1. Installation of drain-up kit body (See Fig. 1.)

Open the cover of drain-up kit body, align the position and fasten the body using the attached 4 tapping screws.

2. Hose connection (See Fig. 1.)

• First connect the drain hose to pipe at the drain port of the drain up kit,

and then connect it to the drain port of the air conditioner body.

Tighten the both ends of the drain hose with hose band. In this time, be

P.C. board

To drain up

Cable

CN030

(RED)

CN068 CN030

(BLUE) (RED)

3

1

3

1

3

1

3

1

Drain pump

(DP)

Float switch

(FS)

WARNING

Ask the qualified installation professional to install the drain up kit.

If drain up kit is inappropriate installed by yourself, it may cause a water leak, an electric shock fire and so on.

Install the drain up kit surely according to this installation manual.

When re-install the drain up kit, also ask the qualified installation professional to install it.

If drain up kit is installed by yourself, it may cause a water leak, an electric shock fire and so on.

Configuration

 

sure to set the screw section of the hose band toward upper side.

Apply thermal insulation the drain hose with the attached thermal

 

insulation pipe.

 

Set the both ends of the drain hose closely to the drain pan.

If a gap is generated on the matched section of the thermal insulation

 

materials at the both ends, seal the section by winding the thermal

 

insulation tape.

3. Drain piping

Be sure to set the drain pipe from the drain up kit with falling gradient. Support and fix the drain pipe at an appropriate position so that an excessive load is not applied on the drain port.

Be sure to apply thermal insulation (procured locally) to the drain pipe.

<Fig. 1>

Air conditioner body

Drain up kit

 

Arrange the cables so that they do not apply

a tension upon the

drain-up kit body and the connector section.

CN068 (BLUE)

Test run

Condition check of water drain

After the electric work and cabling work, check the drain is smoothly discharged by running the air conditioner in COOL mode.

If the cooling operation does not continue for a long time, pour water into the drain pan of the air conditioner body to check whether the drain is smoothly discharged or not.

Check there is no water leak at each connecting section.

71

 

Name

Q’ty

 

Name

Q’ty

A

Drain up kit body

1

E

Bundling band

3

 

 

 

 

 

 

B

Drain hose

1

F

Tapping screw

4

 

 

 

 

 

 

C

Hose band

2

G

Thermal insulation tape

2

 

 

 

 

 

 

D

Thermal insulation pipe

1

 

 

 

Drain outlet

Discharge duct

Check lid

30

Mounting screws

(4 pcs.)

 

 

 

Electric

parts box

Cable

Operation check of float switch

During cooling operation, operate the float switch.

Check the air conditioner stops the cooling operation under condition that the drain pump keeps operating.

After operation in COOL mode, operate the float switch.

In this time, check that the drain pump works to discharge the drain.

CD

A B

E F

Drain pan (Drain port)

Drain hose,

thermal insulation pipe

Drain inlet (Drain port)

Suction panel

<Position of float switch>

Float switch

35

To handle the float switch, remove the front panel of the kit and push up the floating section of the float switch with a screwdriver, etc.

Be careful not to operate the float switch consecutively for 2 minutes or more because the air conditioner stops abnormally.

G

REQUIREMENT

Be sure to install the drain up kit correctly according to the procedure described in this Installation Manual. Otherwise, the position of the drain pan on the drain up kit does not match with one on the air conditioner body, resulting in a water leak.

Check the level of the air conditioner.

(Check that it is horizontally set or the drain port side of the air conditioner is set with an inclination within 1˚ downward.)

Be sure to make a check port to the lower ceiling part of the drain up kit.

*Using the hose band, tighten the drain port and drain inlet of the drain pan. Also, be sure to set the screw section of the hose band toward upper side.

4. Cabling (See Fig. 2.)

Remove cover of the electric parts box of the air conditioner body.

Insert 3P connector (BLUE) of the drain up kit into the terminal No. CN068 (BLUE) in the electric parts box.

Remove the short circuit connector (No. CN030) on the P.C. board in electric parts box.

Insert 3P connector (RED) of the drain up kit into the terminal No. CN030 (RED) (Short-circuit connector is not used.)

Clamp the cable in the electric parts box.

Maintenance/Check

In order to put the function of the air conditioner and the drain-up kit fully to practical use, the regular maintenance and check are necessary, together with correct usage.

For the air conditioner body and the drain-up kit especially, check dirt of the drain pan once per year before cooling season and clean them if dirt is heavy.

It is recommended to make a contract with the customers for maintenance and check.

