Toshiba RAV-SP180CT-UL Refrigerant Piping And Evacuating, „Refrigerant Piping, „Pipe size

Page 12
4 REFRIGERANT PIPING AND EVACUATING

Under Ceiling Type

Installation Manual

4 REFRIGERANT PIPING AND EVACUATING

„Refrigerant Piping

The connecting sections of the refrigerant pipes are provided at the positions in the figure below.

Upper side

Rear side

* When using the drain

pump kit sold separately,

 

 

the pipe can be drawn out

 

 

only from the upper side.

Right

 

 

1.Use copper pipe with 0.03” (0.8 mm) or more thickness.

(In case pipe size is Ø5/8” (15.9 mm), with 0.04” (1.0 mm) or more.)

2.Flare nut and flare works are also different from those of the conventional refrigerant.

Take out the flare nut attached to the main unit of the air conditioner, and use it.

REQUIREMENT

When the refrigerant pipe is long, provide support brackets at intervals of 8’2” - 9’10” (2.5 - 3 m) to clamp the refrigerant pipe. Otherwise, abnormal sound may be generated.

„Refrigerant Piping CAUTION

IMPORTANT 4 POINTS FOR PIPING WORK

1.Remove dust and moisture from the inside of the connecting pipes.

2.Tight connection (between pipes and unit)

3.Evacuate the air in the connecting pipes using

VACUUM PUMP.

4.Check the gas leakage. (Connected points)

„Pipe size

Model

 

SP180

SP240, SP300,

RAV-

SP360, SP420

name

type

 

type

 

 

 

 

 

 

 

 

Gas side

1/2"

5/8"

 

(12.7 mm)

(15.9 mm)

Pipe size

 

 

 

 

Liquid side

1/4"

3/8"

 

 

(6.4 mm)

(9.5 mm)

 

 

 

 

 

 

„Permissible Piping Length and Height Difference

They vary according to the outdoor unit.

For details, refer to the Installation Manual attached to the outdoor unit.

Flaring

Cut the pipe with a pipe cutter. Remove burrs completely.

Remaining burrs may cause gas leakage.

Insert a flare nut into the pipe, and flare the pipe. As the flaring sizes of R410A differ from those of refrigerant R22, the flare tools newly manufactured for R410A are recommended.

However, the conventional

B

tools can be used by adjusting

 

projection margin of the

 

copper pipe.

 

Projection margin in

flaring: B (Unit: in (mm))

Rigid (Clutch type)

Outer dia. of

R410A tool used

Conventional

copper pipe

tool used

 

 

 

 

 

 

 

 

1/4” - 5/8”

0 - 0.02”

 

0.04” - 0.06”

(6.4 - 15.9)

(0 - 0.5)

 

(1.0 - 1.5)

 

 

 

 

 

Outer dia. of copper pipe

 

 

Imperial

 

(Wing nut type)

 

 

 

1/4” (6.4) or 3/8” (9.5)

0.06” - 0.08” (1.5 - 2.0)

 

 

 

1/2” (12.7) or 5/8” (15.9)

 

0.08” - 0.1” (2.0 - 2.5)

 

 

 

 

 

Flaring dia. meter size: A (Unit: in (mm))

Outer dia. of copper pipe

A-+00,02" (–0.4)

1/4” (6.4)

0.36” (9.1)

 

 

3/8” (9.5)

0.52” (13.2)

 

 

1/2” (12.7)

0.65” (16.6)

 

 

5/8” (15.9)

0.78” (19.7)

 

 

* In case of flaring for R410A with the

 

 

A

 

conventional flare tool, pull it out approx.

 

 

 

 

 

 

 

 

 

 

0.02” (0.5 mm) more than that for R22 to

 

 

 

 

 

 

 

 

 

 

adjust to the specified flare size.

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

The copper pipe gauge is useful for

 

 

 

 

 

adjusting projection margin size.

 

 

 

 

 

11-EN

– 11 –

Image 12
Contents AIR CONDITIONER SPLIT TYPE RAV-SP180CT-UL RAV-SP240CT-UL RAV-SP300CT-ULRAV-SP360CT-UL RAV-SP420CT-UL EnglishContents ADOPTION OF NEW REFRIGERANT1 ACCESSORY PARTS „Accessory partsUnder Ceiling Type 2 PRECAUTIONS FOR SAFETY Under Ceiling TypeUnder Ceiling Type 3 SELECTION OF INSTALLATION PLACE „Installation space„Height of ceiling Avoid installing in the following places„Wireless remote control „Before installation2 Removing wire guard Under Ceiling TypeInstallation Manual„External view 3 Removal of side panel4 Removal of protective vinyl 5 Removal of protectorInstallation Manual Unit in mm Under Ceiling Type„Installation of hanging bolts „Draw-outdirection of pipe/ wire„Pipe knockout hole Using attached installation pattern„Installation of indoor unit „Installation of remote control Sold separatelyInstallation Manual There is ceiling material4 REFRIGERANT PIPING AND EVACUATING „Refrigerant Piping„Pipe size „Permissible Piping Length and Height Difference„Evacuation Tightening connectionRefrigerant amount to be added Piping with outdoor unitThermal insulation process Under Ceiling TypeREQUIREMENT 5 DRAIN PIPING WORK „Piping/Heat insulating material„Drain up Under Ceiling Type„Connection of drain hose „Thermal insulating process„Connection of drain pipe Under Ceiling Type6 ELECTRICAL CONNECTION Remote control wiringWiring Under Ceiling TypeUnder Ceiling Type „Wire connection Under Ceiling TypeREQUIREMENT Connected at backside Connected at upsideUnder Ceiling Type 19-EN„System interconnection Wires and Ground Wire „Remote Control Wiring„Wiring Diagram Single system„Changing applicable control setting 7 APPLICABLE CONTROLSProcedure Procedure„Installation to high ceiling „Using wireless remote control1 → 2 → 3 → 4 → 5 → Procedure„Filter sign setting „To secure better effect of heating„Group control Procedure exampleProcedure ProcedureProcedure ProcedureProcedure ProcedureProcedure Procedure„Remote control switch monitoring function Installation ManualUnder Ceiling Type 8 TEST RUN 2, 4 1,5„Before test run „Execute a test runWireless remote control ProcedureProcedure Procedure9 TROUBLESHOOTING „Confirmation of error history„Confirmation and check Procedure„Check codes and parts to be checked Under Ceiling Type30-EN Under Ceiling Type 31-ENUnder Ceiling Type 32-ENEH99864801