water sensors, and liquid line components (solenoid valves, filter driers, sight glasses, and TXVs), as discrete elements of a complete factory system. Contractor shall be field erect system and provide interconnecting refrigerant piping and wiring in accordance with Manufacturer recommendations, and project plans and schedules. Where not oth- erwise specified, Contractor provided system piping shall be in accordance with applicable sections of ASHRAE Handbook.
O.Hot Gas
P.Microprocessor Membrane Keypad Graphics on in lieu of Standard English:
1.French language.
2.German language.
3.Spanish language.
4.Italian language.
Q.Thermal Storage: Leaving chilled liquid setpoint range for charge cycle from 25°F to 20°F minimum, with automatic reset of the leaving brine temperature up to 40°F above the setpoint. (Works with Option T)
R.Low Temperature Process Brine: Leaving chilled liquid setpoint range 20°F to 30°F.
S.Chicago Code Relief Valves to meet Chicago Code requirements.
T.Building Automation System (EMS) Reset Interface: Chiller to accept 4 to 20mA, 0 to 10 VDC, or discrete contact closure input to reset the leaving chilled liquid temperature.
U.Remote Control Panel
V.OptiView Remote Control Panel
W.
on mixed liquid temperature.
X.Sound Reduction
1.Ultra quiet, low speed, reduced noise fans
2.Compressor Acoustic Sound Blankets
Y.Vibration Isolation
1.Neoprene Pad Isolators.
2.1 Inch Deflection Spring Isolators: Level ad- justable, spring and cage type isolators for mounting under the unit base rails.
3.2 Inch Deflection Seismic Isolators: Level ad- justable, restrained mounts in rugged welded steel housing with vertical and horizontal limit stops. Housings shall be designed to withstand a minimum 1.0g accelerated force in all direc- tions to 2 inches.
PART 3 - EXECUTION
3.01INSTALLATION
A.General: Rig and Install in full accordance with Manufacturers requirements, Project drawings, and Contract documents.
B.Location: Locate chiller as indicated on drawings, including cleaning and service maintenance clear- ance per Manufacturer instructions. Adjust and level chiller on support structure. If equipment provided exceeds height of scheduled chiller, installing con- tractor is responsible for additional costs associated with extending the height of parapet or screening walls/enclosures
C.Components: Installing Contractor shall provide and install all auxiliary devices and accessories for fully operational chiller.
D.Electrical: Coordinate electrical requirements and connections for all power feeds with Electrical Con- tractor (Division 16).
E.Controls: Coordinate all control requirements and connections with Controls Contractor.
F.Finish: Installing Contractor shall paint damaged and abraded factory finish with