Majestic Appliances RDV4136 Vertical Sidewall Installation Twist Lock Pipe

Page 15

A

B

7.5'

1 x 90° elbow in horizontal plane = 3’ (914mm)

(2.3m)

 

 

A + B = 17' (5.2m) Max.

 

FP1238

Fig. 19 Maximum vent run with elbows.

For each 45° elbow installed in the horizontal run, the length of the horizontal run MUST be reduced by 18” (457 mm). This does not apply if the 45° elbows are installed on the vertical part of the vent system.

The maximum number of elbow degrees in a system is 270°. (Fig. 20)

Vertical Sidewall Installation

Twist Lock Pipe

STEP 1

Locate vent opening on the wall. It may be necessary to first position the fireplace and measure to obtain hole location. Depending on whether the wall is combustible or noncombustible, cut opening to size. (Fig. 21)

For combustible walls first frame in opening.

Example:

 

 

 

 

Elbow 1

=

90°

 

Elbow 2

=

45°

4

Elbow 3

=

45°

Elbow 4

=

90°

 

 

 

 

 

 

Total angular variation

=

270°

 

1 + 2 + 3 + 4 = 270°

RDV4136 Series Direct Vent Gas Fireplace

NOTE: When using flex vent, the opening will have to be measured according to the 1/2” (13 mm) rise in 12” (305 mm) vent run.

Combustible Walls: (Fig. 21) Cut a 9³⁄”H x 9³⁄”W (240 x 240 mm) hole through the exterior wall and frame as shown.

Noncombustible Walls: (Fig. 21) Hole opening must be 7¹⁄” (190 mm) in diameter.

Vent Opening for Combustible Wall

9³⁄

(240mm)

 

 

 

 

 

 

Framing

9³⁄

 

 

Detail

 

 

 

(240mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fireplace Hearth

Opening for Noncombustible Wall

7¹⁄

(190mm)

VO584-100

Fig. 21 Locate vent opening on wall.

STEP 2

Measure wall thickness and cut zero clearance sleeve parts to proper length (MAXIMUM 12”/305 mm). Assem- ble sleeve and attach to firestop with #8 sheet metal screws (supplied). Install firestop assembly. (Fig. 22)

Zero clearance sleeve is only required for combustible walls.

Adjustable

Max. Length

12” (305mm)

Zero Clearance

 

Sleeve

 

 

#8 Screws (2)

#8 Screws

 

(2)

 

1

3

2

FP1239

 

#8 Screws

 

(2)

Firestop

 

Adjustable Zero Clearance Sleeve

ZCS101

Fig. 22 Adjustable zero clearance sleeve.

STEP 3

Place fireplace into position. (Fig. 23) Measure the verti-

Fig. 20 Maximum number of elbow degrees.

cal height (X) required from the base of the flue collars to the center of the wall opening.

10010618

15

Image 15
Contents Builder Top Vent Direct Vent Models RDV4136 Table of Contents Installation & Operating Instructions RDV4136 Certified ToAnsi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Gas Equipment Venting System not Provided Requirements for the Commonwealth of MassachusettsFireplace Dimensions Mantels Mantel ChartLocating Your Fireplace Clearance to CombustiblesFinal Finishing Gas Line InstallationHearth Framing and FinishingRemote ON/OFF Switch Installation RN/RP ModelsInstallation IN/IP Models EB-1 receptacle EB-1 Electrical BoxLocation of Vent Termination General VentingGeneral Venting Information Termination Location Canadian Installations1 US Installations2Flex Vent Pipes Canadian InstallationsUSA Installations General Information on Assembling Vent PipesExample B How to Use the Vent GraphTwist Lock Pipes Example aVertical Sidewall Applications Install baffle to the deflectorZero clearance sleeve is only required for combustible walls Vertical Sidewall Installation Twist Lock PipeVertical height requirement Always install horizontal venting on a level planeVertical Sidewall Installation Flex Vent Pipe Below Grade InstallationsStep Vertical Through-the-Roof Applications Vertical Through-the-Roof InstallationMin 610 mm Venting Components Glass Information Window Frame Assembly RemovalGlass Cleaning Operating InstructionsLogs Installation of Logs, Lava Rock & Ember MaterialLog Installation Log Identification ChartEmber Material Left Cross Log Right Cross Log Rear Log Front Correct pilot flame appearance Flame CharacteristicsLighting and Operating Instructions For Fireplaces Equipped with the SIT 820 ValveTo Turn Off Gas To Heater Turning Off the Gas to the Appliance Lighting & Operating InstructionsFor Fireplaces equipped with AF4000 Gas Valve Lighting InstructionsAF4000 Valve TroubleshootingIgniter operation Troubleshooting AF4000 ValveAF4000 Valve Face Remove Window Frame Assembly Before Service Work Troubleshooting Honeywell VS8421Burner Orifice Conversion SkyTech ValveNova SIT820 Valve Injector Orifice Size Matrix Pilot Orifice ConversionBurner and Burner Compartment MaintenanceCleaning the Standing Pilot Control System Logs May Be HOTRDV4136 Units GFSJ5J1RP Description RDV4136 RDV4136Fuel Conversion Kits Wiring Instructions Optional AccessoriesFan Assembly Hard direct Wire Hook UpPorcelain Steel Back Remote ControlsBack-up Battery Kit Ceramic Refractory PanelsLimited Lifetime Warranty Efficiency Ratings