiring Diagram Computer Rear Panel Diagram Computer Rear Panel DiagramWarranty Information Warranty ServicePage Technical Support