Stovax 8455 manual For use in GB, IE Great Britain and Eire, VFC Radiant & Convector Fire Range

Page 1
VFC Radiant & Convector

VFC Radiant & Convector

Fire Range

With upgradeable control valve

Instructions for Use,

Installation and Servicing

For use in GB, IE (Great Britain and Eire)

This appliance has been certified for use in countries other than those stated. To install this appliance in these countries, it is essential to obtain the

translated instructions and in some cases the appliance will require modification. Contact Gazco for further information.

IMPORTANT

The chimney must be swept before installation. Do not attempt to burn rubbish on this fire. This fire has a naked flame. A suitable guard should be used for the protection of young children, the elderly or infirm

Please read these instructions carefully and keep them in a safe place. They will be needed when servicing the fire.

The commissioning sheet found in these instructions should be completed by the installer.

PR0641 Issue 8 (September 2008)

Image 1
Contents Instructions for Use Installation and Servicing For use in GB, IE Great Britain and EireWith upgradeable control valve VFC Radiant & Convector Fire Rangeuser instructions instaLlation Instructions CONTENTSServicing Instructions DEALER AND INSTALLER INFORMATION APPLIANCE COMMISSIONING CHECKLISTIMPORTaNT NOTICE 1.general USER INSTRUCTIONS2.LIGHTING THE FIRE 3.TURNING THE FIRE OFFUSER INSTRUCTIONS 6.CLEANING THE FIRE5.UPGRADING YOUR FIRE 7.ARRANGEMENT OF FUEL BED COMPONENTS16” AND REDUCED DRAUGHT COAL LAYOUT USER INSTRUCTIONS18” COAL LAYOUT 22” COAL LAYOUT USER INSTRUCTIONSAR1121 AR1122USER INSTRUCTIONS 13. INSTALLATION DETAILS8. OXYGEN DEPLETION SENSOR 9. THE FLAME FAILURE DEVICEtHESE INSTRUCTIONS COVER THE FOLLOWING MODELS TECHNICAL SPECIFICATIONVFC RADIANT VFC CONVECTORSITE REQUIREMENTS INSTALLATION INSTRUCTIONSSITE REQUIREMENTS INSTALLATION INSTRUCTIONS1A VFC Radiant 1B VFC Convector INSTALLATION INSTRUCTIONS INSTALLATION1.CONTROL UPGRADE 2.SAFETY PRECAUTIONSINSTALLATION INSTALLATION INSTRUCTIONS5.INSTALLATION - CONVECTOR FIRES INSTALLATION INSTALLATION INSTRUCTIONSADVICE ON HANDLING AND DISPOSAL OF FIRE CERAMICS 6.ARRANGEMENT OF FUELBED COMPONENTSINSTALLATION INSTALLATION INSTRUCTIONS16” AND REDUCED DRAUGHT COAL LAYOUT NOTE CERAMIC PARTS ARE FRAGILEINSTALLATION INSTALLATION INSTRUCTIONS6.9Curved fronts Holyrood- Place 6 large coals onto the front coal moulding ensuring that they rest against the front. Place 2 small coals onto the front coal, 1 at each end. See Diagram 18” COAL LAYOUTINSTALLATION INSTALLATION INSTRUCTIONS7.LIGHTING INSTALLATION INSTRUCTIONS COMMISSIONING1.COMMISSIONING SERVICING REQUIREMENTS SERVICING INSTRUCTIONSSee “NO SPARK” chart FAULT FINDINGIGNITION FUNCTIONAL CHECK PILOT WILL NOT LIGHT IGNITION FUNCTIONAL CHECK NO SPARKSERVICING INSTRUCTIONS REPLACING PARTS2.IGNITION LEAD 3.PIEZOSERVICING INSTRUCTIONS REPLACING PARTS5. ODS PILOT UNIT 6.GAS VALVEREPLACING PARTS INSTALLATION INSTRUCTIONS7.MAG UNIT 8.MAIN INJECTORMANUAL FIRES SPARES PARTS LISTNatural Gas Parts SERVICE RECORDS