Vulcan-Hart BVD36FP32(F,L)N-1 Installation, Framing and Finishing, Figure Vent Pipe Clearance

Page 10
INSTALLATION

INSTALLATION

Framing and Finishing

1.Choose unit location.

2.Frame in fireplace with a header across the top. It is important to allow for the finished face thickness when setting the depth of the frame. See Figures 9 & 11.

3.Attach fireplace to framing using (4) adjustable nailing flanges. Preset depth to suit facing material (adjustable to 1/2", 5/8" or 3/4" depths).

4.Use (8) 1/2" hex-head screws supplied in hardware package to screw through slotted holes in nailing flanges, then screw into pre-drilled holes on fireplace side. Measure from face of fireplace to face of the nailing flanges to determine final depth.

MOUNTING

BRACKETS

NAIL OR OTHER SUITABLE FASTENER

Figure 9

Vent Pipe Clearance

Note: Maintain one inch (1") of clearance around vertical vent pipe. Follow the B-Vent system instructions for installation requirements and clearances. Failure to follow the B-Vent manufacturer's instructions may cause improper draft and possible fire hazard.

B-Framing and Finishing

Install the Fresh Air Kit - BVA1

A fresh air kit is available as an optional feature with this appliance. The fresh air kit helps to decrease the amount of room air taken by utilizing outside air for combustion. It is strongly recommended that it be installed. Installation of the fresh air kit should be performed at the framing stage of the fireplace installation.

The fresh air kit installs on the left side of the fireplace.

To install the BVA1 fresh air kit, refer to the installation instructions provided with the kit.

Note: The outside air kit can terminate at any level with the exception that it must terminate at least 1 ft below the vent termination cap. The fresh air kit inlet hood should be positioned at least 2 ft above the ground level, in a manner that will not allow snow, leaves, etc. to block the inlet.

WARNING: Exhaust products of gasoline engines are hazardous. The outside air must not be taken from a garage space, attic spaces, basements, or above the roofing where other heating appliance, fans, or chimneys exhaust or utilize the air.

Framing (Figure 11)

Fireplace framing can be built before or after the fireplace is set in place. Framing should be positioned to accommodate wall covering and fireplace facing material. The fireplace framing should be constructed of 2 x 4 lumber or heavier. The framing headers may rest on the fireplace standoffs. Refer to Figure 11 for minimum framing dimensions.

CAUTION: MEASURE FIREPLACE DIMENSIONS AND VERIFY FRAMING METHODS, AND WALL COVERING DETAILS BEFORE FRAMING CONSTRUCTION BEGINS.

Framing dimension "A" includes a three inch clearance for standoffs on firebox.

COMBUSTIBLES

Figure 10

Figure 9Install the Fresh Air Kit - BVA1Framing (Figure 11) TO

Page 10

19400-3-0406

Image 10
Contents The Keystone B Vent Zero Clearance Gas Fireplace B-VENT GAS FIREPLACEEFFECTIVE DATE APRIL TABLE OF CONTENTS SectionIMPORTANT SAFETY INFORMATION LP-GASWARNING ODOR SAFETY INFORMATION FOR USERS OF LP GASThat’s your signal to go into immediate action NO ODOR DETECTED - ODOR FADEQualified Installing Agency INTRODUCTIONInstructions to Installer Appliance CertificationDim BVD34 SPECIFICATIONSFIREPLACE DIMENSIONS BVD36Mantel Chart Figure CLEARANCESLOCATING FIREPLACE Figure Combustible MaterialGAS SUPPLY Installing a New Main Gas CockGAS SUPPLY CONT Checking Manifold PressuresFraming and Finishing INSTALLATIONInstall the Fresh Air Kit - BVA1 Figure Vent Pipe ClearanceCombustible Surround Installation INSTALLATION CONTFinishing Figure Installing the Vent System in a Chase VENTINGGeneral Maintenance Vent RunsNever downsize venting diameters Clearances VENTING CONTVent Size Vent ConfigurationLOG PLACEMENT 5 LOG SET EMBER MATERIAL PLACEMENT ON BURNERBOTTOM LOG LOCATOR PINS LOG PLACEMENT 3 LOG SETEMBER PLACEMENT TOP BRANCH REAR LOG BOTTOM LOG750 Millivolt System OPERATING INSTRUCTIONSGAS CONTROL KNOB SHOWN IN OFF POSITION Initial LightingFRBC Battery Operated Remote Control OPERATING INSTRUCTIONS CONTWall Switch, FWS-1optional Electric 120 volt Operated Remote Control, FRECSTANDING PILOT WIRING DIAGRAM LIGHTING INSTRUCTIONS FOR YOUR SAFETY, READ BEFORE LIGHTINGSTANDING PILOT LIGHTING INSTRUCTIONS TO TURN OFF GAS TO FIREPLACE4.Frequent pilot outage problem STANDING PILOT TROUBLESHOOTING6.Glass Sooting SAFETY SHUTDOWN SYSTEM STANDING PILOT PROPANE/LP GAS CONVERSIONCHECK SAFETY SHUTDOWN PERFORMANCE B-VENTFIREPLACESPILOT ORIFICE CONVERSION DIRECT IGNITION WIRING DIAGRAM OPTIONAL REMOTE CONTROL 120V DIRECT IGNITIONLIGHTING INSTRUCTIONS FOR YOUR SAFETY READ BEFORE LIGHTINGDIRECT IGNITION LIGHTING INSTRUCTIONS TO TURN OFF GAS TO APPLIANCEDIRECT IGNITION TROUBLESHOOTING DIRECT IGNITION PROPANE/LP GAS CONVERSIONMaxitrol Valve Conversion DIRECT IGNITION PROPANE/LP GAS CONVERSIONVALVE CONVERSION Cleaning Procedure MAINTENANCE AND SERVICEClean Burner and Control Compartment Glass Cleaning Optional KitsBVD34 & BVD36 PARTS LIST 19400-3-0406 BVD34 & BVD36 PARTS VIEWPage BVP42 PARTS LIST 19400-3-0406 BVP42 PARTS VIEWPage FBB4 OPTIONAL VARIABLE SPEED BLOWER INSTALLATION BLOWER ASSEMBLY FBB4 OPTIONAL VARIABLE SPEED BLOWER INSTALLATIONJUNCTION BOX FAN BLACK FAN SWITCH WHITE GROUND 110 VOLT ACSTANDARD MILLIVOLT VALVE MODELS JUNCTION BOX WIRING INSTALLATION INSTRUCTIONS120V DIRECT IGNITION VALVE MODELS OPTIONAL ACCESSORIES 19400-0-1005 DECORATIVE ACCESSORIESPage Decorative Louver MissionSERVICE NOTES HOW TO ORDER REPAIR PARTS Page SERVICE NOTES19400-3-0406 19400-3-0406 SERVICE NOTESPage Page Empire Comfort Systems, Inc19400-3-0406