Raypak 399B-2339B operating instructions Models 1529B-2339B Only

Page 36

the 120 VAC pilot duty terminals, located at J-14 on the circuit board.

29.The 120 VAC signal continues to the coil of relay K-4 (N.O.).

30.The 120 VAC signal continues to the 120 VAC safety terminals located at J-13 on the circuit board.

31.When the coil on relay K-4 (N.O.) is powered, the relay contacts (K-4) close and energize the blow- ers from the J-8 connections on the CPW board.

32.After proper air pressure is received in the air plenum, the air pressure switches will close.

33.Power is applied to the optional equipment inter- lock connection (normally jumpered).

34.The 24 VAC signal is then sent to the 24 VAC safe- ty connector.

35.24 VAC is now sent to the pressure switch (P Switch) terminal on the ignition modules.

36.Once the pressure switch signals are received at both ignition modules, hot surface igniter 1 is ener- gized by a 120 VAC signal from S-1 on ignition module 1. (The hot surface igniter must draw greater than 3.2 amps while being energized or ignition lockout will occur after three tries.)

37.Once ignition module 1 determines that hot sur- face igniter 1 has heated up and operating properly, a 24 VAC signal is output from terminal “valve” on module 1.

38.24 VAC signal is sent to gas valve 1.

39.The blue LED on the front of the unit is now illumi- nated.

40.The coil of relay K-2 (N.O.) is now energized with the (K-2) contacts closing downstream of the stage 2 connections and upstream of the stage 3 connections.

41.The gas coming through the burners should ignite from the heat of hot surface igniter 1 and the flame should carry over from one burner to the other burners of stage 1. The remote sensor is now try- ing to sense the flame. If the flame is not sensed within 4 seconds, the ignition module will shut down the gas valve and retry the hot surface ignit- er. During ignition retry the heater must perform a

15-second pre-purge and an approximately 30- second igniter warm-up before opening gas valve 1 again. The standard ignition module will attempt ignition a maximum of three times prior to ignition lockout.

42.After gas valve 1 opens and flame rectification is received, time delay relay 1 (TD-1) is powered and starts a 5-second countdown.

43.After the 5 second countdown from TD-1, the con- tacts close time delay relay 2 receives 24 VAC.

44.After 5 seconds gas valve 1a is now energized allowing the remainder of stage 1 to fire.

45.After the 5-second countdown from TD-2 the inter- nal contacts close allowing 24 VAC to sit at pin 3 of the stage 2 connection on the CPW board.

46.The temperature controller closes the stage 2 con- tacts and gas valve 2 in energized.

47.The temperature controller closes the stage 3 con- tacts at J-3 on the CPW board.

48.24 VAC signal is received at gas valve 3 (Model 1259B only).

Models 1529B–2339B Only

49.Power is applied to the “TH” terminal of ignition module 2.

50.Once the “TH” signal is received at ignition module 2, hot surface igniter 2 is energized by a 120 VAC signal from S-1 on ignition module 2. (The hot sur- face igniter must draw greater than 3.2 amps while being energized or ignition lockout will occur after three tries.)

51.Once the ignition module determines that the hot surface igniter has heated up and operating prop- erly, a 24 VAC signal is output from pin “valve” on the module.

52.24 VAC signal is received at gas valve 3.

53.The coil of relay K-5 (N.O.) is now energized with the (K-5) contacts closing downstream of the stage 4 connections.

54.Remote flame sensor 2 is trying to rectify flame.

55.Power is now applied to time delay relay 3 and the contacts of TD-3 located upstream of the stage 4

