Majestic Appliances RDV4136 installation instructions Troubleshooting Honeywell VS8421

Page 30

RDV4136 Series Direct Vent Gas Fireplace

 

Troubleshooting - Honeywell VS8421

 

Remove Window Frame Assembly Before Service Work

START

CHECK

Gas Supply On

YES

Pilot Lights With Piezo Ignitor

YES

Pilot Stays Lit

YES

Pilot Lights Main Burner

YES

SYSTEM OK

NO

NO

NO

NO

Supply Line Hooked Up

Shutoff Valve Open

Lockout Has Engaged. Wait 60 Seconds And Try Again.

For Spark At Electrode While Depressing Piezo

1/8" Gap To Pilot Hood Needed.

All Wiring Connections

Replace Piezo Ignitor

For Air In The Lines

Thermopile Needs A Min. 325m V. Adjust Pilot Flame Height.

All Wiring Connections

Replace Thermopile

Thermocouple Needs A Min. Of 14m V

Valve Is Turned On

Wall Switch Is Not Turned On. Watch For Grounded Wires!

Thermopile Needs A Min. 325m V.

Plugged Burner Orifice

Defective Valve. Turn to Pilot, Me- ter should rear greater than 100m V. If not, replace.

30

10010618

Image 30
Contents Builder Top Vent Direct Vent Models RDV4136 Table of Contents Installation & Operating Instructions RDV4136 Certified ToAnsi Z21.88-2005 / CSA Vented Gas Fireplace Heaters Requirements for the Commonwealth of Massachusetts Gas Equipment Venting System not ProvidedFireplace Dimensions Clearance to Combustibles Mantel ChartLocating Your Fireplace MantelsFraming and Finishing Gas Line InstallationHearth Final FinishingRemote ON/OFF Switch Installation RN/RP ModelsInstallation IN/IP Models EB-1 Electrical Box EB-1 receptacleGeneral Venting Location of Vent TerminationCanadian Installations1 US Installations2 General Venting Information Termination LocationGeneral Information on Assembling Vent Pipes Canadian InstallationsUSA Installations Flex Vent PipesExample a How to Use the Vent GraphTwist Lock Pipes Example BInstall baffle to the deflector Vertical Sidewall ApplicationsVertical Sidewall Installation Twist Lock Pipe Zero clearance sleeve is only required for combustible wallsAlways install horizontal venting on a level plane Vertical height requirementVertical Sidewall Installation Flex Vent Pipe Below Grade InstallationsStep Vertical Through-the-Roof Installation Vertical Through-the-Roof ApplicationsMin 610 mm Venting Components Operating Instructions Window Frame Assembly RemovalGlass Cleaning Glass InformationLog Identification Chart Installation of Logs, Lava Rock & Ember MaterialLog Installation LogsEmber Material Left Cross Log Right Cross Log Rear Log Front Flame Characteristics Correct pilot flame appearanceLighting and Operating Instructions For Fireplaces Equipped with the SIT 820 ValveTo Turn Off Gas To Heater Lighting Instructions Lighting & Operating InstructionsFor Fireplaces equipped with AF4000 Gas Valve Turning Off the Gas to the ApplianceTroubleshooting AF4000 ValveTroubleshooting AF4000 Valve Igniter operationAF4000 Valve Face Troubleshooting Honeywell VS8421 Remove Window Frame Assembly Before Service WorkBurner Orifice Conversion SkyTech ValveNova SIT820 Valve Pilot Orifice Conversion Injector Orifice Size MatrixLogs May Be HOT MaintenanceCleaning the Standing Pilot Control System Burner and Burner CompartmentRDV4136 Units GFSJ5J1RP RDV4136 Description RDV4136Fuel Conversion Kits Hard direct Wire Hook Up Optional AccessoriesFan Assembly Wiring InstructionsCeramic Refractory Panels Remote ControlsBack-up Battery Kit Porcelain Steel BackLimited Lifetime Warranty Efficiency Ratings