Safety Inspection

1.Check all thermostats and high limit settings.

2.During the following safety checks leave manome- ters hooked up, check and record.

3.If other gas-fired appliances in the room are on the same gas main, check all pressures on the Delta Limited with all other equipment running.

4.Check thermostats for ON-OFF operation.

5.Check high limits for ON-OFF operation.

6.While in operation, check flow switch operation.

7.Check the low gas pressure switch. (For proper adjustment, use the attached manometers, if available, to set pressure. The scales on the switch are approximate only.) Low gas pressure switch must be set at 5.0 in. WC for natural gas and 10.0 in. WC for propane gas.

8.Make sure that the high gas pressure switch (op- tional) is set to 1.0 in. WC above manifold pressure.

Follow-Up

Safety checks must be recorded as performed.

Turn heater on. After main burner ignition:

1.Check manometer for proper reading.

2.Cycle heater several times and re-check readings.

3.Remove all manometers and replace caps and screws.

4.Replace all gas pressure caps.

5.Check for gas leaks one more time.

Pilot Turn-Down Test

The Delta Limited heaters, depending on their size, have two to five burner sections. Each burner section is supplied gas by two gas valves incorporated into a single valve body. A maximum of three burner sections may be controlled by a single hot surface ignition sys- tem. The middle of the three burner sections is ignited directly with a hot surface ignition system.

The burner section that is ignited directly by the hot surface ignition system serves as a supervised pilot to light the burner sections on either side of it. The burn- er sections on either side of the supervised section (pilot) are electrically interlocked with the supervised ignition system so as they are not energized unless flame is proven on the center section which is acting as a pilot to light the right and left-hand sections.

The pilot turn-down test is conducted as follows:

1.Turn off manual valves on non-supervised burner sections.

2.Turn on electrical power and adjust thermostat to call for heat.

3.Wait for completion of ignition sequence to light burner section being utilized as a pilot for those turned off in step 1 above.

4.Gradually reduce manifold pressure (flame) on supervised burner section by slowly closing man- ual gas valve. Watch for shut-down due to loss of supervised flame signal as pressure is being re- duced. Flame signal should be lost before manifold pressure goes below 2.0 in. WC for nat- ural gas and 6.0 in. WC for propane gas.

Leak Test Procedure: Dual-Seat Gas Valves

Proper leak testing requires three pressure test points in the gas train.

Test point A is upstream of the automatic gas valve. On the first automatic valve, this is a bleedle valve. On the other valves, this is a plugged port. The bleedle valve on the first valve may be used for all the other valves as well.

Test point B is a bleedle valve located between the two automatic gas valve seats.

Test point C is located downstream of both automatic gas valve seats and upstream of the manual valve. On the manual valve, this is a bleedle valve. Identical readings will be found at the plugged port labeled as Alternate C.

Refer to Fig. 36. The numbers on the diagram refer to the steps below:

These tests are to be conducted with the electrical power to the heater turned off.

