ContentsInstructions for Use Installation and Servicing
For use in GB, IE Great Britain and EireWith upgradeable control valve
VFC Radiant & Convector Fire RangeCONTENTS
user instructions instaLlation InstructionsServicing InstructionsAPPLIANCE COMMISSIONING CHECKLIST
DEALER AND INSTALLER INFORMATIONIMPORTaNT NOTICE1.general
USER INSTRUCTIONS2.LIGHTING THE FIRE
3.TURNING THE FIRE OFFUSER INSTRUCTIONS
6.CLEANING THE FIRE5.UPGRADING YOUR FIRE
7.ARRANGEMENT OF FUEL BED COMPONENTSUSER INSTRUCTIONS
16” AND REDUCED DRAUGHT COAL LAYOUT18” COAL LAYOUT22” COAL LAYOUT
USER INSTRUCTIONSAR1121
AR1122USER INSTRUCTIONS
13. INSTALLATION DETAILS8. OXYGEN DEPLETION SENSOR
9. THE FLAME FAILURE DEVICEtHESE INSTRUCTIONS COVER THE FOLLOWING MODELS
TECHNICAL SPECIFICATIONVFC RADIANT
VFC CONVECTORSITE REQUIREMENTS
INSTALLATION INSTRUCTIONSINSTALLATION INSTRUCTIONS
SITE REQUIREMENTS1A VFC Radiant 1B VFC ConvectorINSTALLATION INSTRUCTIONS
INSTALLATION1.CONTROL UPGRADE
2.SAFETY PRECAUTIONSINSTALLATION INSTRUCTIONS
INSTALLATION5.INSTALLATION - CONVECTOR FIRESINSTALLATION
INSTALLATION INSTRUCTIONSADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS
6.ARRANGEMENT OF FUELBED COMPONENTSINSTALLATION
INSTALLATION INSTRUCTIONS16” AND REDUCED DRAUGHT COAL LAYOUT
NOTE CERAMIC PARTS ARE FRAGILEINSTALLATION
INSTALLATION INSTRUCTIONS6.9Curved fronts Holyrood- Place 6 large coals onto the front coal moulding ensuring that they rest against the front. Place 2 small coals onto the front coal, 1 at each end. See Diagram
18” COAL LAYOUTINSTALLATION INSTRUCTIONS
INSTALLATION7.LIGHTINGCOMMISSIONING
INSTALLATION INSTRUCTIONS1.COMMISSIONINGSERVICING REQUIREMENTS
SERVICING INSTRUCTIONSSee “NO SPARK” chart
FAULT FINDINGIGNITION FUNCTIONAL CHECK PILOT WILL NOT LIGHT
IGNITION FUNCTIONAL CHECK NO SPARKSERVICING INSTRUCTIONS
REPLACING PARTS2.IGNITION LEAD
3.PIEZOSERVICING INSTRUCTIONS
REPLACING PARTS5. ODS PILOT UNIT
6.GAS VALVEREPLACING PARTS
INSTALLATION INSTRUCTIONS7.MAG UNIT
8.MAIN INJECTORSPARES PARTS LIST
MANUAL FIRESNatural Gas PartsSERVICE RECORDS