powered. If the switch is “ON” and there is no call for heat (CFH), the heater is in standby mode.

18.After the standby switch is placed into the “ON” position, a 24 VAC signal is sent to the green power light on the front of the unit and the “enable/disable” connection (normally jumpered).

19.24 VAC switched power is applied to the 24VAC terminal on the ignition module.

20.When the “enable/disable” contacts are closed, the 24 VAC signal travels to pin 1 of the stage 1 connection and waits for a CFH.

21.When a CFH occurs, a 24 VAC signal is sent from J-5 CFH on the CPW board to the amber CFH light on the front of the unit.

22.Power is now sent to terminal TRIG of the pump delay relay to energize it and close the contacts.

23.The heater pump is energized.

24.Upon sufficient flow from the heater pump, the flow switch contact will close.

25.A 24 VAC signal is then sent to the “TH” terminal located on the ignition module.

26.Once the 24 VAC “TH” signal is received, a 120 VAC signal is sent from F2 on the ignition module to the 120 VAC pilot duty terminals, located at J-14 on the circuit board.

27.The 120 VAC signal continues to the coil of relay K-3 (N.O.).

28.The 120 VAC signal continues to the 120 VAC safety terminals located at J-13 on the circuit board.

29.When the coil on relay K-3 (N.O.) is powered, the relay contacts (K-3) close and energize the blow- er(s) from the J-8 connections on the CPW board.

30.After proper air pressure is received in the air plenum, the air pressure switch(s) will close.

31.Power is applied to the optional equipment inter- lock connection (normally jumpered).

32.The 24 VAC signal is then sent to the 24 VAC safe- ty connector.

33.24 VAC is now sent to the pressure switch (P Switch) terminal on the ignition module.

34.Once the pressure switch signal is received at the ignition module, the hot surface igniter is ener- gized by a 120 VAC signal from S-1 on the ignition module. (The hot surface igniter must draw greater than 3.2 amps while being energized or the ignition module red LED will flash 4 times and ignition lockout will occur after three tries).

35.Once the ignition module determines that the hot surface igniter is operating properly, a 24 VAC sig- nal is output from terminal “valve” of the module.

36.A 24 VAC signal is sent to gas valve 1.

37.The blue LED on the front of the unit is now illumi- nated.

38.The coil of relay K-2 (N.O.) is now energized with the (K-2) contacts closing downstream of the stage 2 and upstream of the stage 3 connections.

39.The gas coming through the burners should ignite from the heat of the hot surface igniter and the flame should carry over from one burner to the other burners of stage 1. The remote sensor is now trying to sense the flame. If the flame is not sensed within 4 seconds, the ignition module will shut down the gas valve and retry the hot surface igniter. During ignition retry the heater must per- form a 15-second pre-purge and an approximately 30-second igniter warm-up before opening gas valve 1 again. The standard ignition module will attempt ignition a maximum of three times prior to ignition lockout.

40.After gas valve 1 opens and flame rectification is received, time delay relay 1 (TD-1) is powered and starts a 5-second countdown.

41.After the 5 second countdown from TD-1, 24 VAC is waiting at pin 3 of the stage 2 connection on the CPW board.

42.After closure of the stage 2 contacts Gas valve 2 in energized.

43.After a 5 second countdown from TD-2, 24 VAC is waiting at pin 5 of the stage 3 connection on the CPW board.

44.After closure of the stage 3 contacts Gas valve 2 is energized.

