Stovax 8455 User Instructions, 22” COAL LAYOUT, AR1121, AR1122, AR1123, AR1124, AR1126, AR1127

Page 7
AR1121

USER INSTRUCTIONS

10

AR1121

7.11 Place 6 large coals onto the flame baffle fingers. See Diagram 11.

11

AR1122

7.12Place 5 large coals so that they form a bridge between the other 2 rows, then 2 small coals, 1 at each end. Place 5 large coals at the back of the fire. See Diagram 12.

12

AR1123

7.13Place the remaining 5 small coals on top of the others so that they form a bridge between the second and third rows. See Diagram 13.

13

AR1124

22” COAL LAYOUT

7.14All fronts - place 8 large coals onto the front coal moulding ensuring that they rest against the front. Place 2 small coals on to the front coal, 1 at each end. See Diagram 14.

14

AR1126

7.15Place 8 large coals onto the flame baffle fingers. See Diagram 15.

15

AR1127

7.16Place 7 large coals so that they form a bridge between the other 2 rows, and 2 small coals, 1 at each end. Place 6 large coals at the back of the fire. See Diagram 16.

7

Image 7
Contents VFC Radiant & Convector Fire Range For use in GB, IE Great Britain and EireInstructions for Use Installation and Servicing With upgradeable control valveuser instructions instaLlation Instructions CONTENTSServicing Instructions DEALER AND INSTALLER INFORMATION APPLIANCE COMMISSIONING CHECKLISTIMPORTaNT NOTICE 3.TURNING THE FIRE OFF USER INSTRUCTIONS1.general 2.LIGHTING THE FIRE7.ARRANGEMENT OF FUEL BED COMPONENTS 6.CLEANING THE FIREUSER INSTRUCTIONS 5.UPGRADING YOUR FIRE16” AND REDUCED DRAUGHT COAL LAYOUT USER INSTRUCTIONS18” COAL LAYOUT AR1122 USER INSTRUCTIONS22” COAL LAYOUT AR11219. THE FLAME FAILURE DEVICE 13. INSTALLATION DETAILSUSER INSTRUCTIONS 8. OXYGEN DEPLETION SENSORVFC CONVECTOR TECHNICAL SPECIFICATIONtHESE INSTRUCTIONS COVER THE FOLLOWING MODELS VFC RADIANTSITE REQUIREMENTS INSTALLATION INSTRUCTIONSSITE REQUIREMENTS INSTALLATION INSTRUCTIONS1A VFC Radiant 1B VFC Convector 2.SAFETY PRECAUTIONS INSTALLATIONINSTALLATION INSTRUCTIONS 1.CONTROL UPGRADEINSTALLATION INSTALLATION INSTRUCTIONS5.INSTALLATION - CONVECTOR FIRES 6.ARRANGEMENT OF FUELBED COMPONENTS INSTALLATION INSTRUCTIONSINSTALLATION ADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICSNOTE CERAMIC PARTS ARE FRAGILE INSTALLATION INSTRUCTIONSINSTALLATION 16” AND REDUCED DRAUGHT COAL LAYOUT18” COAL LAYOUT INSTALLATION INSTRUCTIONSINSTALLATION 6.9Curved fronts Holyrood- Place 6 large coals onto the front coal moulding ensuring that they rest against the front. Place 2 small coals onto the front coal, 1 at each end. See DiagramINSTALLATION INSTALLATION INSTRUCTIONS7.LIGHTING INSTALLATION INSTRUCTIONS COMMISSIONING1.COMMISSIONING SERVICING REQUIREMENTS SERVICING INSTRUCTIONSIGNITION FUNCTIONAL CHECK NO SPARK FAULT FINDINGSee “NO SPARK” chart IGNITION FUNCTIONAL CHECK PILOT WILL NOT LIGHT3.PIEZO REPLACING PARTSSERVICING INSTRUCTIONS 2.IGNITION LEAD6.GAS VALVE REPLACING PARTSSERVICING INSTRUCTIONS 5. ODS PILOT UNIT8.MAIN INJECTOR INSTALLATION INSTRUCTIONSREPLACING PARTS 7.MAG UNITMANUAL FIRES SPARES PARTS LISTNatural Gas Parts SERVICE RECORDS