Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

F-36

TROUBLESHOOTING & REPAIR

F-36

 

 

ACTIVE SCR TEST

FIGURE F.16 - Heat Sink Assembly Test Points

Return to Section TOC

Return to Section TOC

Return to Master TOC

Return to Master TOC

3.Remove the red insulating paint from heat sink test points. See Figure F.16.

4.Perform test procedure as follows. Refer to Figure F.17. Repeat test for all six SCRs.

NOTE: Do not disassemble the heat sinks.

IDEALARC DC-1000

Page 76
Image 76
Lincoln Electric SVM123-A service manual Figure F.16 Heat Sink Assembly Test Points