Raypak 240692 manual Installation Verification Procedure, Power Test

Page 14

INSTALLATION VERIFICATION PROCEDURE

REGISTER

Before proceeding any further, please verify that the user registration form has been completed and mailed.

MECHANICAL INSTALLATION

Verify that the mechanical installation has been completed in accordance with the instructions.

OUTDOOR AIR TEMPERATURE SENSOR

Verify that all Outdoor Air Temperature Sensor installation parameters have been met.

WATER TEMPERATURE SENSOR

Verify that the Water Temperature Sensor installation parameters have been met.

SYSTEM MODULE INSTALLATION

Verify electrical power wiring connections.

Verify electrical connection torque requirements.

Verify Outdoor Air Temperature Sensor wiring.

Verify Water Temperature Sensor wiring.

Verify Power Test has been completed successfully.

POWER TEST

Utilizing a Volt-Ohm-Meter (VOM) monitor the following on the controller for proper voltage levels. Check at Terminal Block TB-1.

 

POWER TEST TABLE

 

From:

To:

Indication

TB pin 1

TB pin 2

108 VAC to 132 VAC

TB pin 1

Single Point Ground

108 VAC to 132 VAC

TB pin 2

Single Point Ground

less than 1 VAC

14

Image 14
Contents Electronic Boiler Sequencer & Outdoor Reset Controller Installation and Operating Instructions Series Electronic Boiler ControlTable of Contents Important Safety Instructions BasicsConcept of Operation Optional ConfigurationsIntroduction Control Features Standard Indicator LightsElectrical Installation Installation and MountingMechanical Installation Install Conduit AS AppropriateWiring Power Source to Controller CheckyourpowersourceAIR Temperature Sensor Outdoor AIR Temperature SensorTypical Water Sensor Water Temperature Sensor InstallationHydronic Installations Domestic HOT Water Installations Domestic HOT Water Application Setup ProcedurePool Heating Installations Field Wiring Single-Stage On/Off BoilersInstallation Verification Procedure Power TestControl Familiarization Sequence of Operation Manual OverrideSeries Electronic Boiler Control Module Indicator Lights Reset Ratio Control FunctionsReset Ratio Chart Pump TURN-OFF DelayControl Band Stage TURN-ON DelayOutdoor Cutoff Temperature Outdoor Cutoff DeadbandMaximum Water Temperature SET PointCircuit Board Interior Jumper & Switches AutoManual LEAD-LAG SlaveDHW Output OverrideDigital Display Option Optional ControlsNight Setback Option Replacement Parts List Call OUT DescriptionInterior Jumper & Switch Settings System START-UP SettingsSystem Setting Entered on Date Troubleshooting Guide OFFLimited Warranty Litho in U.S.A