Samsung AQV24PSBNSER, AQV12PWAX, AQV12PSBX manual Outdoor Unit, Choosing the installation location

Page 24
 Outdoor Unit

Choosing the installation location

Manual background Outdoor Unit

Where it is not exposed to strong wind

Well ventilated and dustless places

Out of the direct sunlight and rain

Where neighbors are not annoyed by operation sound or hot air

Solid wall or support that prevents vibration and is strong enough to hold the product weight

Where there is no risk of flammable gas leakage

When installing the unit at a high place be sure to fix the unit legs

3m or more away from the TV or radio (to prevent the screen from being distorted or noise from being generated)

Install the unit horizontally

Place where drained water does not become any problem.

Place with no plants (especially climbing plants) and where small animal can not access.

• Avoid the following places to prevent malfunction of the unit

- Where there is machine oil

- Salty environment such as seaside areas

- Where sulfide gas exists

- Other special atmosphere areas

Observe the clearances and maximum lengths as seen in the picture below when installing the air conditioner. If using a multi system, install as described in the installation manual supplied with the outdoor unit.

Manual background300mm or more

125mm or more

Wrap the refrigerant pipes and the drain hose

You can select the direction of

with the absorbent pad and vinyl tape. Refer to

draining

page 39 for further details.

(left or right).

 

 

'L' m as maximum pipe length

 

and 3 m as minimum pipe length

 

(It will reduce noise and vibration)

600mm

' L ' meters maximum

total pipe length

minimum

 

300mm

 

minimum

300mm

 

 

minimum

600mm

 

minimum

 

125mm or more

'H ' meters maximum total pipe length

Model

L

H

09/12

15

8

18/24

30

15

Manual backgroundManual background Make at least one round: It will reduce noise and vibration

The appearance of the unit may be different from the diagram depending on the model.

24

Image 24
Contents Page Features of your new air conditioner Cool Summer OfferCost Efficient System Look for EverywhereSafety precautions USING PARTSImportant safety symbols and precautions FOR INSTALLATIONFOR USING FOR POWER SUPPLYDo not pull the power cord, when unplugging the power plug Do not touch the power plug or the circuit breaker with wet handsFOR CLEANING Do not clean the inside of the air conditioner by yourselfDo not place objects or devices under the indoor unit Do not operate the appliance with wet handsChecking before use Operation rangesModel RJ Maintaining your air conditionerPower button Checking the name of the partsMain parts DisplayChecking the remote controller Remote controller buttonsRemote controller display Smart Saver On TimerRemote controller display Battery changing timeStoring the remote controller Turbo indicatorBasic function AutoCool Heatbutton to adjust the temperature Press the button to turn on the air conditionerPress the button to set the operating mode Press theAdjusting the air flow direction Using the Turbo functionPress the Air swingbutton on the remote controller Press the Turbo button on the remote controller during Cool modeWhen the air conditioner is on and in cool/heat mode 1. Press the button on the remote controllermode Temperature and fan speed changes in modeSetting the On/Off timer Setting On timer Setting Off timer1. Press the On Timer/Off Timer button Additional options available in On timer modeUsing the Smart Saver function If the air conditioner is onIf the air conditioner is off Combining On Timer and Off TimerUsing the Quiet function Using the Auto Clean functionPress the Auto Clean button When the air conditioner is turned off When the air conditioner is turned onCleaning the air conditioner Cleaning the indoor unitCleaning the outdoor unit heat exchanger Opening the panelCleaning the air filter Removing the Air filterOpen the panel and put the Air filter out Dry the Air filter in a ventilated areaMaintaining the air conditioner Periodical checksTroubleshooting PROBLEMSOLUTION not work at allError is indicated Noise is generatedflow movement changes. It is normal the outdoor unitINSTALLATION PARTS General informationIncluded Models Choosing the installation location Installing the unitPower supply line, fuse or circuit breaker Indoor unitOutdoor Unit When installing 1 outdoor unit When installing more than 1 outdoor unitSpace Requirements for Outdoor Unit Top viewAccessories Accessories in the indoor unit caseAccessories in the outdoor unit case Fixing the installation plate Optional accessoriesTools required for installation General Tools Tools for test operationsConnecting the assembly cable Cable specificationConnecting the cable Power cableof the electrical contact during a wiring work Installing and connecting the assembly pipe of the indoor unit 10. Connect the grounding conductor to the grounding terminals11. Close the terminal board cover by tightening the screw carefully 2. Smooth the cut edgesPurging the indoor unit Cutting or extending the pipe4. Cut off the remaining foam insulation 6. Pass the pipe through the hole in the wall4. Put a flare nut slightly into the pipe and modify the flare Depth AOuter Diameter Outer Diameter DInstalling and connecting the drain hose of the indoor unit Drain hose installationInstalling and connecting the drain hose of the indoor unit Changing direction of the drain hose1. Detach the rubber cap with the plier 2. Detach the drain hose by pulling it and turning to the leftInstallAA ing and connecting the drain hose of the outdoor unit Purging the connected pipes2. Connect a drain hose to the drain plug 3. Ensure that condensation draining is adequategas service port as seen in the picture Adding RefrigerantIf you use a pipe longer than 5m If you use a pipe shorter than 5mImportant information regulation regarding the refrigerant used Cylinder with siphon1. Please fill in with indelible ink 1975PerfoAA rming the gas leak tests To check for gas leaks on the outdoor unitTo check for gas leaks on the indoor unit Leak test with nitrogen before opening valvesOutdoor unit installed on the wall by rack 6. Attach the pipe to the wall using clamps optionalFixinAA g the indoor unit in place Fixing the outdoor unit in place1. Press the Power button and check the following 4. Press the Power button to stop the operationFinalAA Check and Trial Operation Check the followingsThe compression dimension should be and compress another two points in the same location5. Apply heat to the contraction tube to contract it 6. After tube contraction work is completed, wrap it with theSub PCB installationoptional 1. Turn the power off and take off the front panel of the indoor unit2. Take off the Cover PCB 3. Attach the Sub PCB to the right side of the Panel-frameENGLISH QUESTIONS OR COMMENTS? COUNTRYCALL EEE Yönetmeliğine Uygundur This EEE is compliant with RoHSuser & installation manual Air Conditionerimagine the possibilities AQV07P Series AQV09P Series AQV12P Series AQV18P Series
Related manuals
Manual 41 pages 25.73 Kb Manual 41 pages 25.56 Kb Manual 41 pages 6.72 Kb Manual 45 pages 23.92 Kb Manual 41 pages 27.43 Kb Manual 43 pages 36.93 Kb Manual 43 pages 57.93 Kb Manual 41 pages 20.41 Kb Manual 21 pages 39.04 Kb Manual 21 pages 44.89 Kb Manual 21 pages 49.66 Kb Manual 21 pages 36.79 Kb Manual 21 pages 55.58 Kb Manual 45 pages 44.27 Kb Manual 43 pages 7.81 Kb Manual 43 pages 10.58 Kb Manual 45 pages 17.94 Kb Manual 43 pages 52.7 Kb