36

Image 36
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Before Installation Installations at ElevationProduct Receipt Model IdentificationComponent Locations Component Locations BackGeneral Information Burners per Valve Stages Fire at StageGeneral Safety Time/Temperature Relationships in ScaldsWater Time to Produce Serious Temp Burn Installation Installation CodesEquipment Base StackingTable D Vent/Air Inlet Termination Clearances Indoor Installations Outdoor InstallationsClearances Combustion and Ventilation Air Conventional Combustion Air SupplyCanadian Installations All Air from OutdoorsWater Piping GeneralReversing Water Connections Relief Valve Piping Hydrostatic TestCold Water Operation Models 399B-899B Models 989B-2339BCold Water Starts Temperature & Pressure Gauge Hydronic HeatingPump Selection Cold Water RunPressure Drop in Feet of Head Feedwater Regulator PipingAir-Separation/Expansion Tank Three-Way ValvesGas Supply Potable Water and Space HeatingGas Supply Connection ModelTable I Maximum Equivalent Pipe Length Models 399B-2339B Adjustment Models 989B-2339B Gas Supply PressureReversing Gas Supply Connection Electrical Power Connections Check the Power SourceField-Connected Controllers Making the Electrical ConnectionsField Wiring Connection On-Off Wiring ConnectionsStage Wiring Connections Single Stage Tankstat Venting Support of Vent StackBarometric Damper Installations Vent Terminal LocationVenting Installation Tips Canadian InstallationsChanging the Flue Outlet Venting Configurations InstallationNatural Draft Vertical Venting Category TerminationSize Material MinHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryMaterial Vent Length Outdoor Installation ControlsFreeze Protection Heater Sequence of Operation Models 399B-899BExternal Lights Color Indication Page Models 989B-2339B Models 1529B-2339B Only High Limit Manual Reset Flow SwitchIgnition Module Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalWiring Diagram Models 399B-1259B Wiring Diagram Models 1529B-2339B START-UP Pre Start-upBlower Adjustment Main Burner AdjustmentStart-Up Safety Inspection Leak Test Procedure Dual-Seat Gas ValvesFollow-Up Pilot Turn-Down TestPost Start-Up Check Leak TestOperation Lighting InstructionsTo Turn Off Gas To Appliance Troubleshooting StepMaintenance Suggested Minimum Maintenance SchedulePreventive Maintenance Schedule Weekly Semi-AnnuallyAnnually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty Delta Limited Types H and WH START-UP Checklist for FAN-ASSISTED Raypak Products

399B-2339B specifications

The Raypak 399B-2339B is a notable pool heater that stands out in the competitive market of heating solutions, particularly aimed at residential and commercial swimming pools and spas. Designed for efficiency and reliability, the Raypak 399B-2339B integrates advanced technology to deliver a comfortable swimming experience, safeguarding users against fluctuating outdoor temperatures.

One of the primary features of the Raypak 399B-2339B is its robust design, built to withstand the rigors of outdoor environments. With a durable cabinet made from corrosion-resistant materials, it ensures longevity and resistance to various weather conditions. This heater boasts a compact footprint, making it an ideal choice for properties with limited installation space.

A standout characteristic of this model is its energy efficiency. The Raypak 399B-2339B utilizes a high-efficiency gas burner, allowing it to heat water quickly while consuming less fuel. This efficiency not only reduces operational costs but also aligns with environmentally conscious practices, making it an appealing choice for eco-friendly users.

Equipped with innovative technologies, this heater offers both digital controls and diagnostic capabilities. The user-friendly digital display allows for precise temperature control and easy monitoring of the heater's performance. Additionally, the built-in diagnostics feature alerts users to any operational issues, ensuring timely maintenance and minimizing downtime.

The Raypak 399B-2339B is compatible with both natural gas and propane, providing versatility in energy sources. This adaptability can be particularly beneficial for those seeking to switch fuel types or utilize available resources. Moreover, its low NOx emissions make it compliant with stringent environmental regulations, contributing to cleaner air and a healthier ecosystem.

In terms of heating capacity, the Raypak 399B-2339B boasts a powerful output, efficiently heating large bodies of water. This performance makes it suitable for various applications, from residential pools to commercial aquatic centers, ensuring that swimming enjoyment is never compromised due to cold water.

The unit also features a built-in water hydraulics system that optimizes water circulation, preventing overheating and prolonging the lifespan of the heater. Furthermore, the Raypak engineering team has ensured that the installation process is straightforward, with clear guidelines and necessary plumbing fittings provided.

In summary, the Raypak 399B-2339B is a top-tier pool heater that offers durability, energy efficiency, advanced technology, and versatile fuel compatibility. Its high performance and user-friendly features make it a reliable investment for anyone looking to enhance their swimming experience.