Samsung AP55Q1DNUMG, AP55Q1CNUMG manual Test Operation

Page 32

Check and Test Operation (Continued)

Test Operation

After checking, read the manual carefully, and perform a test operation. Then deliver the unit to the customer.

(When delivering the unit, be sure to read carefully and follow the contents of the manual.)

1.Be sure to check whether the service valve is opened before attempting to perform the test operation.

2.Never attempt to start test operation by force pressing the electronic contactor as it is very dangerous.

(This is very dangerous as the protective device does not work.)

3.Be sure to perform the test operation after installation. It is easy to start the test operation in winter if you increase the sensor temperature to 23°C ~ 25°C by holding the indoor temperature sensor. (Cooling operation)

When the outdoor temperature is below zero, do not test operation for more than 3 minutes. Otherwise, the compressor will be damaged.

Temperature sensor

E-32

AP50Q1C_IBIM_E 32202-2.indd 32

2010-07-14 오후 4:42:17

Image 32
Contents Air Conditioner Safety Precautions Contents View of the Unit Indoor UnitRemote Control-Buttons Inserting the Remote Control BatteriesOperating Preparation ForCooling Your Room Heating Your Room Select the fan speed by pressingSelecting the Automatic Operating Mode Changing the Room Temperature Quickly To adjust the temperature, press Operating to the Long DistanceRemoving Excess Humidity Airing Your Room When Adjusting the Air Flow Direction VerticallyAdjusting the Air Flow Direction Horizontally To Cancel the Off Timer Setting the Off TimerTopic Recommendation Other FunctionOperating Recommendations Temperature and Humidity Ranges If the air conditioner is used at ThenCleaning Your Air Conditioner Solving Common Problems Problem Explanation/SolutionTechnical Specifications Power SupplyAccessory Parts List Part NameDrain plug Cable tie Putty Piping Pipe band Cover hole ScrewOutdoor Unit Selection of Installation PlaceIndoor Unit Electrical Work AP50Q1C Series When using NFB No Fuse BreakerWhen using ELB Earth Leakage Circuit Breaker When connecting 3Phase 3wires 220V AC AP55Q1C/AP55Q1D SeriesInstallation Procedures Connection of Refrigerant Piping Flare ProcessingPipe Bending Tightening of Connection PartsDrain Hose Connecting the PipeDrilling a Hole in the Wall Air Purge Refrigerant Charging Check and Test Operation CheckTest Operation Packing and Unpacking Guide Outdoor unit How to connect your extended power cables Wire tube power cable Connection sleeveQuestions or COMMENTS?
Related manuals
Manual 36 pages 9.37 Kb