Stovax 8544LUC-P8544LUC, ASHDON 8546LUC-P8546LUC, 8545LUC, P8545LUC, 8547LUC-P8547LUC Commissioning

Page 19

INSTALLATION INSTRUCTIONS

COMMISSIONING

1.COMMISSIONING

1.1Having run the gas supply to the stove, PURGE THE SUPPLY PIPE, this is essential to expel any debris that may block the gas controls. Connect the gas supply to the 8mm compression elbow at the RH rear corner of the stove, see diagram 1.

1.2Connect a suitable pressure gauge to the test point located on the inlet fitting, and turn the gas supply on. Light the appliance and check all gas joints for possible leaks. Turn the appliance to maximum and check that the supply pressure is as stated on the data badge. Turn the gas off and replace the test point screw, turn the gas on and check the test point for leaks.

1

AR0934

1.3Check that the installation instructions and any local regulations are complied with. Check that all seals are in good condition. Complete the Appliance Commissioning Checklist at the front of these Instructions. Explain the operation of the appliance to the end user.

Hand the completed instructions to the User for safe keeping, as the information will be required when making any guarantee claims.

19

Image 19
Contents Clarendon & Ashdon Log Effect Stove Range Contents Flue Check Pass Fail Appliance Commissioning ChecklistGAS Check Turning OFF the Stove User InstructionsGeneral Lighting the StoveHandling & Disposal of Fire Ceramics Cleaning the FireFuel BED Arrangements Never Operate the Stove When the Door is Removed Servicing Installation DetailsFlame Failure Device ‘RUNNING IN’Technical Specification Installation InstructionsFlue and Chimney Requirements Site RequirementsTimber Framed Buildings TOP Exit Rear FlueALL Appliances TOP Flue UP & OUT with Additional BendOptional Extra Flue Lengths & Bends Minimum Clearance Installation of the GAS SupplyVentilation Appliance LocationInstallation of the Stove InstallationControl Upgrade Safety PrecautionsDo not FIX the Flue AT this Stage Do not Attempt to Shorten ANY Other Section of Flue Pipe Vertical & Horizontal FlueTable a TOP Exit Vertical only Including Offset TOP Exit Vertical FlueRemove ANY Cardboard Fitment Remaining Fuelbed Arrangements Lighting Commissioning CommissioningIgnition Functional Check Servicing / Fault Finding ChartsServicing Instructions Servicing RequirementsPilot will not Stay LIT or Fire Goes OUT in USE Flame Failure Functional CheckMain Burner Replacing PartsPilot Unit Ignition Lead Main Injector Magnetic Safety ValvePiezo GAS ValveChanging Between GAS Types Primary Aeration PlateShort Spares List Service Records Member of the Stovax Group