How to connect your extended power cables

Items to prepare

(compressor and insulation tape should be prepared by an installation technician.)

Tools

Crimping plier

Connection sleeve (mm)

Insulation tape

Contraction tube (mm)

Spec

MH-14

20xØ7.0(HxOD)

Width 18mm

50xØ8.0(LxOD)

Shape

 

 

 

 

1.As shown in the figure, peel off the shields from the rubber/wire of the power cable.

- Peel off 20 mm of the wire shields of the tube installed already.

After peeling off the tube wire, you must insert a contraction tube.

2.Insert both sides of core wire of the power cable into the connection sleeve.

(Unit: mm)

Power cable (provided by us)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

 

20

 

20

60 120

180

Wire tube power cable

20

Connection sleeve

3.Using a compressor, compress the two points and flip it over and compress another two points in the same location.

-The compression dimension should be 8.0.

-After compressing it, pull both sides of the wire to make sure it is firmly pressed.

4.Wrap it with the insulation tape twice and position your contraction tube in the middle of the insulation tape.

5.Apply heat to the contraction tube to contract it.

6.After tube contraction work is completed, wrap it with the insulation tape to finish.

Comp. dim.

Compress it 4 times

5mm

Insulation tape

40mm Contraction tube

Insulation tape

In case of extending the electric wire, please DO NOT use a round-shaped pressing socket.

- Incomplete wire connections can cause electric shock or a fire

E-35

AP50Q1C_IBIM_E 32202-2.indd 35

2010-07-14 오후 4:42:19

Image 35
Contents Air Conditioner Safety Precautions Contents Indoor Unit View of the UnitInserting the Remote Control Batteries Remote Control-ButtonsFor Operating PreparationCooling Your Room Select the fan speed by pressing Heating Your RoomSelecting the Automatic Operating Mode Changing the Room Temperature Quickly Operating to the Long Distance To adjust the temperature, pressRemoving Excess Humidity Airing Your Room When Adjusting the Air Flow Direction VerticallyAdjusting the Air Flow Direction Horizontally Setting the Off Timer To Cancel the Off TimerTopic Recommendation Other FunctionOperating Recommendations If the air conditioner is used at Then Temperature and Humidity RangesCleaning Your Air Conditioner Problem Explanation/Solution Solving Common ProblemsPower Supply Technical SpecificationsCover hole Screw Accessory Parts ListPart Name Drain plug Cable tie Putty Piping Pipe bandOutdoor Unit Selection of Installation PlaceIndoor Unit Electrical Work AP50Q1C Series When using NFB No Fuse BreakerWhen using ELB Earth Leakage Circuit Breaker AP55Q1C/AP55Q1D Series When connecting 3Phase 3wires 220V ACInstallation Procedures Tightening of Connection Parts Connection of Refrigerant PipingFlare Processing Pipe BendingDrain Hose Connecting the PipeDrilling a Hole in the Wall Air Purge Refrigerant Charging Check Check and Test OperationTest Operation Packing and Unpacking Guide Outdoor unit Wire tube power cable Connection sleeve How to connect your extended power cablesQuestions or COMMENTS?
Related manuals
Manual 36 pages 9.37 Kb