Return to Section TOC
Return to Section TOC
Return to Master TOC
Return to Master TOC
TROUBLESHOOTING & REPAIR | ||
|
|
ACTIVE SCR TEST
FIGURE F.16 - Heat Sink Assembly Test Points
Return to Section TOC
Return to Section TOC
Return to Master TOC
Return to Master TOC
3.Remove the red insulating paint from heat sink test points. See Figure F.16.
4.Perform test procedure as follows. Refer to Figure F.17. Repeat test for all six SCRs.
NOTE: Do not disassemble the heat sinks.