Bryant
340MAV
instruction manual
Install
Wiring
Dimension
START-UP Procedures General
Checklist
Safety
Pressure Switch Tubing
Inducer Housing Drain Cap
Heating Mode
Page 47
—47—
Page 46
Page 48
Image 47
Page 46
Page 48
Contents
Safety Considerations
Electrostatic Discharge ESD Precautions
Multipoise Orientations
Unit Size
Dimensions
Codes and Standards
Safety
II. General Installation
VI. GAS Piping and GAS Pipe Pressure Testing
VII. Electrical Connections
Electrostatic Discharge ESD Precautions
II. Upflow Applications
Introduction
Applications
General
Condensate Trap Tubing Alternate Upflow Orientation
Pressure Switch Tubing
Condensate Trap Tubing Factory-Shipped Orientation
Condensate Trap Location Alternate Upflow Orientation
Condensate Trap Tubing
III. Downflow Applications
Condensate Trap Location
Horizontal Left Tube Configuration
Horizontal Right SUPPLY-AIR Discharge Applications
IV. Horizontal Left SUPPLY-AIR Discharge Applications
Construct a Working Platform
Attic Location and Working Platform
Location
II. Furnace Location Relative to Cooling Equipment
Furnace Location for Proper Condensate Drainage
III. Hazardous Locations
II. Installation in Upflow or Downflow Applications
Installation Leveling Legs if Desired
III. Installation in Horizontal Applications
Width
Opening Dimensions
Furnace Plenum Opening Floor Opening Casing
II. Ductwork Acoustical Treatment
Duct Flanges
Filter Information
III. Supply AIR Connections
IV. Return AIR Connections
Filter Arrangement
Casings only
VI. Bottom Closure Panel
VII. GAS Piping
Maximum Capacity of Pipe
Electrical Connections
Fire or Explosion Hazard
III Accessories
Wiring
PCB
II. COMBUSTION-AIR and Vent Piping
Electrical Data
Direct Venting
Removal of Existing Furnaces from Common Vent Systems
Control Center
Clearance FT
COMBUSTION-AIR and Vent Pipe Termination Clearances
Combustion-Air and Vent Pipe Attachment
Combustion-Air and Vent Pipe Diameter
Example
Short Vent 5 to 8 Ft System
COMBUSTION-AIR Intake Housing Plug Fitting
Altitude FT
Maximum Allowable Pipe Length FT
6001 to 7000‡
Air Intake Housing Plug Fitting Drain
Two-Pipe Termination Kit
Vent Extension Pipe
Extended Exposed Sidewall Pipes
IV. Multiventing and Vent Terminations
Concentric Vent/Air Termination Kit
Roof Termination Preferred
Sidewall Termination of 12 in. or Less
III. Condensate Drain Protection
Condensate Drain General
II. Application
IV. Heat Pump Mode
Heating Mode
II. Cooling Mode
III. Continuous Blower Mode
II. Prime Condensate Trap with Water
START-UP Procedures General
IV. Adjustments
Component Test
Inducer Housing Drain Cap
BTU/CU FT
Orifice Manifold
625 650 Only 7001 675 725 8000 775 750 15% 825
2001to
725 750 Only 4001 775 800 825 5000 875 850 900 925
Canada
Example 100,000 Btuh Input Furnace Installed AT 4300 FT
Altitude Derate Multiplier
United States
Speed Selector
Blower OFF Delay Setup Position
Check Safety Controls
GAS Rate CU FT/HR
Check Primary Limit Control
II. Check Pressure Switch
Checklist
Combustion AIR Vent Piping
CHECKLIST-INSTALLATION
CHECKLIST-START-UP
Load Calculation
Related manuals
Manual
12 pages
2.16 Kb
Manual
44 pages
12.97 Kb
Top
Page
Image
Contents