43

Image 43
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Model Identification Before InstallationInstallations at Elevation Product ReceiptComponent Locations Back Component LocationsBurners per Valve Stages Fire at Stage General InformationTime/Temperature Relationships in Scalds General SafetyWater Time to Produce Serious Temp Burn Stacking InstallationInstallation Codes Equipment BaseTable D Vent/Air Inlet Termination Clearances Outdoor Installations Indoor InstallationsClearances Conventional Combustion Air Supply Combustion and Ventilation AirAll Air from Outdoors Canadian InstallationsHydrostatic Test Water PipingGeneral Reversing Water Connections Relief Valve PipingModels 399B-899B Models 989B-2339B Cold Water OperationCold Water Starts Cold Water Run Temperature & Pressure GaugeHydronic Heating Pump SelectionThree-Way Valves Pressure Drop in Feet of Head Feedwater RegulatorPiping Air-Separation/Expansion TankPotable Water and Space Heating Gas SupplyModel Gas Supply ConnectionTable I Maximum Equivalent Pipe Length Gas Supply Pressure Models 399B-2339B Adjustment Models 989B-2339BReversing Gas Supply Connection Making the Electrical Connections Electrical Power ConnectionsCheck the Power Source Field-Connected ControllersOn-Off Wiring Connections Field Wiring ConnectionStage Wiring Connections Single Stage Tankstat Support of Vent Stack VentingBarometric Damper Vent Terminal Location InstallationsCanadian Installations Venting Installation TipsChanging the Flue Outlet Termination Venting ConfigurationsInstallation Natural Draft Vertical Venting CategoryMaterial Min SizeHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryMaterial Vent Length Controls Outdoor InstallationFreeze Protection Models 399B-899B Heater Sequence of OperationExternal Lights Color Indication Page Models 989B-2339B Models 1529B-2339B Only Operating Control High Limit Manual ResetFlow Switch Ignition ModuleLow Water Cut-Off Optional High and Low Gas Pressure SwitchesWiring Diagram Models 399B-1259B Wiring Diagram Models 1529B-2339B Pre Start-up START-UPMain Burner Adjustment Blower AdjustmentStart-Up Pilot Turn-Down Test Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Follow-UpLeak Test Post Start-Up CheckLighting Instructions OperationTo Turn Off Gas To Appliance Step TroubleshootingSuggested Minimum Maintenance Schedule MaintenancePreventive Maintenance Schedule As Required WeeklySemi-Annually AnnuallyInside Air Contamination AppendixLimited Parts Warranty Delta Limited Types H and WH START-UP Checklist for FAN-ASSISTED Raypak Products

399B-2339B specifications

The Raypak 399B-2339B is a notable pool heater that stands out in the competitive market of heating solutions, particularly aimed at residential and commercial swimming pools and spas. Designed for efficiency and reliability, the Raypak 399B-2339B integrates advanced technology to deliver a comfortable swimming experience, safeguarding users against fluctuating outdoor temperatures.

One of the primary features of the Raypak 399B-2339B is its robust design, built to withstand the rigors of outdoor environments. With a durable cabinet made from corrosion-resistant materials, it ensures longevity and resistance to various weather conditions. This heater boasts a compact footprint, making it an ideal choice for properties with limited installation space.

A standout characteristic of this model is its energy efficiency. The Raypak 399B-2339B utilizes a high-efficiency gas burner, allowing it to heat water quickly while consuming less fuel. This efficiency not only reduces operational costs but also aligns with environmentally conscious practices, making it an appealing choice for eco-friendly users.

Equipped with innovative technologies, this heater offers both digital controls and diagnostic capabilities. The user-friendly digital display allows for precise temperature control and easy monitoring of the heater's performance. Additionally, the built-in diagnostics feature alerts users to any operational issues, ensuring timely maintenance and minimizing downtime.

The Raypak 399B-2339B is compatible with both natural gas and propane, providing versatility in energy sources. This adaptability can be particularly beneficial for those seeking to switch fuel types or utilize available resources. Moreover, its low NOx emissions make it compliant with stringent environmental regulations, contributing to cleaner air and a healthier ecosystem.

In terms of heating capacity, the Raypak 399B-2339B boasts a powerful output, efficiently heating large bodies of water. This performance makes it suitable for various applications, from residential pools to commercial aquatic centers, ensuring that swimming enjoyment is never compromised due to cold water.

The unit also features a built-in water hydraulics system that optimizes water circulation, preventing overheating and prolonging the lifespan of the heater. Furthermore, the Raypak engineering team has ensured that the installation process is straightforward, with clear guidelines and necessary plumbing fittings provided.

In summary, the Raypak 399B-2339B is a top-tier pool heater that offers durability, energy efficiency, advanced technology, and versatile fuel compatibility. Its high performance and user-friendly features make it a reliable investment for anyone looking to enhance their swimming experience.