Roberts Gorden CTHN-125, CTHN-200, CTHN-100, CTHN-40, CTHN-80, CTHN-175, CTHN-150, CTHN-60 ± 2 5 cm

Page 43

SECTION 9: MULTIBURNER HEATER INSTALLATION

Step 9.9 Coupling and Tube Assembly

Close coupling

Start slide bar/coupling lock

A with tab.

B onto coupling.

 

Tab

 

 

 

Slide Bar/Coupling Lock

 

 

Wide End

 

 

Coupling

Open

3" (8 cm) to

 

 

 

 

4" (10 cm)

 

Closed

 

 

C Insert tubes into coupling.

D Tighten coupling to join tubes.

 

 

Slide Bar/Coupling Lock

 

Orient coupling so that

Coupling

 

the impact block is in the

 

 

2:00 or 10:00 o’clock

 

 

positions.

Tube

 

Tube

 

 

Tube

Description

Part Number

Coupling

01329600

 

 

Slide Bar/Coupling Lock

01329700

 

Tube

91409XXX

Step 9.9.1 Coupling and Tube Assembly (Continued)

Tighten slide bar as shown below.

 

Drive slide bar until tight.

 

End of slide bar should be

 

within tolerance listed below.

 

± 2" (5 cm)

Correct Slide Bar

Incorrect Slide Bar

Dimensions

 

Position

Repeat Step 9.9 on Page 37, A - D until all tubes are assembled. See Page 38, Step 9.9.2.

NOTE: If coupling is not tight, loss of vacuum can occur.

37

Image 43
Contents Roberts-Gordon, LLC If you smell gasPage Roberts-Gordon, LLC Page Table of Figures Page Manpower Requirements Heater SafetyNational Standards and Applicable Codes Installer ResponsibilityWall Tag Corrosive ChemicalsInches Centimeters Combustibles at all times for safetyInches ONE Side ReflectorC D Unapproved ModelUnvented Inches Centimeters ModelNational Standards and Applicable Codes Heater Descriptions 5.1 Unitary vs. Multiburner Major Components Description General Suspension DetailsContents of Core and Extension Packages Common CTHN-Series Components Tubing and Related AccessoriesVenting Accessories Reflectors and Related AccessoriesUnitary Heater Design Requirements Unitary Heater RequirementsUnitary Linear Heater Layouts Linear Heater Assembly OverviewUnitary Linear Layout Overviews 60 18 m Tube Length 70 21 m Tube Length 80 24 m Tube Length Unitary U-tube Heater Layouts Tube Assembly OverviewUnitary U-tube Layout Overviews Tube Clamp Package Burner Tube InstallationTube Clamp Package Installation Description Part NumberCorrect Slide Bar Coupling and Tube AssemblyModel 2 Coupling and Tube AssemblyTurbulator Installation Turbulator InstallationHanger Burner Tube Reflector Reflector InstallationReflector Support Package Unitary Linear & U-TUBE Heater Installation11 Fan Inlet Plate and Warning Tag 10 Burner InstallationWith the flame observation 13 Fan Installation 12 Restrictor Plate InstallationModel Fan Assy. P/N Contents of Core and Extension Packages Component Package Guide Tubing Related AccessoriesMinimum Standard Aluminized 02716305 0522000005221000 02719105Multiburner System Design Requirements Typical Cthn Multiburner System InstallationBurner Model Multiburner Design RequirementsBurners Per Pump Number of Burners Allowed Per PumpMultiburner System Layouts and Manifold Tube Length Rules Radiant Tube LengthManifold Tube Manifold DiameterFlag Layout Layout Fork Layouts and Manifold Tube Length RulesFork Layout Herringbone Layout Herringbone Layout and Manifold Tube Length RulesNut ± 2 5 cm 10 Turbulator Installation 11 Reflector Installation Clip 12 Burner Installation 3 Reflector Joint Installation Optional Heater AccessoriesElbow Package Configuration .1.1 Elbow Installation 2 Elbow Installation