Toshiba RAV-SM1100UT-E, RAV-SM1400UT-E Connection procedure, Check the draining, Drain up

Page 40

3 DRAIN PIPING WORK

Connection procedure

Connect a socket and a hard vinyl chloride pipe.

Using adhesive agent for vinyl chloride pipe, connect the drain pipes certainly so that water does not leak.

It takes approx. 10 hours to dry and harden the adhesive agent. During this period, do not apply force to the connecting part with the drain pipe.

Perform heat insulating.

As shown in the figure, cover the flexible hose and hose band with the attached heat insulator up to the bottom of the indoor unit without gap.

Flexible hose

Hose band

Check the draining

In the test run, check that water drain is properly performed and water does not leak from the connecting part of the pipes.

Be sure to check draining also when installed in heating period.

Using a pitcher or hose, pour water (1500 to 2000cc) into the discharge port before installation of the ceiling panel.

Pour water gradually so that water does not spread on the motor of the drain pump.

Heat exchanger

Drain pan

Attached heat insulator

Heat insulator to be

 

procured locally

 

Hard vinyl chloride pipe

Drain up

When a downward grading cannot be secured on the drain pipe, drain-up up to 640mm is possible.

Set downward grading immediately after raising up vertically.

Rising up 640mm or less

850mm or less

 

up

360mm

Rising

or less

 

Indoor unit

Underneath of ceiling

After the electric work has finished, pour water during COOL mode operation.

If the electric work has not yet finished, pull out the float switch connector (CN34 : Red) from the electric parts box, and check draining by plugging the single phase 220/230/240V power to the terminal blocks 1 and 2.

If doing so, the drain pump motor operates.

Test water drain while checking the operation sound of the drain pump motor.

(If the operation sound changes from continuous sound to intermittent sound, water is normally drained.)

After the check, the drain pump motor runs, connecting the float switch connector.

(In case of check by pulling out the float switch connector, be sure to return the connector to the original position.)

 

 

Single phase 220/230/240V

 

1

2

 

 

White

CN34

 

Red

(RED)

Black

 

 

 

Pull out connector CN34 (Red) from P.C. board. Black

37

Image 40
Contents Split Type Accessories Adoption of NEW RefrigerantInstallation Manual Way Air Discharge Cassette TypePrecautions for Safety New Refrigerant Air Conditioner InstallationTo Disconnect the Appliance from Main Power Supply Connect the connecting cable correctlyInappropriate grounding may cause electric shock Accessory and Refrigerant Selection of InstallationAccessory and Installation Parts Before installationInstallation Place Necessary Space for InstallationObstacle at rear side Upper side is free Obstacle at front side Upper side is freeInstallation of Outdoor Unit Standard installationSerial installation at front and rear sides Obstacles at both front and rear sidesKnockout procedure Refrigerant Piping ConnectionFor Reference Piping connectionRefrigerant Piping Pipe Forming/End PositioningTightening of Connecting Part RequirementAir Purge EvacuatingVacuum pump How to open the valve How to close the valveHow to wire Stripping length power cord and connecting cableSingle phase 50 Hz Electrical WorkCheck and Test Operation Final Installation ChecksSelf-Diagnosis by LED Indication New tools for R410A Changes in the product and componentsNew tools for R410A Applicable to R22 model Changes Accessories Sold Separately Precautions for SafetyRAV-SM1100AT-E RAV-SM1400AT-E Indoor unit Parts NameOutdoor unit Parts Name of Remote Controller Display sectionOperation section Turn on the main power switch and/or the leakage breaker Correct UsagePreparation StopMode select button Mode Temperature buttonWhen restarting the operation after stop StartHow to set up the wind direction How to start swingingHow to stop swinging Heat operationTimer operation Timer OperationCancel of timer operation Window curtains Never open doors and windows more often than necessaryGet uniform circulation of room air Maintenance Cleaning of remote controllerIf you do not plan to use the unit for more than 1 month Checks before operationAIR Conditioner Operations and Performance RE-INSTALLATION Do not install the air conditioner in the following placesTroubles and Causes Be careful with noise or vibrationsInoperative Separate sold parts Part name ’ty Shape UsagePart name ’ty Shape Part namePrecautions for Safety Inappropriate grounding may cause electric shock Selection of Installation Place Installation spaceAvoid installing in the following places Model RAVSelection of installation place Discharge direction AdviceHeight list of ceiling possible to be installed Ceiling heightExternal view Model RAVSM1100UT-E SM1400UT-E Installation of hanging bolt Installation of ceiling opening and hanging boltInstallation of ceiling panel Sold separately Drain Piping Work Piping/Heat insulating materialFlexible hose Adhesive inhibitedConnection procedure Check the drainingDrain up Perform heat insulatingPermissible Piping Length and Heat Flaring dia meter size a Unit mmTightening connection Tightening torque of flare pipe connectionsUse a vacuum pump Open the valve fullyGas leak check Thermal insulation processPacked valve handling precautions Valve at gas sideBe sure to connect earth wire. Grounding work Remote controller wiringCable connection Cabling on the ceiling panelRemote Controller Cabling Cabling diagramWiring diagram CablingHow to execute a test run Case of wired remote controllerProcedure Test RUNConfirmation of error history TroubleshootingConfirmation and check Maintenance Accessories ContentsTCB-AX21U W-E 85464189556000Remote Controller Precautions for SafetyName and Operation HOW to SET the FAN Speed Signal Receiving PartDisplay Section Operation SectionHOW to Operate the Unit HOW to Operate the TimerSlide Switch HOW to Adjust AIR DirectionHOW to Insert the Batteries HOW to USE the Remote Controller Correctly HOW to Handle the Remote ControllerAddress HOW to Perform Emergency Operation Before Asking Repair WorkStart Before asking a repair work, check the following itemsFeatures Turn on the power supply of the air conditionerHow to check the program operation time RBC-EXW21EName and Operation of Each Part HOW to USE the Timer Correctly When push SET Button, Set errorWhen ON/OFF time is set as follows, Error is displayed Next set up the operation time to the program 2Clearance of Holiday setup Push DAY button and put the operationTo be checked Clear of a part of the programOperation of program weekly timer and air conditioner Matters to be memorized Power failureResuming of operation RBC-AS21E Temperature Setup button Selected mode displays Heat pump typeSelected mode displays Cooling only type Start/Stop button Check button Used in servicingHOW to Operate AIR Conditioner Power supplyPush either or set to Auto Recommended temperature Push button Push button to select fan speedInstallation Manual Installation of adjust corner cap Installation of suction grilleCheck after installation For wireless remote controllerAccessory parts How to install remote controllerRequirement for installation Multiple remote controllers Requirement to install Remote controllerAccessory parts Requirement for installation Multiple remote controllersRemote controller test run setup Installation placeAccessory parts Part Name ’ty How to install the program weekly timerRequirement to install Program weekly timer Program weekly timer test run setupRequirement to install the remote sensor Accessory partsHow to install the remote sensor Drain-up Kit For Concealed Duct Type Indoor Unit To Personnel Charged in Installation Work and Service For Installation Professionals Use for Indoor Unit OnlyComponents Combination List of Adapter PartsCase of 4-way Ceiling Cassette RAV-SM **0 UT-E Case of Concealed Duct RAV-SM **0 BT-EAddress No. setup table SW01 ProcedureContents Main To Customers