Roberts Gorden CTHN-200, CTHN-100, CTHN-40, CTHN-125, CTHN-80 Unitary U-tube Layout Overviews

Page 24

CTHN-SERIES INSTALLATION, OPERATION AND SERVICE MANUAL

FIGURE 17: Unitary U-tube Layout Overviews

 

bc

 

 

 

 

LEGEND

 

g

 

e

 

 

 

 

 

 

 

 

 

 

 

 

 

Burner

20' (6 m)*

h

 

 

 

 

Reflector

Tube Length

 

 

 

 

 

b

 

 

 

 

Tube

 

c

 

 

 

 

 

 

 

 

 

 

 

g

d

f

 

 

Tube/Reflector

 

 

 

 

 

 

Hanger

 

 

 

 

 

 

Coupling Assembly

30' (9 m)

h

 

 

 

 

U-tube

Tube Length

 

 

 

 

 

 

bc

 

 

 

 

Fan Assembly

 

g

d

e

 

 

(not shown)

 

 

 

 

 

a =

14" (36 cm)

 

 

 

 

 

reflector width (not shown)

40' (12 m)

h

 

 

 

b =

2" (5 cm)

 

 

 

end cap to burner

Tube Length

 

 

 

 

 

 

 

bc

 

 

 

c =

2" (5 cm)

 

 

 

 

end cap to hanger

 

g

d

e

f

d =

7'6" (229 cm)

 

 

 

 

 

 

 

 

 

 

distance first hanger

 

 

 

 

 

e =

10' (305 cm)

50' (15 m)*

h

 

 

 

distance between hangers

 

 

 

 

 

Tube Length

 

 

 

 

f = 5' (153 cm)

 

b

 

 

 

distance between last full tube

 

 

 

 

hanger and half tube hanger

 

c

 

 

 

 

 

 

g

d

e

e

g = 17.5" (44 cm) burner length

 

 

 

 

 

h =

9.5" (24 cm) burner height

 

 

 

 

 

*20' (6 m) & 50' (15 m) tube length

60' (18 m)

h

 

 

 

heaters require the last reflector

 

 

 

before the u-tube to be cut in

Tube Length

 

 

 

 

half for use on both sides.

 

bc

 

 

 

 

 

 

 

 

 

 

g

d

e

e

f

 

70' (21 m)

h

 

 

 

 

 

Tube Length

 

 

 

 

 

 

 

bc

 

 

 

 

 

 

g

d

e

e

e

 

80' (24 m)

h

 

 

 

 

 

Tube Length

 

 

 

 

 

 

 

 

 

 

 

18

Image 24
Contents If you smell gas Roberts-Gordon, LLCPage Roberts-Gordon, LLC Page Table of Figures Page Heater Safety Manpower RequirementsInstaller Responsibility Wall TagCorrosive Chemicals National Standards and Applicable CodesCombustibles at all times for safety Inches CentimetersONE Side Reflector InchesModel C D UnapprovedInches Centimeters Model UnventedNational Standards and Applicable Codes Heater Descriptions 5.1 Unitary vs. Multiburner Major Components General Suspension Details DescriptionContents of Core and Extension Packages Tubing and Related Accessories Venting AccessoriesReflectors and Related Accessories Common CTHN-Series ComponentsUnitary Heater Requirements Unitary Heater Design RequirementsLinear Heater Assembly Overview Unitary Linear Heater LayoutsUnitary Linear Layout Overviews 60 18 m Tube Length 70 21 m Tube Length 80 24 m Tube Length Tube Assembly Overview Unitary U-tube Heater LayoutsUnitary U-tube Layout Overviews Burner Tube Installation Tube Clamp Package InstallationDescription Part Number Tube Clamp PackageCoupling and Tube Assembly Correct Slide Bar2 Coupling and Tube Assembly Turbulator InstallationTurbulator Installation ModelReflector Installation Hanger Burner Tube ReflectorUnitary Linear & U-TUBE Heater Installation Reflector Support Package10 Burner Installation 11 Fan Inlet Plate and Warning TagWith the flame observation 12 Restrictor Plate Installation 13 Fan InstallationModel Fan Assy. P/N Contents of Core and Extension Packages Tubing Related Accessories Component Package GuideMinimum Standard Aluminized 05220000 0522100002719105 02716305Typical Cthn Multiburner System Installation Multiburner System Design RequirementsMultiburner Design Requirements Burners Per PumpNumber of Burners Allowed Per Pump Burner ModelRadiant Tube Length Manifold TubeManifold Diameter Multiburner System Layouts and Manifold Tube Length RulesFlag Layout Fork Layouts and Manifold Tube Length Rules LayoutFork Layout Herringbone Layout and Manifold Tube Length Rules Herringbone LayoutNut ± 2 5 cm 10 Turbulator Installation 11 Reflector Installation Clip 12 Burner Installation Optional Heater Accessories Elbow Package Configuration .1.1 Elbow Installation2 Elbow Installation 3 Reflector Joint Installation