Epson HWDV080DV(N, P)-1 installation instructions Marker Flue Outlet Tube Collar

Page 22

CUTTING THE VENT TUBES

With the furnace installed on wall the 5" (127 mm) diameter air inlet tube and 3" (76 mm) diameter flue outlet tube are to be marked and cut using the following procedure. After cutting the tubes, each tube should be individually checked for proper length before installing by fitting in place.

3

4

Attach 5" (127 mm) diameter air inlet tube onto the collar of air drop assembly. Be sure 5" (127 mm) diameter air inlet tube is placed as far as possible onto the collar of the air drop assembly. Mark the 5" (127 mm) diameter air inlet tube 1 7/16" (36.5 mm) beyond the mounting surface for the outside wall plate. Remove 5" (127 mm) diameter air inlet tube from collar of air drop assembly.

MARKER

FLUE OUTLET TUBE

COLLAR OF

FLUE OUTLET

Attach 3" (76 mm) diameter flue outlet tube onto flue outlet collar on combustion chamber. Be sure 3" (76 mm) diameter flue outlet tube is placed as far as possible onto the collar of flue outlet. Mark the 3" (76 mm) diameter flue outlet tube 2 7/8" (73.0 mm) beyond the mounting surface for the outside wall plate. Remove 3" (76 mm) diameter flue outlet tube from collar of flue outlet on combustion chamber.

5

Mark or wrap tape completely around the tubes at the marked points to help in making a true cut. Do not crimp or enlarge tubes.

Page 22

24632-0-0508

Image 22
Contents Installation Table of Contents Included in the BOX Hardware Packets Tools NeededSpecifications GAS SpecificationsHigh Altitude Specifications Unit Dimensions Important Safety Information Follow State and Local codes for installationSafety Information for Users of LP-GAS LP-GAS Warning OdorInstructions to Installer IntroductionRequirements for Massachusetts DIRECTLYBELOW. Keepclear OFALLOBSTRUC- TionsDescription US Installations1 Termination ClearancesGAS Supply Locating Gas SupplyGAS Supply ClearancesInstallation Instructions Overview Location All ModelsInstallation and Assembly Installation OverviewClearances to Combustibles Mounting Template for HWDV080BDV HWDV181BDV Pilot Hole Interior Installation of the Front of the Unit Cutting the Vent Tubes Marker Flue Outlet Tube Collar Exterior Installation of the Venting DIA. Vent CAP Collar Furnace Cement Screws Reassembly and Resealing VENT-AIR Intake System DIA. Vent CAP Collar Furnace Cement Screws Installation of Optional Blower KIT HW125SCB Installation of Optional Blower KIT HW125SCB Installation of Optional Blower KIT HW125SCB Pull blower cord from bottom to remove any excess wire from Before Operating Appliance Before Operating Appliance Before Operating Appliance What to do if YOU Smell GAS Operating Instructions What to do if YOU Smell GASLighting Instructions To Turn OFF GAS to AppliancePilot Flame Characteristics Main Burner Flame CharacteristicsMaintenance Instructions Operation Frequency Faults to be Remarks PreventedHOW to Order Repair Parts TroubleshootingProblem Causes Solution Parts List Index no Description HWDV080 HWDV181Bulb Clip Parts View Service Notes Service Notes Service Notes Freeburg Ave. Belleville, IL 62220 PH877-459-1583 FAX