Raypak 055B installation instructions Vent Piping

Page 11

VENT PIPING

WARNING: Indoor boilers require a draft hood that must be connected to a vent pipe and properly vented to the outside. Failure to follow this procedure can cause fire or fatal carbon monoxide poisoning.

Vent piping the same size or larger than the draft hoodoutletisrecommended,however,whenthetotalvent height is at least ten (10) feet (draft hood relief opening to vent terminal), the vent pipe size may be reduced as specified in Chapter 10 of the latest edition of the National Fuel Gas Code, ANSI Z 223. (Canada-CAN/CGA- B149.1 and B149.2). As much as possible avoid long horizontal runs of vent pipe and too many elbows. If installation requires horizontalor or non-vertical runs, the vent pipe must have a minimum of 1/4 inch per foot rise and should be supported at not less than five foot intervals. Plumbers tape, criss-crossed, will serve to space both horizontal and vertical piping. Gas vents supported only by the flashing and extending above the roof more than five feet should be securely guyed or braced to withstand snow and wind loads. We recommend use of insulated vent pipe spacer through the roofs and walls.

For protection against rain or blockage by snow, the vent pipe must terminate with a vent cap which complies with the local codes or, in the absence of such codes, to the latest edition of the National Fuel Gas Code, ANSI Z223.1-1988 (Canada-CAN/CGA-B149.1 and B149.2).

The discharge opening must be a minimum of two feet vertically from the roof surface and at least two feet higher than any part of the building within ten feet. Vent stack shall be at least five feet in vertical height above the draft hood outlet. The vent cap location shall have a minimum clearance of 4 feet horizontally from, and in no case above or below, unless a 4-foot horizontal distance is maintained, from electric meters, gas meters regula- tors and relief equipment.

The weight of the vent stack or chimney must not rest on heater draft hood. Support must be provided in compliance with applicable codes. The heater top and draft hood must be readily removable for maintenance and inspection. Vent pipe should be adequately sup- ported to maintain proper clearances from supported to maintain proper clearances from combustible construc- tion.

Type "B" double wall or equivalent vent pipe is recommended. However single wall metal vent pipe may be used as specified in the latest edition of the National Flue Gas Code ANSI Z 223.1-1988 (Canada-CAN/CGA- B149.1 and B149.2).

10' OR LESS

VENT CAP

2' MIN

2' MIN

5' MIN

VENT PIPE

DRAFT HOOD

HEATER

10

Image 11
Contents What to do if YOU Smell GAS VersaContents Water For Your Safety Read Before OperatingSTART-UP Procedures Before START-UP BurnersTo Turn OFF GAS to Appliance Millivolt SystemLighting Instructions Operating Instructions Electronic Ignition SystemsVisual Inspection Maintenance Care ProceduresWater Pressure Switch After START-UPWinterizing the SPA Heater Basic Tips if Heater will not FirePool & SPA Water Chemistry Cold Weather OperationReceiving Equipment General SpecificationInstallation Instructions Outdoor Heaters ALL HeatersStep Indoor HeatersVenting Connections Vent Piping Robertshaw MV GAS Supply ConnectionsModel GAS Pressure RegulatorAutomatic Chlorinators and Chemical Feeders Plumbing for Water Connections LocationFlow Rates Companion Flange ConnectionsElectronic Intermittent Ignition Device System IID Auxiliary Bypass Valve AdjustmentPressure Relief Valve Installation Electrical Wiring Millivolt SystemFig. #9240 Wiring Diagram KEYWiring Diagram Millivolt Units With Solid State Thermostat Wiring Diagram Millivolt Units With Mechanical ThermostatWiring Diagram 152178 Model 055 IID Servicing Instructions CONTROLS/ADJUSTMENTS/REPLACEMENTSTemperature Controls Pressure SwitchHigh Limit Removal Pressure Switch Adjustment Flame ROLL-OUT Safety SwitchHigh Limits TWO Speed PumpsMain Burner and Orifice Removal Pilot Removal and CleaningBurner Drawer Removal GAS Valve RemovalControl Immersion Well Replace Desooting ProcedureUnitherm Governor U.G. Replacement Combustion Chamber RemovalTrouble Shooting Guide Liming Bypassing too much water Measured and Estimated Resistance Match Within 20 Percent Electrical Solid State Thermostat MillivoltHigh Voltage Troubleshooting Honeywell S8600Electrical Electronic Ignition IID Voltage Between 21.5-28.5 Electrical Solid State Thermostat IIDRAYPAK, INC Agoura Road Westlake VILLAGE, CA Replacement Parts List13-P 14-P 15-P IIDPage Page Warranty Conditions

055B specifications

The Raypak 055B is a high-performance pool and spa heater recognized for its efficiency, reliability, and advanced technologies tailored to meet the needs of consumers. Its compact design and powerful heating capabilities ensure that users enjoy warm water conditions regardless of the outdoor temperature.

One of the main features of the Raypak 055B is its exceptional heating output. With a power rating that can efficiently heat both pools and spas, this model is designed for performance. The heater's efficient heat exchanger is constructed from copper that enhances the transfer of heat, allowing for rapid heating while optimizing energy use. This results in lower utility bills and a smaller environmental footprint.

The Raypak 055B incorporates innovative technology that enhances user experience. It features a digital display that allows for precise temperature control and easy adjustments. Users can set the desired temperature and monitor energy usage, ensuring they achieve the perfect balance between comfort and efficiency. The built-in diagnostic system helps users troubleshoot any issues quickly, maintaining the heater's performance and prolonging its lifespan.

Another significant characteristic of the Raypak 055B is its reliability. The heater is designed with a durable, rust-resistant cabinet that protects the internal components from the elements. This rugged construction makes the Raypak 055B an excellent choice for outdoor installations, ensuring longevity and reliable operation year-round.

The advanced airflow design in the Raypak 055B ensures a safe and efficient operation. The heater is equipped with a standard fan that aids in efficient operation while minimizing noise. Additionally, its low NOx emissions technology meets strict environmental regulations, making it an environmentally friendly option.

The Raypak 055B also includes an innovative ignition system for enhanced safety and convenience. The direct spark ignition eliminates the need for a standing pilot light, reducing gas consumption and further improving efficiency. The unit's freeze protection feature prevents damage during harsh winter conditions, ensuring that users can rely on it throughout the seasons.

In conclusion, the Raypak 055B stands out as a top choice for pool and spa heating solutions. With its combination of efficiency, durability, and advanced technology, it meets the demands of modern consumers looking for comfort without compromising on performance or sustainability. Whether you need to heat a residential pool or a commercial spa, the Raypak 055B is engineered to deliver exceptional results.