Step 9.11.1 Reflector, U-clip and Reflector Support Installation

The pictorial drawings of the heater construction in Section 9 are schematic only and provide a general guideline of where hangers, reflector supports and u-clips are to be installed.

To ensure proper expansion and contraction movement of the reflectors, a combination of u-clips and reflector supports are used. The positioning of

reflector supports and u-clips depend on the individual installation. Use either pop rivets or sheet metal screws instead of u-clips when installing end caps and joint pieces in areas where impact and high wind may be a factor. The following rules must be observed.

1.The first reflector after the burner must be affixed in the middle of the reflector with a reflector support and tight screws.

End

First Reflector

U-clips

Overlap must be a

6"

minimum of 6" (16 cm).

(16 cm)

2.The overlap at the first and second reflector is a slip overlap. Thereafter, every third reflector joint is a slip overlap. A slip overlap is achieved by either:

a.) both reflectors lay inside a hanger. (No reflector support needed.)

b.) using a reflector support with loose screws at the reflector overlap.

 

Tight

 

Sheet Metal

Wire Form

Screw

 

Reflector Support

Strap

2 B

Slip Overlap Reflector

Reflector

Support

Loose screws loosened 1/16" (.16 cm) to allow slippage.

2 A

Slip Overlap

3.The remaining reflector overlaps require a non-slip overlap connection. To affix the reflectors together in a non-slip overlap either:

a.) use reflector support and tight screws.

b.) if both reflectors lay inside a hanger, u-clips or sheet metal screws may be used.

This section of three reflectors joined together must be affixed to the tube with at least one reflector support with tight screws.

3 A

Non-Slip Overlap

3 B

Non-Slip Overlap

Reflector

Tight

Screws

Description

Part Number

Reflector Support Package

03050010

Wire Form

91908004

Reflector Support Strap

03050000

Screw #8 x 3/4

94320812

U-clip Package

91107720

Reflector End Cap

027508XX

U-clip

(2 Clips per

Non-slip Overlap

Inside a Hanger)

40

Image 46
Contents If you smell gas Roberts-Gordon, LLCPage Roberts-Gordon, LLC Page Table of Figures Page Heater Safety Manpower RequirementsCorrosive Chemicals Installer ResponsibilityWall Tag National Standards and Applicable CodesCombustibles at all times for safety Inches CentimetersONE Side Reflector InchesModel C D UnapprovedInches Centimeters Model UnventedNational Standards and Applicable Codes Heater Descriptions 5.1 Unitary vs. Multiburner Major Components General Suspension Details DescriptionContents of Core and Extension Packages Reflectors and Related Accessories Tubing and Related AccessoriesVenting Accessories Common CTHN-Series ComponentsUnitary Heater Requirements Unitary Heater Design RequirementsLinear Heater Assembly Overview Unitary Linear Heater LayoutsUnitary Linear Layout Overviews 60 18 m Tube Length 70 21 m Tube Length 80 24 m Tube Length Tube Assembly Overview Unitary U-tube Heater LayoutsUnitary U-tube Layout Overviews Description Part Number Burner Tube InstallationTube Clamp Package Installation Tube Clamp PackageCoupling and Tube Assembly Correct Slide BarTurbulator Installation 2 Coupling and Tube AssemblyTurbulator Installation ModelReflector Installation Hanger Burner Tube ReflectorUnitary Linear & U-TUBE Heater Installation Reflector Support Package11 Fan Inlet Plate and Warning Tag 10 Burner InstallationWith the flame observation 13 Fan Installation 12 Restrictor Plate InstallationModel Fan Assy. P/N Contents of Core and Extension Packages Component Package Guide Tubing Related AccessoriesMinimum Standard Aluminized 02719105 0522000005221000 02716305Typical Cthn Multiburner System Installation Multiburner System Design RequirementsNumber of Burners Allowed Per Pump Multiburner Design RequirementsBurners Per Pump Burner ModelManifold Diameter Radiant Tube LengthManifold Tube Multiburner System Layouts and Manifold Tube Length RulesFlag Layout Fork Layouts and Manifold Tube Length Rules LayoutFork Layout Herringbone Layout and Manifold Tube Length Rules Herringbone LayoutNut ± 2 5 cm 10 Turbulator Installation 11 Reflector Installation Clip 12 Burner Installation 2 Elbow Installation Optional Heater AccessoriesElbow Package Configuration .1.1 Elbow Installation 3 Reflector Joint Installation