Raypak 240692 manual Field Wiring, Single-Stage On/Off Boilers

Page 13

FIELD WIRING

Single-Stage (On/Off) Boilers

-All stage connections on the control board are connected at the {TH} (Thermostat) location on the boiler wiring diagram.

Multiple-Stage Boilers

-First stage connections on the control board are connected at the {TH} (Thermostat) location on the boiler wiring diagram.

-Second (or third, etc.) stage connections on the control board are connected at the locations shown on the boiler wiring diagram.

Utilize Shielded Cable

Outdoor Air Temperature

Sensor (see NOTE 4)

Water Temperature

Sensor

P5

Stage 1

Stage 2

Stage 3

Stage 4

Stage 5

 

Stage 6

 

Stage 7

 

Stage 8

 

 

P6

Pump Relay

 

Pilot Duty Only

 

2.5 Amp Max

P4

250V Max

 

Thermostat

 

(Jumpered) or

 

Building Management System

P1

Outdoor Temp

 

Water Temp

 

 

P2

1

2

3

4

5

6

7

8

1

2

3

4

5

6

7

8

1

2

1

2

3

1

2

3

4

Notes:

1.Tighten terminal strip clamping screws to 4 in-lbs. Breakage from over torquing is not covered under warranty.

2.Use copper conductors only.

3.For supply connections, use wires sized on the basis of 60°C (140°F) ampacity and rated a min. 90°C (194°F).

4.The outdoor sensor must be connected, otherwise a sensor error will be displayed.

13

Image 13
Contents Electronic Boiler Sequencer & Outdoor Reset Controller Series Electronic Boiler Control Installation and Operating InstructionsTable of Contents Basics Important Safety InstructionsIntroduction Optional ConfigurationsConcept of Operation Standard Indicator Lights Control FeaturesMechanical Installation Installation and MountingElectrical Installation Install Conduit AS AppropriateCheckyourpowersource Wiring Power Source to ControllerOutdoor AIR Temperature Sensor AIR Temperature SensorHydronic Installations Water Temperature Sensor InstallationTypical Water Sensor Domestic HOT Water Application Setup Procedure Domestic HOT Water InstallationsPool Heating Installations Single-Stage On/Off Boilers Field WiringPower Test Installation Verification ProcedureControl Familiarization Manual Override Sequence of OperationSeries Electronic Boiler Control Module Indicator Lights Control Functions Reset RatioPump TURN-OFF Delay Reset Ratio ChartOutdoor Cutoff Temperature Stage TURN-ON DelayControl Band Outdoor Cutoff DeadbandSET Point Maximum Water TemperatureCircuit Board Auto Interior Jumper & SwitchesDHW SlaveManual LEAD-LAG Output OverrideNight Setback Option Optional ControlsDigital Display Option Call OUT Description Replacement Parts ListSystem Setting Entered on Date System START-UP SettingsInterior Jumper & Switch Settings OFF Troubleshooting GuideLimited Warranty Litho in U.S.A