Majestic Appliances RDV4136 Vertical Sidewall Installation Flex Vent Pipe, Step

Page 17

Vertical Sidewall Installation

Flex Vent Pipe

NOTE: The 40” (1016 mm) flex vent is used for 90° off the top of the unit then out the back wall.

Follow Step 1 and 2 on Page 15.

Step 3

Install the four (4) spacer springs on the 4” flex vent pipe. When installing the spacer springs around the 4” pipe, stretch the spring to approximately 15” (381 mm), wrap the spring around the pipe and interlock the ends of the spacer spring approximately 2” (51 mm). Meas- ure 6³⁄” (172 mm) from the end of the pipe. Place the next spring 5” (127 mm) from the previously installed spring. Place the next spring 6” (152 mm) from the last spring. Finally place the last spring 12” (305 mm) from the last spring installed. (Fig. 27)

4” Flex Vent

 

Pipe

12"

 

 

(305mm)

Spacer Spring

6"

(152mm)

5"

(127mm)

6���"

(172mm)

FP1474

Fig. 27 Install spacer springs.

Step 4

Install the 4” (102 mm) flex vent pipe to the appliance collar as described on Page 12. Secure the end with the first spring 6³⁄” (172 mm) from the flex pipe end to the unit.

Step 5

Slide the 7” (178 mm) flex vent pipe over the 4” flex vent pipe and secure the 7” collar as described on Page 12.

Step 6

Bend the flex pipe horizontal so the bottom of the horizontal pipe measure 18¹⁄” (470 mm) from the top of the unit immediately after the 90° formation. (Fig. 28) Be sure to follow the 1” (25 mm) rise in a 24” (610 mm) horizontal run rule.

Step 7

Install the 4” flex then 7” flex to the termination.

RDV4136 Series Direct Vent Gas Fireplace

6���

(165 mm)

FP1846

Fig. 28 Bend flex vent at 90° so horizontal portion is 6¹⁄₂” (165 mm) off top of unit.

Below Grade Installations

When it is not possible to meet the required vent ter- minal clearances of 12” (305 mm) above grade level a snorkel vent kit is recommended. It allows installation depth of down to 7” (178 mm) below grade level. The 7” is measured from the center of the horizontal vent pipe as it penetrates through the wall.

If venting system is installed below ground, we recommend a window well with adequate and proper drainage.

Ensure sidewall venting clearances are observed.

If installing a snorkel a minimum 24” (610 mm) vertical rise is necessary. The maximum horizontal run with the 24” (610 mm) vertical pipe is 36” (914 mm). This measurement is taken from the collar of the fireplace (or transition elbow) to the face of the exterior wall. Refer to the Sidewall Vent Graph for extended horizontal run if the vertical rise exceeds 24” (610 mm).

1.Establish vent hole through the wall. (Fig. 21)

2.Remove soil to a depth of approximately 16” (406

mm)below base of snorkel. Install drain pipe. Install window well (not supplied). Refill hole with 12” (305

mm)of coarse gravel leaving a clearance of approxi- mately 4” (102 mm) below snorkel. (Fig. 29)

3.Install vent system.

4.Ensure a watertight seal is made around the vent pipe coming through the wall.

5.Apply high temperature sealant caulking (supplied) around the 4” and 7 “ snorkel collars.

6.Slide the snorkel into the vent pipes and secure to the wall.

7.Level the soil to maintain a 4” (102 mm) clearance below snorkel. (Fig. 29)

Do not back fill around snorkel. A clear- ance of at least 4” (102 mm) must be main- tained between snorkel and the soil.

10010618

17

Image 17
Contents Builder Top Vent Direct Vent Models RDV4136 Table of Contents Ansi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Installation & Operating InstructionsRDV4136 Certified To Gas Equipment Venting System not Provided Requirements for the Commonwealth of MassachusettsFireplace Dimensions Locating Your Fireplace Mantel ChartClearance to Combustibles MantelsHearth Gas Line InstallationFraming and Finishing Final FinishingInstallation IN/IP Models Remote ON/OFF SwitchInstallation RN/RP Models EB-1 receptacle EB-1 Electrical BoxLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2USA Installations Canadian InstallationsGeneral Information on Assembling Vent Pipes Flex Vent PipesTwist Lock Pipes How to Use the Vent GraphExample a Example BVertical Sidewall Applications Install baffle to the deflectorZero clearance sleeve is only required for combustible walls Vertical Sidewall Installation Twist Lock PipeVertical height requirement Always install horizontal venting on a level planeStep Vertical Sidewall Installation Flex Vent PipeBelow Grade Installations Vertical Through-the-Roof Applications Vertical Through-the-Roof InstallationMin 610 mm Venting Components Glass Cleaning Window Frame Assembly RemovalOperating Instructions Glass InformationLog Installation Installation of Logs, Lava Rock & Ember MaterialLog Identification Chart LogsEmber Material Left Cross Log Right Cross Log Rear Log Front Correct pilot flame appearance Flame CharacteristicsTo Turn Off Gas To Heater Lighting and Operating InstructionsFor Fireplaces Equipped with the SIT 820 Valve For Fireplaces equipped with AF4000 Gas Valve Lighting & Operating InstructionsLighting Instructions Turning Off the Gas to the ApplianceAF4000 Valve TroubleshootingIgniter operation Troubleshooting AF4000 ValveAF4000 Valve Face Remove Window Frame Assembly Before Service Work Troubleshooting Honeywell VS8421Nova SIT820 Valve Burner Orifice ConversionSkyTech Valve Injector Orifice Size Matrix Pilot Orifice ConversionCleaning the Standing Pilot Control System MaintenanceLogs May Be HOT Burner and Burner CompartmentRDV4136 Units GFSJ5J1RP Description RDV4136 RDV4136Fuel Conversion Kits Fan Assembly Optional AccessoriesHard direct Wire Hook Up Wiring InstructionsBack-up Battery Kit Remote ControlsCeramic Refractory Panels Porcelain Steel BackLimited Lifetime Warranty Efficiency Ratings