Lincoln Electric SVM123-A service manual Test Procedure for Normal Firing Board Operation

Models: SVM123-A

1 113
Download 113 pages 14.33 Kb
Page 61
Image 61

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-21

TROUBLESHOOTING & REPAIR

F-21

 

 

FIRING BOARD TEST

FIGURE F.6 - Firing Board LED and Molex Plug Locations

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

TEST PROCEDURE FOR NORMAL FIRING BOARD OPERATION

1.Disconnect main AC input power to the machine.

2.Remove screws, loosen and lower the front panel to access the Firing Board on the left side of Control Box facing the machine.

3.Visually inspect the Firing Board for loose or faulty connections.

4.Reconnect the input power and turn the DC-1000 on.

5.Locate LEDs 7, 8, and 9 on the Firing Board. See Figure F.6. Each LED should be ON and equally bright. Use Table F.1 to check LED operation.

6.Connect a jumper wire from termi- nal #2 to terminal #4 on the termi- nal strip. These can be accessed through the Front Panel Assembly door. See Figure F.7.

WARNING

JUMPERING LEADS 2 AND 4 ELEC- TRICALLY ENERGIZES MACHINE’S OUTPUT TERMINALS. DO NOT TOUCH ELECTRICALLY HOT COM- PONENTS.

______________________________________

7.Locate LEDs 1 thru 6. Each LED should glow with equal brightness.

NOTE: LEDs 1 through 6 indicate that the gate firing signals are being gener- ated to send to each of the output SCRs.

8.Set the output control switch (SW3) in the “Output Control at DC-1000” position.

9.Set the welding mode switch (SW4) in either of the “CV” posi- tions.

IDEALARC DC-1000

Page 61
Image 61
Lincoln Electric SVM123-A service manual Test Procedure for Normal Firing Board Operation