Raypak 399B-2339B Water Piping, General, Reversing Water Connections Relief Valve Piping

Page 14

of not less than 1 in.2 for each 30,000 BTUH mm2 per kW) of total rated input of the burner(s), and the location of the opening(s) shall not interfere with the intended purpose of the opening(s) for ventilation air referred to in (1). This opening(s) can be ducted to a point not more than 18 in. (450

mm) nor less than 6 in. (152 mm) above the floor level. The duct can also “goose neck” through the roof. The duct is preferred to be straight down 18 in. (450 mm) from the floor, but not near piping.

4.Refer to B149 Installation code for additional infor- mation.

Water Piping

General

The heater should be located so that any water leaks will not cause damage to the adjacent area or struc- tures.

CAUTION: This heater requires forced water circulation when the burner is operating. See Table G and Table H for minimum and maximum flow rates and water pump selection. The pump must be interlocked with the heater to prevent heater operation without water circulation.

NOTE: Minimum pipe size for in/out connections is 2 12 in (2 in. for 399B–899B). Verify proper flow rates and ΔT as instructed in this manual.

5.Remove all plumbing fittings to the header. This will include both inlet and outlet water pipe unions and the pressure relief valve and drain piping.

6.Remove limits, control bulbs and/or thermocou- ples.

7.Remove the six (or 8) flange nuts and the in/out header from the left-hand side.

8.Remove the six (or 8) flange nuts and the return header from the right-hand side.

9.Remove the header stud bolts from each tube sheet.

10.Reverse the headers and stud bolts to the new location.

11.Install NEW red beveled O-rings flush against both tube sheets with the bevel facing outward.

12.Push the header firmly against the O-rings. Install and tighten the flange nuts onto the stud bolts until finger tight.

13.Slowly tighten the flange nuts, starting from the center nut (number 1) in Fig. 9 and working se- quentially around the header as indicated. Torque all nuts to 25 ft/lb. DO NOT OVER-TIGHTEN.

14.Re-route the capillary(s), wiring etc. to the new location, adding thermal paste and shim to the capillary well.

Reversing Water Connections

Relief Valve Piping

Follow these instructions to change the water connec- tions from the left-hand side (standard) to the right-hand side.

1.Disconnect all electrical power from the heater (if applicable).

2.Label all electrical connections and conduit lines. This may include the flow switch, low water cut-off probe and/or pump.

3.Disconnect or isolate the main gas pipe from the heater (if applicable).

4.Remove both in/out and return header access panels by removing all sheet metal screws.

WARNING: Pressure relief valve discharge piping must be piped near the floor and close to a drain to eliminate the potential of severe burns. Do not pipe to any area where freezing could occur. Refer to local codes.

Hydrostatic Test

Unlike many types of heaters, this heater does not re- quire hydrostatic testing prior to being placed in operation. The heat exchanger has already been fac- tory-tested and is rated for 160 psi operating pressure. However, Raypak does recommend hydrostatic test- ing of the piping connections to the heater and the rest of the system prior to operation. This is particularly true for hydronic systems using expensive glycol- based anti-freeze. Raypak recommends conducting