EH99824201 (EN)

Image 74
Contents Split Type Accessories Adoption of NEW RefrigerantInstallation Manual Way Air Discharge Cassette TypeTo Disconnect the Appliance from Main Power Supply Precautions for SafetyNew Refrigerant Air Conditioner Installation Connect the connecting cable correctlyInappropriate grounding may cause electric shock Accessory and Installation Parts Accessory and RefrigerantSelection of Installation Before installationObstacle at rear side Upper side is free Installation PlaceNecessary Space for Installation Obstacle at front side Upper side is freeSerial installation at front and rear sides Installation of Outdoor UnitStandard installation Obstacles at both front and rear sidesFor Reference Knockout procedureRefrigerant Piping Connection Piping connectionRefrigerant Piping Pipe Forming/End PositioningTightening of Connecting Part RequirementVacuum pump EvacuatingAir Purge How to open the valve How to close the valveSingle phase 50 Hz How to wireStripping length power cord and connecting cable Electrical WorkSelf-Diagnosis by LED Indication Final Installation ChecksCheck and Test Operation New tools for R410A Applicable to R22 model Changes Changes in the product and componentsNew tools for R410A Accessories Sold Separately Precautions for SafetyRAV-SM1100AT-E RAV-SM1400AT-E Outdoor unit Parts NameIndoor unit Parts Name of Remote Controller Display sectionOperation section Preparation Turn on the main power switch and/or the leakage breakerCorrect Usage StopWhen restarting the operation after stop Mode select button ModeTemperature button StartHow to stop swinging How to set up the wind directionHow to start swinging Heat operationCancel of timer operation Timer OperationTimer operation Get uniform circulation of room air Never open doors and windows more often than necessaryWindow curtains If you do not plan to use the unit for more than 1 month MaintenanceCleaning of remote controller Checks before operationAIR Conditioner Operations and Performance Troubles and Causes RE-INSTALLATIONDo not install the air conditioner in the following places Be careful with noise or vibrationsInoperative Part name ’ty Shape Separate sold partsPart name ’ty Shape Usage Part namePrecautions for Safety Inappropriate grounding may cause electric shock Avoid installing in the following places Selection of Installation PlaceInstallation space Model RAVHeight list of ceiling possible to be installed Selection of installation place Discharge directionAdvice Ceiling heightSM1100UT-E External viewModel RAV SM1400UT-EInstallation of hanging bolt Installation of ceiling opening and hanging boltInstallation of ceiling panel Sold separately Flexible hose Drain Piping WorkPiping/Heat insulating material Adhesive inhibitedDrain up Connection procedureCheck the draining Perform heat insulatingTightening connection Permissible Piping Length and HeatFlaring dia meter size a Unit mm Tightening torque of flare pipe connectionsGas leak check Use a vacuum pumpOpen the valve fully Thermal insulation processPacked valve handling precautions Valve at gas sideBe sure to connect earth wire. Grounding work Remote controller wiringCable connection Cabling on the ceiling panelWiring diagram Remote Controller CablingCabling diagram CablingProcedure How to execute a test runCase of wired remote controller Test RUNConfirmation and check TroubleshootingConfirmation of error history Maintenance Accessories ContentsTCB-AX21U W-E 85464189556000Name and Operation Precautions for SafetyRemote Controller HOW to SET the FAN Speed Signal Receiving PartDisplay Section Operation SectionHOW to Operate the Unit HOW to Operate the TimerHOW to Insert the Batteries HOW to Adjust AIR DirectionSlide Switch Address HOW to Handle the Remote ControllerHOW to USE the Remote Controller Correctly Start HOW to Perform Emergency OperationBefore Asking Repair Work Before asking a repair work, check the following itemsHow to check the program operation time FeaturesTurn on the power supply of the air conditioner RBC-EXW21EName and Operation of Each Part HOW to USE the Timer Correctly When ON/OFF time is set as follows, Error is displayed When push SET Button,Set error Next set up the operation time to the program 2To be checked Clearance of Holiday setupPush DAY button and put the operation Clear of a part of the programResuming of operation Matters to be memorized Power failureOperation of program weekly timer and air conditioner RBC-AS21E Selected mode displays Cooling only type Temperature Setup buttonSelected mode displays Heat pump type Start/Stop button Check button Used in servicingPush either or set to Auto Recommended temperature HOW to Operate AIR ConditionerPower supply Push button Push button to select fan speedInstallation Manual Check after installation Installation of adjust corner capInstallation of suction grille For wireless remote controllerRequirement for installation Multiple remote controllers Accessory partsHow to install remote controller Requirement to install Remote controller Remote controller test run setup Accessory parts Requirement for installation Multiple remote controllers Installation placeRequirement to install Program weekly timer Accessory parts Part Name ’tyHow to install the program weekly timer Program weekly timer test run setupHow to install the remote sensor Accessory partsRequirement to install the remote sensor Drain-up Kit For Concealed Duct Type Indoor Unit To Personnel Charged in Installation Work and Service Components For Installation ProfessionalsUse for Indoor Unit Only Combination List of Adapter PartsCase of 4-way Ceiling Cassette RAV-SM **0 UT-E Case of Concealed Duct RAV-SM **0 BT-EAddress No. setup table SW01 ProcedureContents Main To Customers