Majestic Appliances RDV4136 installation instructions Vertical Through-the-Roof Applications

Page 18

RDV4136 Series Direct Vent Gas Fireplace

Zero Clearance Sleeve (if required)

Firestop

7” Pipe

24” (610mm) Minimum*

Screws

7TDVSNORK

(Snorkel)

4” (102mm) Clearance Min.

Window

Well

Gravel

Drain

Foundation Wall

*A minimum of 24” (610mm) ver- tical pipe must be installed when using the 7TDVSNORK Kit.

*The 22” (559mm) vertical rise (center to center) of the snorkel may be included for calculationof max. horizontal run.

Max. Height

40' (12m)

Min. Height 7���' (2.3m)

Max. 10' (3m)

Pipe Straps Every 3’ (914mm)

BG402

Fig. 29 Below grade installation.

If the foundation is recessed, use recess brackets (not supplied) for securing lower portion of the snorkel. Fasten brackets to wall first, then secure to snorkel with self drilling #8 x 1/2 sheet metal screws. It will be necessary to extend vent pipes out as far as protruding wall face. (Fig. 30)

 

Snorkel

Foundation Recess

Wall Screws

 

Recess Brackets

 

Watertight Seal

Sheet Metal

Screws

Around Pipe

 

BG401

Fig. 30 Snorkel installation, recessed foundation.

Vertical Through-the-Roof Applications

This Gas Fireplace has been approved for:

Vertical installations up to 40’ (12 m) in height. Up to a 10’ (3 m) horizontal vent run can be installed within the vent system using a maximum of two 90° elbows. (Fig. 31)

18

FP1244

Fig. 31 Support straps for horizontal runs.

Up to two 45° elbows may be used within the horizontal run. For each 45° elbow used on the horizontal level the maximum horizontal length must be reduced by 18” (457 mm).

Example: Maximum horizontal length 0 x 45° elbows = 10’ (3 m)

1 x 45° elbows = 8¹⁄’ (2.6 m)

2 x 45° elbows = 7’ (2.1 m)

A minimum of an 8’ (2.4 m) vertical rise.

Two sets of 45° elbows offsets within these vertical installations. From 0 to a maximum of 8’ (2.4 m) of vent pipe can be used between elbows. (Fig. 32)

7DVCS must be used to support offsets. (Fig. 34) This application will require that you first determine the roof pitch and use the appropriate starter kit. (Refer to Venting Components List)

The minimum height of the vent above the highest point of penetration through the roof is 2’ (610 mm). (Fig. 36)

Vertical Through-the-Roof Installation

1. Locate your fireplace.

2. Plumb to center of the (4” (102 mm) flue collar from ceiling above and mark position.

3. Cut opening equal to 9³⁄” x 9³⁄” (240 x 240 mm).

4. Proceed to plumb for additional openings through the roof. In all cases, the opening must provide a minimum of 1” (25 mm) clearance to the vent pipe, i.e., the hole must be at least 9³⁄” x 9³⁄” (240 x 240

mm).

10010618

Image 18
Contents Builder Top Vent Direct Vent Models RDV4136 Table of Contents Installation & Operating Instructions RDV4136 Certified ToAnsi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Requirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedFireplace Dimensions Clearance to Combustibles Mantel ChartLocating Your Fireplace MantelsFraming and Finishing Gas Line InstallationHearth Final FinishingRemote ON/OFF Switch Installation RN/RP ModelsInstallation IN/IP Models EB-1 Electrical Box EB-1 receptacleGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationGeneral Information on Assembling Vent Pipes Canadian InstallationsUSA Installations Flex Vent PipesExample a How to Use the Vent GraphTwist Lock Pipes Example BInstall baffle to the deflector Vertical Sidewall ApplicationsVertical Sidewall Installation Twist Lock Pipe Zero clearance sleeve is only required for combustible wallsAlways install horizontal venting on a level plane Vertical height requirementVertical Sidewall Installation Flex Vent Pipe Below Grade InstallationsStep Vertical Through-the-Roof Installation Vertical Through-the-Roof ApplicationsMin 610 mm Venting Components Operating Instructions Window Frame Assembly RemovalGlass Cleaning Glass InformationLog Identification Chart Installation of Logs, Lava Rock & Ember MaterialLog Installation LogsEmber Material Left Cross Log Right Cross Log Rear Log Front Flame Characteristics Correct pilot flame appearanceLighting and Operating Instructions For Fireplaces Equipped with the SIT 820 ValveTo Turn Off Gas To Heater Lighting Instructions Lighting & Operating InstructionsFor Fireplaces equipped with AF4000 Gas Valve Turning Off the Gas to the ApplianceTroubleshooting AF4000 ValveTroubleshooting AF4000 Valve Igniter operationAF4000 Valve Face Troubleshooting Honeywell VS8421 Remove Window Frame Assembly Before Service WorkBurner Orifice Conversion SkyTech ValveNova SIT820 Valve Pilot Orifice Conversion Injector Orifice Size MatrixLogs May Be HOT MaintenanceCleaning the Standing Pilot Control System Burner and Burner CompartmentRDV4136 Units GFSJ5J1RP RDV4136 Description RDV4136Fuel Conversion Kits Hard direct Wire Hook Up Optional AccessoriesFan Assembly Wiring InstructionsCeramic Refractory Panels Remote ControlsBack-up Battery Kit Porcelain Steel BackLimited Lifetime Warranty Efficiency Ratings