14

Image 14
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Product Receipt Before InstallationInstallations at Elevation Model IdentificationComponent Locations Component Locations BackGeneral Information Burners per Valve Stages Fire at StageWater Time to Produce Serious Temp Burn General SafetyTime/Temperature Relationships in Scalds Equipment Base InstallationInstallation Codes StackingTable D Vent/Air Inlet Termination Clearances Clearances Indoor InstallationsOutdoor Installations Combustion and Ventilation Air Conventional Combustion Air SupplyCanadian Installations All Air from OutdoorsReversing Water Connections Relief Valve Piping Water PipingGeneral Hydrostatic TestCold Water Starts Cold Water OperationModels 399B-899B Models 989B-2339B Pump Selection Temperature & Pressure GaugeHydronic Heating Cold Water RunAir-Separation/Expansion Tank Pressure Drop in Feet of Head Feedwater RegulatorPiping Three-Way ValvesGas Supply Potable Water and Space HeatingTable I Maximum Equivalent Pipe Length Gas Supply ConnectionModel Reversing Gas Supply Connection Models 399B-2339B Adjustment Models 989B-2339BGas Supply Pressure Field-Connected Controllers Electrical Power ConnectionsCheck the Power Source Making the Electrical ConnectionsField Wiring Connection On-Off Wiring ConnectionsStage Wiring Connections Single Stage Tankstat Barometric Damper VentingSupport of Vent Stack Installations Vent Terminal LocationChanging the Flue Outlet Venting Installation TipsCanadian Installations Natural Draft Vertical Venting Category Venting ConfigurationsInstallation TerminationSize Material MinHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryMaterial Vent Length Freeze Protection Outdoor InstallationControls External Lights Color Indication Heater Sequence of OperationModels 399B-899B Page Models 989B-2339B Models 1529B-2339B Only Ignition Module High Limit Manual ResetFlow Switch Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalWiring Diagram Models 399B-1259B Wiring Diagram Models 1529B-2339B START-UP Pre Start-upStart-Up Blower AdjustmentMain Burner Adjustment Follow-Up Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Pilot Turn-Down TestPost Start-Up Check Leak TestTo Turn Off Gas To Appliance OperationLighting Instructions Troubleshooting StepPreventive Maintenance Schedule MaintenanceSuggested Minimum Maintenance Schedule Annually WeeklySemi-Annually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty Delta Limited Types H and WH START-UP Checklist for FAN-ASSISTED Raypak Products

399B-2339B specifications

The Raypak 399B-2339B is a notable pool heater that stands out in the competitive market of heating solutions, particularly aimed at residential and commercial swimming pools and spas. Designed for efficiency and reliability, the Raypak 399B-2339B integrates advanced technology to deliver a comfortable swimming experience, safeguarding users against fluctuating outdoor temperatures.

One of the primary features of the Raypak 399B-2339B is its robust design, built to withstand the rigors of outdoor environments. With a durable cabinet made from corrosion-resistant materials, it ensures longevity and resistance to various weather conditions. This heater boasts a compact footprint, making it an ideal choice for properties with limited installation space.

A standout characteristic of this model is its energy efficiency. The Raypak 399B-2339B utilizes a high-efficiency gas burner, allowing it to heat water quickly while consuming less fuel. This efficiency not only reduces operational costs but also aligns with environmentally conscious practices, making it an appealing choice for eco-friendly users.

Equipped with innovative technologies, this heater offers both digital controls and diagnostic capabilities. The user-friendly digital display allows for precise temperature control and easy monitoring of the heater's performance. Additionally, the built-in diagnostics feature alerts users to any operational issues, ensuring timely maintenance and minimizing downtime.

The Raypak 399B-2339B is compatible with both natural gas and propane, providing versatility in energy sources. This adaptability can be particularly beneficial for those seeking to switch fuel types or utilize available resources. Moreover, its low NOx emissions make it compliant with stringent environmental regulations, contributing to cleaner air and a healthier ecosystem.

In terms of heating capacity, the Raypak 399B-2339B boasts a powerful output, efficiently heating large bodies of water. This performance makes it suitable for various applications, from residential pools to commercial aquatic centers, ensuring that swimming enjoyment is never compromised due to cold water.

The unit also features a built-in water hydraulics system that optimizes water circulation, preventing overheating and prolonging the lifespan of the heater. Furthermore, the Raypak engineering team has ensured that the installation process is straightforward, with clear guidelines and necessary plumbing fittings provided.

In summary, the Raypak 399B-2339B is a top-tier pool heater that offers durability, energy efficiency, advanced technology, and versatile fuel compatibility. Its high performance and user-friendly features make it a reliable investment for anyone looking to enhance their swimming experience.