Step 9.7 Burner Tube Installation
NOTE:
Tubing requires a downward slope of 1/2" (1.3 cm)
per 20' (6 m) away from burner.
Hanger
Burner Tube
7' 6" ± 1'
(229 cm ± 25 cm)
Offset mounting hole must be to the top.
Weld seam must be to the bottom of the tube.
Description | Part Number |
Burner Tube | 03051XXX |
|
|
91907302 | |
|
|
Tube/Reflector Hanger | 03090100 |
|
|
Step 9.8 Tube Clamp Package Installation
Description | Part Number |
|
| |
Tube Clamp Package | 01318901 |
|
| |
Tube Clamp | 01396801 |
| Bolt | |
Bolt | 97113940 | Tube Clamp | ||
| ||||
Flat Washer | 95211600 |
|
| |
Nut | 92113900 | Flat |
| |
|
| Washer |
| |
|
| Nut |
| |
|
| (Torque 120 in/lb |
| |
|
| 13.56 Nm) |
| |
36 |
|
|
|