Stovax 8455 manual Installation Instructions, Installation - Convector Fires

Page 13
5.INSTALLATION - CONVECTOR FIRES

INSTALLATION INSTRUCTIONS

INSTALLATION

4.6Check the gas connections to the fire are sound. Light the fire and check all joints on the appliance.

4.7Check the appliance running pressure is correct. See databadge.

4.8Fit the fret to the fire front using two screws. See Diagram 4.

4

AR0311

5.INSTALLATION - CONVECTOR FIRES

5.1Make any necessary alterations to fireplace opening. Ensure that the lintel does not obstruct the flue outlet into the flue, and that there is a clear space for debris of at least 90mm. See Diagram 5.

5

AR0300

5.2Gas pipe entry must be through one of the holes in the rear of the convector box. See Diagram 6 & 7.

6

AR0200

Note: Gas pipes passing through masonry must be protected.

5.3If the isolation tap is to be fitted under the fire, the GAZCO GC0060 provides a neat and easy solution. See Diagram 7A.

77A

AR0306/7

5.4Remove the fire assembly (see Diagram 9), and offer the convector box into the opening, checking that it fits squarely. Mark the fixing holes and the gas pipe entry positions. See Diagram 8.

8

AR0313

5.5Fit the gas pipe into position, ready for passing into the convector box, ensuring enough remains to connect to the fire.

13

Image 13
Contents Instructions for Use Installation and Servicing For use in GB, IE Great Britain and EireWith upgradeable control valve VFC Radiant & Convector Fire Rangeuser instructions instaLlation Instructions CONTENTSServicing Instructions DEALER AND INSTALLER INFORMATION APPLIANCE COMMISSIONING CHECKLISTIMPORTaNT NOTICE 1.general USER INSTRUCTIONS2.LIGHTING THE FIRE 3.TURNING THE FIRE OFFUSER INSTRUCTIONS 6.CLEANING THE FIRE5.UPGRADING YOUR FIRE 7.ARRANGEMENT OF FUEL BED COMPONENTS16” AND REDUCED DRAUGHT COAL LAYOUT USER INSTRUCTIONS18” COAL LAYOUT 22” COAL LAYOUT USER INSTRUCTIONSAR1121 AR1122USER INSTRUCTIONS 13. INSTALLATION DETAILS8. OXYGEN DEPLETION SENSOR 9. THE FLAME FAILURE DEVICEtHESE INSTRUCTIONS COVER THE FOLLOWING MODELS TECHNICAL SPECIFICATIONVFC RADIANT VFC CONVECTORSITE REQUIREMENTS INSTALLATION INSTRUCTIONSSITE REQUIREMENTS INSTALLATION INSTRUCTIONS1A VFC Radiant 1B VFC Convector INSTALLATION INSTRUCTIONS INSTALLATION1.CONTROL UPGRADE 2.SAFETY PRECAUTIONSINSTALLATION INSTALLATION INSTRUCTIONS5.INSTALLATION - CONVECTOR FIRES INSTALLATION INSTALLATION INSTRUCTIONSADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS 6.ARRANGEMENT OF FUELBED COMPONENTSINSTALLATION INSTALLATION INSTRUCTIONS16” AND REDUCED DRAUGHT COAL LAYOUT NOTE CERAMIC PARTS ARE FRAGILEINSTALLATION INSTALLATION INSTRUCTIONS6.9Curved fronts Holyrood- Place 6 large coals onto the front coal moulding ensuring that they rest against the front. Place 2 small coals onto the front coal, 1 at each end. See Diagram 18” COAL LAYOUTINSTALLATION INSTALLATION INSTRUCTIONS7.LIGHTING INSTALLATION INSTRUCTIONS COMMISSIONING1.COMMISSIONING SERVICING REQUIREMENTS SERVICING INSTRUCTIONSSee “NO SPARK” chart FAULT FINDINGIGNITION FUNCTIONAL CHECK PILOT WILL NOT LIGHT IGNITION FUNCTIONAL CHECK NO SPARKSERVICING INSTRUCTIONS REPLACING PARTS2.IGNITION LEAD 3.PIEZOSERVICING INSTRUCTIONS REPLACING PARTS5. ODS PILOT UNIT 6.GAS VALVEREPLACING PARTS INSTALLATION INSTRUCTIONS7.MAG UNIT 8.MAIN INJECTORMANUAL FIRES SPARES PARTS LISTNatural Gas Parts SERVICE RECORDS