Samsung AQV12PWAN, AQV12PWAX manual Installing and connecting the drain hose of the indoor unit

Page 33
Installing and connecting the drain hose of the indoor unit

Installing and connecting the drain hose of the indoor unit

When installing the drain hose for the indoor unit, check if condensation draining is adequate. When passing the drain hose through the 65-mm hole drilled in the wall, check the followings:

 Drain hose installationWall

Indoor unit Manual backgroundManual background

Drain hoseManual background

ENGLISHManual background

The drain hose must not be bent.

The drain hose must NOT slant upwards.

Manual backgroundManual background 5cm Manual background less

Keep a clearance of at least 5cm between the end of the drain hose and the ground.

The end of the drain hose must NOT be placed under water.

Ditch

Do not place the end of the drain hose in a hollow.

Manual background Drain hose installation

1.If necessary, connect the 2-meter extension drain hose to the drain hose.

2.If you use the extension drain hose, insulate the inside of the extension drain hose with a shield.

3.Fit the drain hose into 1 of 2 drain hose holes, then fix the end of the drain hose tightly with a clamp.

• If you do not use the other drain hose hole,

block it with a rubber stopper.

 

4. When extending the Drain Hose, hold the end of Drain Hose and Extended

 

Hose, rotate and insert the drain hose into Extended hose for 15~20 mm. Make

Drain hose hole

sure the two hoses are firmly connected, there is no water leakage.

 

5.Connect the Drain Hose after using Foam Insulation to wrap the Extended Hose. Then, Use vinyl tape to wrap the each side of connection by 20mm .

 

 

15~20 mm

20mm

20mm

 

 

or more

or more

 

Drain hose Extension

Drain hose

Extension

 

 

 

drain hose

 

 

 

 

 

drain hose

Vinyl Tape

Foam Insulation

 

 

 

 

6.

Pass the drain hose under the refrigerant pipe, keeping the drain

Shield

 

 

hose tight.

 

 

 

 

 

 

 

 

7.

Pass the drain hose through the hole in the wall. Check if it slants

 

 

 

downwards as seen in the picture.

 

 

 

 

8.

Using natural drainage method, check the drainage is normal.

Drain hose

Extension drain hose

33

Image 33
Contents Page Cool Summer Offer Features of your new air conditionerCost Efficient System Look for EverywhereUSING PARTS Safety precautionsImportant safety symbols and precautions FOR INSTALLATIONFOR POWER SUPPLY FOR USINGDo not pull the power cord, when unplugging the power plug Do not touch the power plug or the circuit breaker with wet handsDo not clean the inside of the air conditioner by yourself FOR CLEANINGDo not place objects or devices under the indoor unit Do not operate the appliance with wet handsOperation ranges Checking before useModel RJ Maintaining your air conditionerChecking the name of the parts Power buttonMain parts DisplayRemote controller buttons Checking the remote controllerRemote controller display Smart Saver On TimerBattery changing time Remote controller displayStoring the remote controller Turbo indicatorAuto Basic functionCool HeatPress the button to turn on the air conditioner button to adjust the temperaturePress the button to set the operating mode Press theUsing the Turbo function Adjusting the air flow directionPress the Air swingbutton on the remote controller Press the Turbo button on the remote controller during Cool mode1. Press the button on the remote controller When the air conditioner is on and in cool/heat modemode Temperature and fan speed changes in modeSetting On timer Setting Off timer Setting the On/Off timer1. Press the On Timer/Off Timer button Additional options available in On timer modeIf the air conditioner is on Using the Smart Saver functionIf the air conditioner is off Combining On Timer and Off TimerUsing the Auto Clean function Using the Quiet functionPress the Auto Clean button When the air conditioner is turned off When the air conditioner is turned onCleaning the indoor unit Cleaning the air conditionerCleaning the outdoor unit heat exchanger Opening the panelRemoving the Air filter Cleaning the air filterOpen the panel and put the Air filter out Dry the Air filter in a ventilated areaPeriodical checks Maintaining the air conditionerPROBLEM TroubleshootingSOLUTION not work at allNoise is generated Error is indicatedflow movement changes. It is normal the outdoor unitINSTALLATION PARTS General informationIncluded Models Installing the unit Choosing the installation locationPower supply line, fuse or circuit breaker Indoor unitOutdoor Unit When installing more than 1 outdoor unit When installing 1 outdoor unitSpace Requirements for Outdoor Unit Top viewAccessories Accessories in the indoor unit caseAccessories in the outdoor unit case Optional accessories Fixing the installation plateTools required for installation General Tools Tools for test operationsCable specification Connecting the assembly cableConnecting the cable Power cableof the electrical contact during a wiring work 10. Connect the grounding conductor to the grounding terminals Installing and connecting the assembly pipe of the indoor unit11. Close the terminal board cover by tightening the screw carefully 2. Smooth the cut edgesCutting or extending the pipe Purging the indoor unit4. Cut off the remaining foam insulation 6. Pass the pipe through the hole in the wallDepth A 4. Put a flare nut slightly into the pipe and modify the flareOuter Diameter Outer Diameter DDrain hose installation Installing and connecting the drain hose of the indoor unitChanging direction of the drain hose Installing and connecting the drain hose of the indoor unit1. Detach the rubber cap with the plier 2. Detach the drain hose by pulling it and turning to the leftPurging the connected pipes InstallAA ing and connecting the drain hose of the outdoor unit2. Connect a drain hose to the drain plug 3. Ensure that condensation draining is adequateAdding Refrigerant gas service port as seen in the pictureIf you use a pipe longer than 5m If you use a pipe shorter than 5mCylinder with siphon Important information regulation regarding the refrigerant used1. Please fill in with indelible ink 1975To check for gas leaks on the outdoor unit PerfoAA rming the gas leak testsTo check for gas leaks on the indoor unit Leak test with nitrogen before opening valves6. Attach the pipe to the wall using clamps optional Outdoor unit installed on the wall by rackFixinAA g the indoor unit in place Fixing the outdoor unit in place4. Press the Power button to stop the operation 1. Press the Power button and check the followingFinalAA Check and Trial Operation Check the followingsand compress another two points in the same location The compression dimension should be5. Apply heat to the contraction tube to contract it 6. After tube contraction work is completed, wrap it with the1. Turn the power off and take off the front panel of the indoor unit Sub PCB installationoptional2. Take off the Cover PCB 3. Attach the Sub PCB to the right side of the Panel-frameENGLISH COUNTRY QUESTIONS OR COMMENTS?CALL EEE Yönetmeliğine Uygundur This EEE is compliant with RoHSAir Conditioner user & installation manualimagine the possibilities AQV07P Series AQV09P Series AQV12P Series AQV18P Series
Related manuals
Manual 41 pages 25.73 Kb Manual 41 pages 25.56 Kb Manual 41 pages 6.72 Kb Manual 45 pages 23.92 Kb Manual 41 pages 27.43 Kb Manual 43 pages 36.93 Kb Manual 43 pages 57.93 Kb Manual 41 pages 20.41 Kb Manual 21 pages 39.04 Kb Manual 21 pages 44.89 Kb Manual 21 pages 49.66 Kb Manual 21 pages 36.79 Kb Manual 21 pages 55.58 Kb Manual 45 pages 44.27 Kb Manual 43 pages 7.81 Kb Manual 43 pages 10.58 Kb Manual 45 pages 17.94 Kb Manual 43 pages 52.7 Kb