Schneider Electric ACECFR40101SE, ACECFR20101SE, ACECFR20200SE, ACECFR40200SE DDC Panel

Page 27

Remote display interface

NOTICE

DAMAGE TO EQUIPMENT

Damage to LCD display will result from exposure to temperatures below 0°C (32°F). Outdoor installations will require a third-party heat source as needed to ensure the LCD display is not subjected to temperatures below 0°C (32°F).

Failure to follow these instructions can result in equipment damage.

See EcoBreeze remote display installation instructions for additional information.

The remote display interface enclosure contains the LCD display that is used to control the EcoBreeze from a remote location. The EcoBreeze connects to the remote display interface over an expansion bus.

NOTE: Separate incoming power cables from low voltage wiring by 150 mm (6 in.).

NOTE: Communication wiring from the EcoBreeze to the remote display interface enclosure must be a minimum of 24-gauge, 3-core wire with shield with a maximum length of 300 m (984 ft).

1.Install the remote display interface enclosure in the desired location.

IMPORTANT: For outdoor applications, use weather-proof conduit connectors.

OPERATING CONDITIONS: Ambient temperature 0 - 55°C (32 - 131°F). Relative humidity 5% - 95% non-condensing.

NOTE: Connect shield wire to GND.

2.Connect the bus wiring to the contacts labeled 124, 125, and 126 on the expansion bus terminal block, located behind the direct digital controller (DDC) access door on the Frame.

DDC PANEL

ENCLOSURE

na3716a

124

125

126

GND

EcoBreeze System Installation

23

Image 27
Contents EcoBreeze System Installation ManualSchneider Electric IT Corporation Legal Disclaimer Contents Electrical Connections Mechanical ConnectionsGeneral Information SafetyInspecting the Equipment Storing the equipment before installationModules Model IdentificationModel identification label location FramesHazard of Electric Shock Access Door and Panel OperationDescription Quantity 20 ft 40 ft Component IdentificationItem Description EcoBreeze Frame and ModulesRemote display interface Module frontFoundation Incoming power supply requirements DuctworkSite Preparation Water supplyEnvironment Piping/plumbing diagram Refrigeration Wall or Other Obstruction Service accessFrame Weights and DimensionsLifting and Rigging InstallationPosition the EcoBreeze Mechanical ConnectionsUnwrap the equipment Remove the tension rods Lower Module drop-down box Water supply connection Drain AIR GAP Electrical Connections Hazard to Equipment and Personnel Power supply to EcoBreeze FrameDDC Panel 126 K4 N4 G4 198 193 195 190 196 197Building Management System Page Page Worldwide Customer Support