Atari 040-0050-01 manual Power on and Test the Cabinet, Run the Joystick Calibration Utility

Page 26

Section 3 – Power ON and Test the Cabinet

Section 3 – Power ON and Test the Cabinet

Before powering the cabinet ON for the first time, please verify the following:

AC power is correctly setup inside the cabinet.

The DC power supply is correctly setup to provide power to the Jamma Conversion Board.

All connections are correct and secure.

Once you have verified that all hardware is installed correctly, power ON the cabinet and verify that the game starts and runs properly, and that all controls function properly.

Use the Player Control Test (see page 33) from the Operator Menu to verify that the joystick and buttons are working properly.

Insert some coins and verify that the coin inputs are working properly. Start a game (see page 35) and verify that it plays properly.

Run the Joystick Calibration Utility

The Joystick Calibration Utility adjusts the software to match the joystick motion. Run the Joystick Calibration Utility whenever you replace the joystick or install game software on the system.

1.Insert the Joystick Calibration Utility CD in the computer CD-drive. The CD will run automatically. You will see a series of processing screens, followed by windows telling you to move the joystick in certain ways.

2.Move the joystick as instructed by the onscreen prompts.

3.Ignore the windows that refer to "Throttle" and "Rudder." Simply click the trigger to exit from these windows.

gvrSX™ Conversion System Manual

 

Page 26 of 48

040-0050-01 Rev. A 10/29/2004

Image 26
Contents GvrSX Conversion Instructions System Manual Table of Contents Table of FiguresPreface Safety FCC Notices United States GvrSX provides the following benefits to operators GvrSX design showcases the following featuresGame Description Cabinet Conversion Upgrade StepsClean and Prepare the Cabinet Remove old Tournament Header and Card Reader Conversion Kit Contents and Replacement Parts List Artwork Optional Monitor Upgrade Kit Components PGA-UPGRADE-MTRCDs, Labels, and Manuals Adapt the Cabinet for the Larger Monitor Replace the Monitor OptionalRemove the Old Monitor Page Install the New Monitor Install the Cabinet Exhaust Fan Drilling Cabinet Air HolesPage Set Up the Hardware Set Up AC Power DistributionRemove the Game PCB and Install New Hardware +12 VDC Connect the Jamma Conversion Board and UVC+5 VDC GroundInstall the Happ Ugci Board Happ Ugci Board ConnectionsSet Up the Computer Connect the Computer Secure the Computer Apply Control Panel Graphics Upgrade the Control PanelPrepare the Control Panel Install Buttons and Connect Wiring Apply the Cabinet Graphics and Marquee Artwork Apply the Serial Number Sticker Power on and Test the Cabinet Run the Joystick Calibration UtilityAdjust the Universal Video Converter UVC UVC DIP Switch SettingsUsing the Game Operator Menu Setting Game Options and ResetsMachine Menu Game Mode Menu All Audit Game Stats Game Resets MenuAll Audit Coin Stats All High Score StatsCoin Audits Game Purchase AuditGame Selection Player Control TestMonitor Calibration Test Starting a Game Playing a Beach Head Game Information Bar DescriptionUSB Game Dongles Game Software CDs Operating System Restore CDSystem Software CDs Troubleshooting Audio Problems TroubleshootingTroubleshooting Video Problems Problem Possible Cause Possible SolutionTroubleshooting Computer Problems Troubleshooting Control Problems Troubleshooting Miscellaneous ProblemsTroubleshooting Diagrams and Schematics Configuration with New Wells-Gardner MonitorDetailed Wiring Diagram Computer Rear Panel Diagram Computer Rear Panel DiagramWarranty Service Warranty InformationPage Technical Support