Majestic Appliances RDV4136 Always install horizontal venting on a level plane

Page 16

RDV4136 Series Direct Vent Gas Fireplace

X

FP1240

Fig. 23 Vertical height requirement.

STEP 4

Attach the appropriate venting component(s) to the inner and outer flue collars of the fireplace using three

(3) screws. (Fig. 24) Follow with the installation of the

STEP 6

Use appropriate length of pipe sections - telescopic or fixed - and install the horizontal vent sections. The sections which go through the wall are pack- aged with the starter kit, and can be cut to suit if necessary. (Fig. 25)

Sealing vent pipe and firestop gaps with high tem- perature seal- ant will restrict cold air being drawn in around fireplace.

STEP 7

FP1242

Fig. 25 Through the wall.

inner and outer elbow. Again secure joints with three (3)

sheet metal screws.

STEP 5

Measure the horizontal length requirement including a 2” (51 mm) overlap, ie from the elbow to the outside wall face plus 2” (51 mm) (or the distance required if installing a second 90° elbow). (Fig. 24)

Always install horizontal venting on a level plane.

X

FP1241

Fig. 24 Horizontal length requirement.

Guide the vent terminations 4” and 7” collars into their respective vent pipes. Double check that the vent pipes overlap the collars by 2” (51 mm). Secure the termina- tion to the wall with screws provided and caulk around the wall plate to weatherproof. (Fig. 26) As an alterna- tive to screwing the termination directly to the wall you may also use expanding plugs or an approved exterior construction adhesive. You may also attach the termi- nation with screws through the inner body into the 4” (102 mm) vent pipe however for this method you must extend the 4” (102 mm) pipe approximately 6” (152 mm) beyond the outer face of the wall.

FP1243

Fig. 26 Apply high temperature sealant to collars or termina- tions.

Support horizontal pipes every 3’ (914 mm) with metal pipe straps. Make sure the horizontal vent pipe is in- stalled on a level horizontal plane.

16

10010618

Image 16
Contents Builder Top Vent Direct Vent Models RDV4136 Table of Contents RDV4136 Certified To Installation & Operating InstructionsAnsi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Requirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedFireplace Dimensions Mantel Chart Locating Your FireplaceClearance to Combustibles MantelsGas Line Installation HearthFraming and Finishing Final FinishingInstallation RN/RP Models Remote ON/OFF SwitchInstallation IN/IP Models EB-1 Electrical Box EB-1 receptacleGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationCanadian Installations USA InstallationsGeneral Information on Assembling Vent Pipes Flex Vent PipesHow to Use the Vent Graph Twist Lock PipesExample a Example BInstall baffle to the deflector Vertical Sidewall ApplicationsVertical Sidewall Installation Twist Lock Pipe Zero clearance sleeve is only required for combustible wallsAlways install horizontal venting on a level plane Vertical height requirementBelow Grade Installations Vertical Sidewall Installation Flex Vent PipeStep Vertical Through-the-Roof Installation Vertical Through-the-Roof ApplicationsMin 610 mm Venting Components Window Frame Assembly Removal Glass CleaningOperating Instructions Glass InformationInstallation of Logs, Lava Rock & Ember Material Log InstallationLog Identification Chart LogsEmber Material Left Cross Log Right Cross Log Rear Log Front Flame Characteristics Correct pilot flame appearanceFor Fireplaces Equipped with the SIT 820 Valve Lighting and Operating InstructionsTo Turn Off Gas To Heater Lighting & Operating Instructions For Fireplaces equipped with AF4000 Gas ValveLighting Instructions Turning Off the Gas to the ApplianceTroubleshooting AF4000 ValveTroubleshooting AF4000 Valve Igniter operationAF4000 Valve Face Troubleshooting Honeywell VS8421 Remove Window Frame Assembly Before Service WorkSkyTech Valve Burner Orifice ConversionNova SIT820 Valve Pilot Orifice Conversion Injector Orifice Size MatrixMaintenance Cleaning the Standing Pilot Control SystemLogs May Be HOT Burner and Burner CompartmentRDV4136 Units GFSJ5J1RP RDV4136 Description RDV4136Fuel Conversion Kits Optional Accessories Fan AssemblyHard direct Wire Hook Up Wiring InstructionsRemote Controls Back-up Battery KitCeramic Refractory Panels Porcelain Steel BackLimited Lifetime Warranty Efficiency Ratings