34

Image 34
Contents Installation & Operating Instructions Page Contents Pay Attention to These Terms Product Receipt Before InstallationInstallations at Elevation Model IdentificationComponent Locations Component Locations BackGeneral Information Burners per Valve Stages Fire at StageTime/Temperature Relationships in Scalds General SafetyWater Time to Produce Serious Temp Burn Equipment Base InstallationInstallation Codes StackingTable D Vent/Air Inlet Termination Clearances Outdoor Installations Indoor InstallationsClearances Combustion and Ventilation Air Conventional Combustion Air SupplyCanadian Installations All Air from OutdoorsReversing Water Connections Relief Valve Piping Water PipingGeneral Hydrostatic TestModels 399B-899B Models 989B-2339B Cold Water OperationCold Water Starts Pump Selection Temperature & Pressure GaugeHydronic Heating Cold Water RunAir-Separation/Expansion Tank Pressure Drop in Feet of Head Feedwater RegulatorPiping Three-Way ValvesGas Supply Potable Water and Space HeatingModel Gas Supply ConnectionTable I Maximum Equivalent Pipe Length Gas Supply Pressure Models 399B-2339B Adjustment Models 989B-2339BReversing Gas Supply Connection Field-Connected Controllers Electrical Power ConnectionsCheck the Power Source Making the Electrical ConnectionsField Wiring Connection On-Off Wiring ConnectionsStage Wiring Connections Single Stage Tankstat Support of Vent Stack VentingBarometric Damper Installations Vent Terminal LocationCanadian Installations Venting Installation TipsChanging the Flue Outlet Natural Draft Vertical Venting Category Venting ConfigurationsInstallation TerminationSize Material MinHorizontal Through-the-Wall Venting Category Horizontal Through-the-Wall Venting CategoryMaterial Vent Length Controls Outdoor InstallationFreeze Protection Models 399B-899B Heater Sequence of OperationExternal Lights Color Indication Page Models 989B-2339B Models 1529B-2339B Only Ignition Module High Limit Manual ResetFlow Switch Operating ControlHigh and Low Gas Pressure Switches Low Water Cut-Off OptionalWiring Diagram Models 399B-1259B Wiring Diagram Models 1529B-2339B START-UP Pre Start-upMain Burner Adjustment Blower AdjustmentStart-Up Follow-Up Safety InspectionLeak Test Procedure Dual-Seat Gas Valves Pilot Turn-Down TestPost Start-Up Check Leak TestLighting Instructions OperationTo Turn Off Gas To Appliance Troubleshooting StepSuggested Minimum Maintenance Schedule MaintenancePreventive Maintenance Schedule Annually WeeklySemi-Annually As RequiredAppendix Inside Air ContaminationLimited Parts Warranty Delta Limited Types H and WH START-UP Checklist for FAN-ASSISTED Raypak Products

399B-2339B specifications

The Raypak 399B-2339B is a notable pool heater that stands out in the competitive market of heating solutions, particularly aimed at residential and commercial swimming pools and spas. Designed for efficiency and reliability, the Raypak 399B-2339B integrates advanced technology to deliver a comfortable swimming experience, safeguarding users against fluctuating outdoor temperatures.

One of the primary features of the Raypak 399B-2339B is its robust design, built to withstand the rigors of outdoor environments. With a durable cabinet made from corrosion-resistant materials, it ensures longevity and resistance to various weather conditions. This heater boasts a compact footprint, making it an ideal choice for properties with limited installation space.

A standout characteristic of this model is its energy efficiency. The Raypak 399B-2339B utilizes a high-efficiency gas burner, allowing it to heat water quickly while consuming less fuel. This efficiency not only reduces operational costs but also aligns with environmentally conscious practices, making it an appealing choice for eco-friendly users.

Equipped with innovative technologies, this heater offers both digital controls and diagnostic capabilities. The user-friendly digital display allows for precise temperature control and easy monitoring of the heater's performance. Additionally, the built-in diagnostics feature alerts users to any operational issues, ensuring timely maintenance and minimizing downtime.

The Raypak 399B-2339B is compatible with both natural gas and propane, providing versatility in energy sources. This adaptability can be particularly beneficial for those seeking to switch fuel types or utilize available resources. Moreover, its low NOx emissions make it compliant with stringent environmental regulations, contributing to cleaner air and a healthier ecosystem.

In terms of heating capacity, the Raypak 399B-2339B boasts a powerful output, efficiently heating large bodies of water. This performance makes it suitable for various applications, from residential pools to commercial aquatic centers, ensuring that swimming enjoyment is never compromised due to cold water.

The unit also features a built-in water hydraulics system that optimizes water circulation, preventing overheating and prolonging the lifespan of the heater. Furthermore, the Raypak engineering team has ensured that the installation process is straightforward, with clear guidelines and necessary plumbing fittings provided.

In summary, the Raypak 399B-2339B is a top-tier pool heater that offers durability, energy efficiency, advanced technology, and versatile fuel compatibility. Its high performance and user-friendly features make it a reliable investment for anyone looking to enhance their swimming experience.