Schneider Electric ACECFR20200SE, ACECFR20101SE, ACECFR40200SE, ACECFR40101SE Unwrap the equipment

Page 19

Unwrap the equipment

na3679a

NOTICE

DAMAGE TO EQUIPMENT

Do not remove the plastic wrap until the EcoBreeze Frame is placed on its permanent supports and you are prepared to install the return air ductwork. If the plastic is removed, ensure that the return air plenums on top of the Frame are protected.

When removing protective plastic wrap, be careful to cut only the plastic and not damage the exterior of the equipment.

The plastic wrap protects the return air plenum openings on top of the Frame until the return air ductwork is installed.

Failure to follow these instructions can result in equipment damage.

EcoBreeze System Installation

15

Image 19
Contents EcoBreeze System Installation ManualSchneider Electric IT Corporation Legal Disclaimer Contents Electrical Connections Mechanical ConnectionsGeneral Information SafetyInspecting the Equipment Storing the equipment before installationModules Model IdentificationModel identification label location FramesHazard of Electric Shock Access Door and Panel OperationDescription Quantity 20 ft 40 ft Component IdentificationItem Description EcoBreeze Frame and ModulesRemote display interface Module frontFoundation Incoming power supply requirements DuctworkSite Preparation Water supplyEnvironment Piping/plumbing diagram Refrigeration Wall or Other Obstruction Service accessFrame Weights and DimensionsLifting and Rigging InstallationPosition the EcoBreeze Mechanical ConnectionsUnwrap the equipment Remove the tension rods Lower Module drop-down box Water supply connection Drain AIR GAP Electrical Connections Hazard to Equipment and Personnel Power supply to EcoBreeze FrameDDC Panel 126 K4 N4 G4 198 193 195 190 196 197Building Management System Page Page Worldwide Customer Support