Installation

Lifting and Rigging

WARNING

DAMAGE TO EQUIPMENT OR PERSONNEL

Do not remove tension rods until the EcoBreeze Frame is placed and secured on its supports.

Before lifting the EcoBreeze Frame, ensure the lifting equipment is adequately sized for the load.

Lift and rig the EcoBreeze Frame from the top four ISO corners only.

Move the EcoBreeze Frame directly from the truck to its permanent foundation. If the Frame must be placed elsewhere temporarily, it must be placed on a flat and level surface in order to avoid damage.

Check for overhead obstructions such as power cables.

Maintain a minimum safe distance while equipment is hoisted.

Control access of personnel at lift site.

Failure to follow these instructions can result in death, serious injury, or equipment damage.

EcoBreeze Frame. The EcoBreeze Frame is not equipped with forklift pockets. Lift and rig only from the four upper ISO corner blocks on each EcoBreeze Frame using a crane. Recommended horizontal sling angles are greater than 45 degrees. Lifting equipment must be rated for at least 18 144 kg (40,000 lb) for lifting a 12.2 m (40 ft) Frame, and at least 12 247 kg (27,000 lb) for a 6 m (20 ft) Frame.

EcoBreeze System Installation

13

Image 17
Contents EcoBreeze System Installation ManualSchneider Electric IT Corporation Legal Disclaimer Contents Electrical Connections Mechanical ConnectionsGeneral Information SafetyInspecting the Equipment Storing the equipment before installationModel identification label location Model IdentificationFrames ModulesHazard of Electric Shock Access Door and Panel OperationDescription Quantity 20 ft 40 ft Component IdentificationItem Description EcoBreeze Frame and ModulesRemote display interface Module frontSite Preparation Incoming power supply requirements DuctworkWater supply FoundationEnvironment Piping/plumbing diagram Refrigeration Wall or Other Obstruction Service accessFrame Weights and DimensionsLifting and Rigging InstallationPosition the EcoBreeze Mechanical ConnectionsUnwrap the equipment Remove the tension rods Lower Module drop-down box Water supply connection Drain AIR GAP Electrical Connections Hazard to Equipment and Personnel Power supply to EcoBreeze FrameDDC Panel 126 K4 N4 G4 198 193 195 190 196 197Building Management System Page Page Worldwide Customer Support