Toshiba RAV-SP360CT-UL „Filter sign setting, „To secure better effect of heating, „Group control

Page 24
„Filter sign setting

Under Ceiling Type

Installation Manual

„Filter sign setting

According to the installation condition, the lighting time of the filter sign (Notification of filter cleaning) can be changed.

Follow to the basic operation procedure

(1 2 3 4 5 6).

For the CODE No. in Procedure 3, specify [01].

For the [SET DATA] in Procedure 4, select the setup data of filter sign lighting time from the following table.

Setup data

Filter sign lighting time

 

 

0000

None

 

 

0001

150H

 

 

0002

2500H (Factory default)

 

 

0003

5000H

 

 

0004

10000H

 

 

„To secure better effect of heating

When it is difficult to obtain satisfactory heating due to installation place of the indoor unit or structure of the room, the detection temperature of heating can be raised. Also use a circulator, etc. to circulate heat air near the ceiling.

Follow to the basic operation procedure

(1 2 3 4 5 6).

For the CODE No. in Procedure 3, specify [06].

For the SET DATA in Procedure 4, select the setup data of shift value of detection temperature to be set up from the table below.

Setup data

Detection temp shift value

 

 

0000

No shift

 

 

0001

+1.8 °F (+1 °C)

 

 

0002

+3.6 °F (+2 °C)

(Factory default)

 

0003

+5.4 °F (+3 °C)

 

 

0004

+7.2 °F (+4 °C)

 

 

0005

+9.0 °F (+5 °C)

 

 

0006

+10.8 °F (+6 °C)

 

 

„Group control

Group control for system of multiple units

One remote control can control maximum 8 indoor units as a group.

Group control in single system

Outdoor

Outdoor

 

Outdoor

 

Outdoor

 

Outdoor

unit

unit

 

unit

 

unit

 

unit

 

 

 

 

 

 

 

 

 

 

 

 

Indoor

Indoor

 

Indoor

 

Indoor

 

Indoor

unit

unit

 

unit

 

unit

 

unit

(Max. 8 units)

Remote

control Finish of address setup by power-ON

For wiring procedure and wiring method of the individual line (Identical refrigerant line) system, follow to “Electric work”.

Wiring between lines is performed in the following procedure.

Connect the terminal block (A/B) of the indoor unit connected with a remote control to the terminal blocks (A/B) of the indoor units of other indoor units by wiring the inter-unit wire of the remote control.

When the power supply has been turned on, the automatic address setup starts and “„To secure better effect of heating” display which indicates that address is being set up flashes on the display part. During setup of automatic address, the remote control operation is not accepted.

Required time up to the finish of automatic addressing is approx. 5 minutes.

NOTE

In some cases, it is necessary to change the address manually after setup of the automatic address according to the system configuration of the group control.

Procedure example 1

Manual address setup procedure

While the operation stops, change the setup. (Be sure to stop the operation of the unit.)

23-EN

– 23 –

Image 24
Contents AIR CONDITIONER SPLIT TYPE RAV-SP180CT-UL RAV-SP240CT-UL RAV-SP300CT-ULRAV-SP360CT-UL RAV-SP420CT-UL EnglishContents ADOPTION OF NEW REFRIGERANT1 ACCESSORY PARTS „Accessory partsUnder Ceiling Type 2 PRECAUTIONS FOR SAFETY Under Ceiling TypeUnder Ceiling Type 3 SELECTION OF INSTALLATION PLACE „Installation space„Height of ceiling Avoid installing in the following places„Wireless remote control „Before installation2 Removing wire guard Under Ceiling TypeInstallation Manual„External view 3 Removal of side panel4 Removal of protective vinyl 5 Removal of protectorInstallation Manual Unit in mm Under Ceiling Type„Installation of hanging bolts „Draw-outdirection of pipe/ wire„Pipe knockout hole Using attached installation pattern„Installation of indoor unit „Installation of remote control Sold separatelyInstallation Manual There is ceiling material4 REFRIGERANT PIPING AND EVACUATING „Refrigerant Piping„Pipe size „Permissible Piping Length and Height Difference„Evacuation Tightening connectionRefrigerant amount to be added Piping with outdoor unitThermal insulation process Under Ceiling TypeREQUIREMENT 5 DRAIN PIPING WORK „Piping/Heat insulating material„Drain up Under Ceiling Type„Connection of drain hose „Thermal insulating process„Connection of drain pipe Under Ceiling Type6 ELECTRICAL CONNECTION Remote control wiringWiring Under Ceiling TypeUnder Ceiling Type „Wire connection Under Ceiling TypeREQUIREMENT Connected at backside Connected at upsideUnder Ceiling Type 19-EN„System interconnection Wires and Ground Wire „Remote Control Wiring„Wiring Diagram Single system„Changing applicable control setting 7 APPLICABLE CONTROLSProcedure Procedure„Installation to high ceiling „Using wireless remote control1 → 2 → 3 → 4 → 5 → Procedure„Filter sign setting „To secure better effect of heating„Group control Procedure exampleProcedure ProcedureProcedure ProcedureProcedure ProcedureProcedure Procedure„Remote control switch monitoring function Installation ManualUnder Ceiling Type 8 TEST RUN 2, 4 1,5„Before test run „Execute a test runWireless remote control ProcedureProcedure Procedure9 TROUBLESHOOTING „Confirmation of error history„Confirmation and check Procedure„Check codes and parts to be checked Under Ceiling Type30-EN Under Ceiling Type 31-ENUnder Ceiling Type 32-ENEH99864801